|
---|
Category:Congressional Correspondence
MONTHYEARML21022A2212021-02-0505 February 2021 Letter to Senator Charles Schumer from Margaret Doane Response for NRC to Reconsider Its Decision to Not Allow for a Public Hearing in the Transfer of Indian Point'S License ML19262G4752019-10-0808 October 2019 10-08-19 - Ltr to the Honorable Edward J. Markey, Et Al., Responds to Concerns Related to the NRC Staff Recommendation Regarding a Request from Entergy for Exemptions from Emergency Preparedness and Planning Requirements for Pilgrim Nuclear ML19239A1452019-08-26026 August 2019 Letter to the Honorable Edward J. Markey from Rochelle C. Bavol, Acting Secretary of the Commission, Regarding the Pilgrim Nuclear Power Station License Transfer Request from Entergy and Holtec ML19233A2432019-08-21021 August 2019 LTR-19-0326 Sen Edward Markey, Sen Elizabeth Warren & REP William Keating, Letter Urges to Delay the Final Ruling on the Pilgrim Nuclear Power Station License Transfer Request from Entergy & Holtec Until After the Commission Has Ruled Upon ML19221B4792019-08-0808 August 2019 LTR-19-0310 Sen Edward J. Markey, Letter Urges the Chairman to Direct the NRC Staff to Delay Ruling on the Pilgrim Nuclear Power Station License Transfer Request from Entergy and Holtec (Docket No. 50-293 & 72-1004) ML18341A0162018-12-20020 December 2018 Letter to the Honorable William Keating Responds to His Letter Commenting on Recent NRC Inspection Reports Issued for the Pilgrim Nuclear Power Station ML18331A0402018-11-21021 November 2018 Acknowledgement Letter to Congressman William Keating on Pilgrim Inspection Report ML18228A6432018-08-28028 August 2018 Letter to Representative William Keating from Chairman Svinicki Responds to His Letter Regarding the Proposed Sale of Pilgrim Nuclear Power Station by Entergy Nuclear Operations Inc. to a Subsidiary of Holtec International ML18135A1022018-05-29029 May 2018 Letter to the Honorable Edward Markey from Chairman Svinicki Responds to His Letter Regarding Spent Fuel Storage at Pilgrim Nuclear Power Station and the Potential Impacts of Climate Change ML18127A0302018-05-0707 May 2018 Statement of Congressman William R. Keating - NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - 03/27/2018 ML18127A0312018-05-0707 May 2018 Statement of Senator Edward J. Markey - NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - 03/27/2018 ML18127A0322018-05-0707 May 2018 Statement of Senator Elizabeth Warren - NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - 03/27/2018 ML18066A0822018-03-19019 March 2018 Enclosure - Letter to Senator Elizabeth Warren, Et Al., from Chairman Svinicki Regarding Winter Storms and an Inspector for Pilgrim Nuclear Power Station ML16295A0892016-10-20020 October 2016 Letter to Senator Edward J. Markey Et Al., from Chairman Burns, Response to Letter Urging the Commission to Reject a Request from Entergy Nuclear Operations Inc. for an Extension of Time to Comply with NRC Order EA-13-109 ML16266A0652016-09-21021 September 2016 LTR-16-0469 Senator Edward J. Markey Et Al., Letter Request to Reject Entergy'S Efforts to Reduce Safety Requirements at Pilgrim ML15309A1282015-11-30030 November 2015 Letter to Senator Edward J. Markey, Et Al., from Chairman Burns Responds to His Letter Seeking Assurance That Decommissioning of Pilgrim Nuclear Power Station Will Be in Compliance with NRC Regulations (Response) ML15299A1142015-10-21021 October 2015 10-21-15 Ack Ltr to Honorable Edward J Markey - Pilgrim ML15289A1452015-10-15015 October 2015 LTR-15-0519 Senator Edward J. Markey, Letter Request to Ensure That the Remaining Period During Which the Pilgrim Nuclear Power Station Operates Receives the Utmost Attention to Safety and Security ML13079A2822013-03-26026 March 2013 G20130209/LTR-13-0224 Ltr. to Rep. E. Markey, Et Al. - Responds to Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Seabrook ML13079A0202013-03-18018 March 2013 G20130209/LTR-13-0224 - Ltr. Representatives Edward J. Markey, John F. Tierney and Bill Keating Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Sea ML13007A4062013-01-0202 January 2013 Comment (136) of Thomas J. Calter, State Representative on Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation ML12215A0212012-07-31031 July 2012 G20120556/LTR-12-0385/EDATS: SECY-2012-0393 - Rep. Edward J. Markey and Rep. Bill Keating Ltr. Emergency Response Capability at the Pilgrim Nuclear Generating Station During Labor Dispute ML12152A3892012-07-23023 July 2012 LTR-12-0187 - Ltr to Congressmen Edward Markey and William Keating from Chairman Macfarlane Responds to Letter Regarding the twenty-year Extension of Pilgrim Nuclear Power Station'S Operating License ML12191A3352012-07-23023 July 2012 G20120430/LTR-12-0277/EDATS: SECY-2012-0310 - Letter to Reps. Edward Markey and William Keating from Chairman Allison M. Macfarlane Concerns About Current Emergency Response Capabilities at Pilgrim Nuclear Generating Station ML12163A5022012-07-23023 July 2012 G20120371/LTR-12-0238/EDATS: OEDO-2012-0270 - Letter to Rep. Edward J. Markey from Chairman Allison M. Macfarlane Re Request That the Nuclear Regulatory Commission Deny Staff'S Request to Re-License the Pilgrim Nuclear Power Plant ML12172A3032012-06-0808 June 2012 G20120430/LTR-12-0277/EDATS: SECY-2012-0310 - Ltr. Reps. Edward Markey and William R. Keating Concerns the Current Emergency Response Capability at the Pilgrim Nuclear Generating Station ML12153A0262012-05-24024 May 2012 G20120371/LTR-12-0238/EDATS: SECY-2012-0270 - Ltr. Rep. Edward J. Markey Re Request That the Nuclear Regulatory Commission Deny Staff'S Request to Re-License the Pilgrim Nuclear Power Plant ML12145A6922012-05-0404 May 2012 LTR-12-0187 - Incoming from Rep Markey and Rep Keating to Chairman Jaczko Urging the Commission Not to Move Forward with Its Decision on Whether to Issue the twenty-year License Extension for Pilgrim Nuclear Power Station ML12079A2162012-03-21021 March 2012 G20120135/LTR-12-0080/EDATS: SECY-2012-0096 - Ltr to Rep. Edward J. Markey Fm R. W. Borchardt Re Pilgrim Nuclear Power Station ML12072A3032012-03-0808 March 2012 Letter from the Secretary to the Honorable Edward J. Markey in Response to His February 27, 2012 Letter ML12079A2182012-02-27027 February 2012 G20120135/LTR-12-0080/EDATS: SECY-2012-0096 - Responses to Information Requests from Representative Edward J. Markey ML12061A2152012-02-27027 February 2012 G20120135/LTR-12-0080/EDATS: SECY-2012-0096 Urges NRC Not to Relicense the Pilgrim Nuclear Power Station Until All Legal Requirements Stipulated by the Endangered Species Act Have Been Met CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 19712011-07-14014 July 2011 G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 ML11182B0232011-07-0505 July 2011 G20110446/LTR-11-0340/EDATS: SECY-2011-0337 - Ltr to Senator Scott P. Brown Fm R. W. Borchardt Pilgrim Nuclear Power Plan Safety Concerns ML11165A1792011-06-0202 June 2011 G20110446/LTR-11-0340/EDATS: SECY-2011-0337 - Ltr. Senator Scott P. Brown Pilgrim Nuclear Power Plant Safety Concerns ML11137A0422011-05-13013 May 2011 G20110354/LTR-11-0290/EDATS: SECY-2011-0290 - Ltr. Rep. Edward J. Markey Pilgrim Nuclear Power Plant - May 10, 2011 Event ML1113905652011-05-12012 May 2011 Fukushima Fallout Regulatory Loopholes at U.S. Nuclear Plants ML1110801492011-04-15015 April 2011 Acknowledgement Ltr. to R. Deleo Re Safety, Storage of Spent Fuel, and Seismic Vulnerability at the Pilgrim Nuclear Plant, and Forwarding Questions from Massachusetts' Legislative Leaders, Identical Ltrs Sent to T. Murray and D. Patrick ML1017903412010-07-21021 July 2010 G20100389/LTR-10-0270/EDATS: SECY-2010-0313 - Ltr, Gregory B. Jaczko Update on Status of the License Renewal Application for the Pilgrim Nuclear Power Plant ML1020004272010-07-15015 July 2010 G20100451/LTR-10-0327/EDATS: SECY-2010-0367 - Ltr. Rep. Edward J. Markey Recent Discovery of Radioactive Tritium Contamination Near the Pilgrim Nuclear Station ML1019700372010-07-0606 July 2010 G20100440/LTR-10-0325/EDATS: SECY-2010-0357 - Ltr. Rep. Bill Delahunt Status of License Renewal Application for Pilgrim Nuclear Plant ML1016701782010-06-0808 June 2010 G20100389/LTR-10-0270/EDATS: SECY-2010-0313 - Ltr, Senator John F. Kerry Update on Status of the License Renewal Application for the Pilgrim Nuclear Power Plant ML0407700142004-03-16016 March 2004 2003-04 Pilgrim Annual Assessment Invitational Letters for Safety Performance ML0323405522003-09-15015 September 2003 G20030490/LTR-03-0535 - Senator John F. Kerry Ltr. Emergency Planning in the Event of an Incident at the Pilgrim Nuclear Power Station ML0323205282003-07-28028 July 2003 G20030490/LTR-03-0535 - Sen. John F. Kerry Ltr Re Pilgrim Nuclear Power Station ML0307708712003-03-11011 March 2003 2003 Pilgrim Annual Assessment Invitational Letters ML0230101552002-12-10010 December 2002 G20020606/LTR-02-298 - Sen John Kerry Ltr. Security at Pilgrim, Response Ltr ML0403502672002-10-10010 October 2002 Letter from Sen. Kerry to Dennis Rathbun Regarding Constituent'S Concerns About Security at Pilgrim Nuclear Power Plant ML0207801702002-03-18018 March 2002 Pilgrim Nuclear Power Station - Annual Assessment Invitational Letters ML0209802492002-03-0808 March 2002 Appreciation Letter to Gary Holahan from Congressman William D. Delahunt 2021-02-05
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18
[Table view] |
Text
EDO Principal Correspondence Control FROM: DUE: 07/01/11 EDO CONTROL: G20110446 DOC DT: 06/02/11 FINAL REPLY:
Senator Scott P. Brown TO:
Schmidt, OCA FOR SIGNATURE OF : ** GRN ** CRC NO: 11-0340 Borchardt, EDO DESC: ROUTING:
Pilgrim Nuclear Power Plant Safety Concerns Borchardt (EDATS: SECY-2011-0337) Weber Virgilio Ash Muessle OGC/GC DATE: 06/14/11 Leeds, NRR Dean, RI ASSIGNED TO: CONTACT: Burns, OGC Schmidt, OCA EDO Rihm SPECIAL INSTRUCTIONS OR REMARKS:
Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). NRR and Region I to provide input to Roger Rihm, OEDO, if required. Roger Rihm to coordinate response with OGC and OCA.
S,ec-q - (b ý'i S cc(/ -0 (
EDATS Number: SECY-2011-0337 Source: SECY GeneralInfomaio Assigned To: OEDO OEDO Due Date: 7/1/2011 11:00 PM Other Assignees: SECY Due Date: 7/6/2011 11:00 PM
Subject:
Pilgrim Nuclear Power Plant Safety Concerns
==
Description:==
CC Routing: NRR; Regionl; OGC; OCA ADAMS Accession Numbers - Incoming: NONE Response/Package: NONE Othe Infomaton Cross Reference Number: G20110446, LTR- 11-0340 Staff Initiated: NO Related Task: Recurring Item: NO File Routing: EDATS Agency Lesson Learned: NO OEDO Monthly Report Item: NO Poes
'I Inomtd . I Action Type: Letter Priority: Medium Sensitivity: None Signature Level: EDO Urgency: NC )
Approval Level: No Approval Required OEDO Concurrence: NO OCM Concurrence: NO OCA Concurrence: NO Special Instructions: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). NRR and Region I to provide input to Roger Rihm, OEDO, if required. Roger Rihm to coordinate response with OGC and OCA.
Docmen I Inomtn I Originator Name: Senator Scott P. Brown Date of Incoming: 6/2/2011 Originating Organization: Congress Document Received by SECY Date: 6/13/2011 Addressee: Rebecca Schmidt, OCA Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 of I
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Jun 13, 2011 16:48 PAPER NUMBER: LTR- 11-0340 LOGGING DATE: 06/09/2011 ACTION OFFICE:
AUTHOR: SEN Scott Brown AFFILIATION: CONG ADDRESSEE: Rebecca Schmidt
SUBJECT:
Constituent correspondence - concerns about the possibility of a nuclear disaster occurring at the Pilgrim Nuclear Power Plant ACTION: Signature of EDO DISTRIBUTION: OCA to Ack LETTER DATE: 06/02/2011 ACKNOWLEDGED No SPECIAL HANDLING:
NOTES:
FILE LOCATION: ADAMS DATE DUE: 07/06/2011 DATE SIGNED:
EDO -- G20110446
SCOTT P. BROWN COMMITTEES:
MASSACHUSETTS HOMELAND SECURITY AND GOVERNMENTAL AFFAIRS 359 DIRKSEN SENATE OFFICEBUILDING 22i2444 DC 20510 WASHINGTON, ,it~. t . . ARMED SERVICES (202) 228-2646 FAX VETERANS' AFFAIRS 2400 JFK FEDERAL BUILDING WASHINGTON, DC 20510 SMALL BUSINESS BOSTON, MA 02203 (617) 565-3170 (617) 723-7325 FAX Ms. Rebecca Schrn idt Director, Office of Cdngresidnal Affmirs U*.S. Nuclear Regulatory CommiissiMn Washington, DC 20555 June 2, 2011 To Ms. Schmidt, I am writing to you today on behalf of a few constituents who are concerned about the possibility of a nuclear disaster occurring because they believe the Pilgrim Nuclear Power Plant in Plymouth, Massachusetts in unsafe.
The.40-year-old power plant is applying to the Nuclear Regulatory Commission to renew its license and continue operations for another 20 years. My constituents are concerned that if this request is approved, Plymouth; and the entire state of Massachusetts will be subjected to unnecessary risk of a nuclear disaster for In:20,10i;the NRC calculated the odds of catastrophic failure in each of the 104 nuclear reactors existing in the United States. The Pilgrim Nuclear Power Plant ranked second for risk of severe core damage. This at-risk reactor has the same General Electric Mark 1 design as five of Japan's six Fukushima reactors which experienced catastrophic failure in March and are still emitting radiation, contaminating the air, sea, and groundwater. ...
In addition to the at-risk reactor core, another concern is that the spent fuel rods stored in the plant's storage pool far exceed the pool's capacity. The original design limit of the pool was 880 assemblies. When this limit was exceeded, the NRC modified the regulation and allowed the very same pool to store 3,859 assemblies. In Japan's March 2011 Nuclear Disaster, it was the spent-fuel pool that leaked large amounts of radiation causing the disaster. If the generators at the Pilgrim Plant were ever to fail, a disaster of the same or even worse caliber could occur.
As a United States Senator representing the Commonwealth of Massachusetts, it is my responsibility to ensure the safety of my constituents and all of the citizens of Massachusetts. For this reason, I urge you to carefully. consider all public opinion before renewing the. Pilgrim Nuclear Power Plant's license.
Thank you for your consideration on this matter. Please do not hesitate to contact me for any further information regarding this issue.,
Sincerely,:: ,- -
United States Senator http://scottbrown.senate.gov
From: 05/31/2011 13:55 #294 P.002/003 63 Puritan Way Duxbury, MA 02332 781-934-0595 May 30, 2011 The Honorable Scott Brown United States Senate 359 Dirksen Senate Office Building Washington, DC. 20510-2102
Dear Senator Brown:
I recently read the letter to the Editor from Carol Dwyer of Concord in The Boston Globe (May 21, 2011, page 10 - A section) which referred to a study from the NRC which recalculated the odds of catastrophic failure in the reactors of the 104 US nuclear power plants and the fact that the Pilgrim Nuclear Power plant was ranked 2 "dfor risk of severe core damage. A previous article in The Boston Globe was written on another report that deems US nuclear plants are unsafe due to problems with nuclear backup power (May 13, 2011, Page A2).
I am asking for your help. I live in Duxbury, at 63 Puritan Way and I am approximately 10 miles away from the Pilgrim Nuclear Power Plant in Plymouth.
The Nuclear Regulatory Commission is thinking of renewing the license for Pilgrim and based on the many issues raised in the articles (as indicated above) I think the license should not be renewed. My neighbors and I are very concerned about the disasters that could arise in Plymouth and in our town and surrounding towns if these issues are not addressed prior to renewing the license. Based on the horror of what happened recently in Japan, we are extremely concerned. Please look into this matter and get back to me.
Sincerely, Margaret Delaney MD/bjc FAX: 202-228-2646 05/31/2011 3: 04PM (GMT-04:00)
NRC mustn't renew continue operations for another 20 years ("Problems cited with pool's capacity. When the orig design limit of 88 assemblieE license for Pilgrim nuclear backup power: Report was exceededb Ch nuclear plant comes as panel deems US sites the rules to allow the same pot safe,"Page A2, May 13 to have 3,859 assemblies. This THE 40-YEAR-OLD Pilgrim When-in 261othe recal- storage pool is septi.ve to a nuclear power plant in Plymouth culated the odds of catastrophic disastrous fire, bhitf.it snit cons is unsafe, and the Nuclear Regu- failure in each of the 104 US ered in the NRC's reviews for latory Commission should reject reactors, Pilgrim ranked second license renewal. The spent fue*
its request to renew its license to ,*p ris of severe core dam". pool at Pilgrim contains many Th-Nl~igrini reactor is the same times the radiation in Chernob General Electric Mark 1 design as and a fire could contaminate a2 five of the six Fukushima re- area three times the size of Ma.,
Letters should be written exclusively to the Globe and actors, which are still, two sachusetts.
includename, address,and months after the March 11 earth- The NRC decisions on reneN daytime number. They should be quake, emitting high levels of ing licenses appear to be biasec 200 words orfewer; all are radiation into the groundwater, in favor of the power companie subject to editing.Letters to the sea, and air. The agency has approved every Most significant, the Pilgrim request - 66 in a row.
0 Editor,The Boston Globe, POBox En plant's highly radioactive spent We need to speak up.
55819, Boston, MA 02205-5819; fuel rods are stored in apool of CAROL DWYI letter@globe.corn;fax:617-929-2098. water at nearly four times the CO71(
C) 5,
._0 Q0 CA 0 -'o
-F C-D 0 CD I SD
-1 0
-F 0
0