Category:Letter
MONTHYEARML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23194A0442023-07-11011 July 2023 Clarification for Indian Point Energy Center License Amendment Request, Independent Spent Fuel Storage Installation Physical Security Plan ML23192A1002023-07-11011 July 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme ML23171B0432023-06-23023 June 2023 Letter - Indian Point Energy Center - Request for Additional Information for Independent Spent Fuel Storage Installation Facility-Only Emergency Plan License Amendment ML23118A0972023-06-0606 June 2023 06-06-23 Letter to the Honorable Michael V. Lawler, Et Al., from Chair Hanson Regarding Holtec'S Announcement to Expedite Plans to Release Over 500,000 Gallons of Radioactive Wastewater from Indian Point Energy Center Into the Hudson River ML23144A3512023-05-25025 May 2023 Clementina Bartolotta of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3522023-05-25025 May 2023 Loredana Bidmead of New York E-Mail Against Treated Water Release from Indian Point Site ML23144A3412023-05-25025 May 2023 Dianne Schirripa of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23144A3472023-05-25025 May 2023 David Mart of Blauvelt, New York Email Against Treated Water Release from Indian Point Site ML23144A3402023-05-25025 May 2023 Melvin Israel of New York Email Against Treated Water Release from Indian Point Site ML23144A3542023-05-25025 May 2023 Terri Thal of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3532023-05-25025 May 2023 John Shaw of New York Email Against Treated Water Release from Indian Point Site 2024-01-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23171B0442023-06-23023 June 2023 Enclosure - Indian Point Energy Center - Request for Additional Information for Independent Spent Fuel Storage Installation Facility-Only Emergency Plan License Amendment ML22292A2402022-10-21021 October 2022 RAIs for Master Dtf Agreement on IP1 IP2 10 18 2022 ML22103A2442022-04-13013 April 2022 Attachment - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0352022-04-13013 April 2022 Request for Additional Information Related to Exemption Request from Emergency Planning Holtec Decommissioning International, LLC Indian Point Energy Center ML22006A0452022-01-0505 January 2022 PSDAR RAIs Final ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21183A1602021-06-30030 June 2021 Update Request for Additional Information - Indian Point Energy Center Quality Assurance Program Manual (06/30/2021 E-mail) ML21138A9412021-05-18018 May 2021 Request for Additional Information - Indian Point Energy Center Quality Assurance Program Manual (05/18/2021 E-mail) ML21112A2672021-04-22022 April 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (Public Redacted Version) ML21019A5672021-01-19019 January 2021 Second Round Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device ML21013A0152021-01-12012 January 2021 Draft Request for Additional Information (E-mail Dated 1/12/2021) License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device ML20268C2352020-09-24024 September 2020 Request for Additional Information (E-mail Dated 9/24/20) License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device ML20233B0152020-08-20020 August 2020 Request for Additional Information (E-mail Dated 8/20/20) License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device ML20190A2342020-07-0808 July 2020 Request for Additional Information - Application for Order Consenting to Transfers of Control of Licenses (07/08/2020 E-mail) ML20190A1502020-06-25025 June 2020 (06/25/2020 E-mail) Draft Request for Additional Information Application for Order Consenting to Transfers of Control of Licenses ML20106F2492020-04-15015 April 2020 E-mail (04/15/2020) Request for Additional Information Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic ML20070J7902020-03-10010 March 2020 Request for Information to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000286/2020012 ML19045A6252019-02-14014 February 2019 Request for Additional Information - Proposed License Amendment Request Regarding Storage of Fresh and Spent Nuclear Fuel in the Spent Fuel Pool - 2/14/19 E-mail from R.Guzman to M.Mirzai NL-18-053, Response to Request for Additional Information Regarding Relief Request IP3-ISI-RR-11 for Reactor Vessel Weld Inservice Inspection Frequency Extension2018-07-18018 July 2018 Response to Request for Additional Information Regarding Relief Request IP3-ISI-RR-11 for Reactor Vessel Weld Inservice Inspection Frequency Extension ML18155A4842018-06-0404 June 2018 Request for Additional Information Regarding Relief Request IP3-ISI-RR-11, E-mail from R.Guzman to C.Mackaman ML18143B6792018-05-23023 May 2018 Request for Additional Information Regarding LAR for One-Time Extension of the Containment Leakage Rate Test - Email from R.Guzman to M.Mirzai ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML17296A2352017-10-23023 October 2017 Request for Additional Information -10/23/17 E-mail from R.Guzman to R.Louie Cyber Security Plan Milestone 8 Implementation Schedule (CAC Nos. MF9656, MF9657, MF9658; EPID: L-2017-LLA-0217) ML17277B5482017-10-0303 October 2017 Request for Additional Information - Relief Request IP2-ISI-RR-20 Regarding Weld Examination ML17219A1062017-08-10010 August 2017 Request for Additional Information Regarding Inter-Unit Transfer of Spent Fuel - Shielded Transfer Canister Requests for Additional Information ML17200A0852017-07-19019 July 2017 Request for Additional Information Regarding the Connection of Non-Seismic Boric Acid Recovery System to RWST Seismic Piping ML17197A0002017-07-17017 July 2017 Request for Additional Information Regarding Inter-Unit Transfer of Spent Fuel ML17170A2862017-06-27027 June 2017 RAI Set 2017-06 ML17103A4182017-04-25025 April 2017 Baffle Bolt Rais. Requests for Additional Information for the Review of the Indian Point License Renewal Application (TAC Nos. MD5407 and MD5408) ML17088A4052017-04-20020 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-3 (CAC Nos. MD5407 and MD5408) ML17088A3272017-04-19019 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 (CAC Nos. MD5407 and MD5408) ML17100A1282017-04-11011 April 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment of Inter Unit Transfer of Spent Fuel ML17046A2312017-03-0808 March 2017 Request for Additional Information for the Review of the Indian Point License Renewal - Set 2017-01 ML16232A1192016-09-12012 September 2016 Request for Additional Information for the Review of the Indian Point Nuclear Generating Units Nos. 2 and 3, License Renewal Application Environmental Review - Severe Accident Mitigation Alternatives (CAC Nos. MD5411 and MD5412) ML16138A1942016-07-25025 July 2016 Request for Additional Information for the Review of License Renewal Application, Set 2016-01 ML16139A0302016-06-10010 June 2016 Request for Additional Information Regarding Conditional Exemption from End-of-Line Moderator Temperature Coefficient Measurement ML16112A2262016-04-26026 April 2016 Request for Additional Information Regarding Relief Request IP2-ISI-RR-02 Alternative Examination Volume Required by Code Case N-729-1 ML16041A5782016-02-18018 February 2016 Request for Additional Information Related to License Amendment Request Regarding Moderator Temperature Coefficient Measurement Change ML16005A6292016-01-14014 January 2016 Request for Additional Information Regarding Relief Request IP2-RR-19 ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML15148A4032015-06-29029 June 2015 Request for Additional Information Regarding the Spent Fuel Pool Criticality Analysis ML15156B2742015-06-16016 June 2015 Request for Additional Information Regarding Request to Permanently Extend the Frequency of the Containment Integrated Leak Rate Test ML15125A0972015-05-0606 May 2015 Request for Additional Information Regarding License Amendment to Permanently Extend the Frequency of the Containment Integrated Leak Rate Test ML15071A1012015-05-0404 May 2015 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2015-01 (TAC Nos. MD5407 and MD5408) ML15103A2592015-04-28028 April 2015 Request for Additional Information Regarding the Proposed License Amendment to Extend the Containment Type a Leak Rate Testing Frequency to 15 Years ML15104A5412015-04-22022 April 2015 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application Environmental Review (TAC Nos. MD5411 and MD5412) ML15072A4172015-03-17017 March 2015 Request for Additional Information Regarding Extension of the Containment Type a Leak Rate Testing Frequency to 15 Years ML14329B2452015-02-18018 February 2015 Request for Additional Information for the Review of the Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Environmental Review (TAC Nos. MD5411 and MD5412) CNRO-2015-00008, Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company2015-02-18018 February 2015 Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company 2023-06-23
[Table view] |
Text
April 6, 2004 Mr. Michael R. Kansler, President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE INSPECTION REPORTS FOR THE 2003 OUTAGE, INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 (TAC NO. MC1912)
Dear Mr. Kansler:
In letter dated April 25, August 19, and December 8, 2003, Entergy Nuclear Operations, Inc.
(ENO) submitted reports summarizing the steam generator (SG) tube inspections performed at Indian Point Nuclear Generating Unit No. 3 (IP3) during refueling outage 12 in April 2003.
The Nuclear Regulatory Commission staff is reviewing the information provided in these submittals and has determined that additional information is needed to complete its review.
The specific questions are found in the enclosed request for additional information (RAI).
During a telephone call on March 26, 2004, the ENO staff indicated that a response to the RAI would be provided within 60 days.
If you should have any questions, please do not hesitate to call me.
Sincerely,
/RA/
Patrick D. Milano, Sr. Project Manager, Section 1 Project Directorate 1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-286
Enclosure:
RAI cc w/encl: See next page
April 6, 2004 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE INSPECTION REPORTS FOR THE 2003 OUTAGE, INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 (TAC NO. MC1912)
Dear Mr. Kansler:
In letters dated April 25, August 19, and December 8, 2003, Entergy Nuclear Operations, Inc.
(ENO) submitted reports summarizing the steam generator (SG) tube inspections performed at Indian Point Nuclear Generating Unit No. 3 (IP3) during refueling outage 12 in April 2003.
The Nuclear Regulatory Commission staff is reviewing the information provided in these submittals and has determined that additional information is needed to complete its review.
The specific questions are found in the enclosed request for additional information (RAI).
During a telephone call on March 26, 2004, the ENO staff indicated that a response to the RAI would be provided within 60 days.
If you should have any questions, please do not hesitate to call me.
Sincerely,
/RA/
Patrick D. Milano, Sr. Project Manager, Section 1 Project Directorate 1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-286
Enclosure:
RAI cc w/encl: See next page DISTRIBUTION PUBLIC R. Laufer K. Karwoski C. Bixler, RGN-I PDI-1 Reading P. Milano S. Little OGC A. Howe L. Lund B. McDermott, RGN-I ACRS Accession Number: ML040970028 OFFICE PDI-1:PM PDI-1:LA EMCB:SC PDI-1:SC NAME PMilano SLittle LLund AHowe for RLaufer DATE 03/30/04 04/05/04 04/02/04 04/05/04 OFFICIAL RECORD COPY
Indian Point Nuclear Generating Unit No. 3 cc:
Mr. Gary Taylor Ms. Charlene Faison Chief Executive Officer Manager, Licensing Entergy Operations, Inc. Entergy Nuclear Operations, Inc.
1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John Herron Director of Oversight Senior Vice President and Entergy Nuclear Operations, Inc.
Chief Operating Officer 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601 Mr. James Comiotes Director, Nuclear Safety Assurance Mr. Fred Dacimo Entergy Nuclear Operations, Inc.
Vice President, Operations Indian Point Energy Center Entergy Nuclear Operations, Inc. 295 Broadway, Suite 2 Indian Point Energy Center P.O. Box 249 295 Broadway, Suite 2 Buchanan, NY 10511-0249 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Patric Conroy Manager, Licensing Mr. Christopher Schwarz Entergy Nuclear Operations, Inc.
General Manager, Plant Operations Indian Point Energy Center Entergy Nuclear Operations, Inc. 295 Broadway, Suite 2 Indian Point Energy Center P. O. Box 249 295 Broadway, Suite 2 Buchanan, NY 10511-0249 P.O. Box 249 Buchanan, NY 10511-0249 Mr. John M. Fulton Assistant General Counsel Mr. Dan Pace Entergy Nuclear Operations, Inc.
Vice President Engineering 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. Randall Edington 475 Allendale Road Vice President Operations Support King of Prussia, PA 19406 Entergy Nuclear Operations, Inc.
440 Hamilton Avenue Senior Resident Inspector, Indian Point 3 White Plains, NY 10601 U. S. Nuclear Regulatory Commission 295 Broadway, Suite 1 Mr. John McCann P.O. Box 337 Director, Nuclear Safety Assurance Buchanan, NY 10511-0337 Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
Indian Point Nuclear Generating Unit No. 3 cc:
Mr. Peter R. Smith, President Mr. Dan C. Poole New York State Energy, Research, and PWR SRC Consultant Development Authority 20 Captains Cove Road Corporate Plaza West Inglis, FL 34449 286 Washington Avenue Extension Albany, NY 12203-6399 Mr. William T. Russell PWR SRC Consultant Mr. Paul Eddy 400 Plantation Lane Electric Division Stevensville, MD 21666-3232 New York State Department of Public Service Mr. Alex Matthiessen 3 Empire State Plaza, 10th Floor Executive Director Albany, NY 12223 Riverkeeper, Inc.
25 Wing & Wing Mr. Charles Donaldson, Esquire Garrison, NY 10524 Assistant Attorney General New York Department of Law Mr. Paul Leventhal 120 Broadway The Nuclear Control Institute New York, NY 10271 1000 Connecticut Avenue NW Suite 410 Mayor, Village of Buchanan Washington, DC, 20036 236 Tate Avenue Buchanan, NY 10511 Mr. Karl Coplan Pace Environmental Litigation Clinic Mr. Ray Albanese 78 No. Broadway Executive Chair White Plains, NY 10603 Four County Nuclear Safety Committee Westchester County Fire Training Center Mr. Jim Riccio 4 Dana Road Greenpeace Valhalla, NY 10592 702 H Street, NW Suite 300 Ms. Stacey Lousteau Washington, DC 20001 Treasury Department Entergy Services, Inc. Mr. Robert D. Snook 639 Loyola Avenue Assistant Attorney General Mail Stop: L-ENT-15E State of Connecticut New Orleans, LA 70113 55 Elm Street P.O. Box 120 Mr. William DiProfio Hartford, CT 06141-0120 PWR SRC ConsultaNT 139 Depot Road East Kingston, NH 03827
Indian Point Nuclear Generating Unit No. 3 cc:
Mr. David Lochbaum Nuclear Safety Engineer Union of Concerned Scientists 1707 H Street NW, Suite 600 Washington, DC 20006
REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE INSPECTIONS ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 (IP3)
DOCKET NO. 50-286 In letters dated April 25 (ADAMS Accession No. ML031200250), August 19 (ML032330262),
and December 8, 2003 (ML033450339), Entergy Nuclear Operations summarized the steam generator (SG) tube inservice inspection (ISI) performed at IP3 during refueling outage (RFO)
- 12. The Nuclear Regulatory Commission (NRC) staff has the following questions regarding the information provided in these reports:
- 1. The SGs at IP3 were replaced in 1989 with Westinghouse Model No. 44F SGs. In several locations, the reports reference tube support structures (e.g., 1C) and tube locations (e.g., Row 29, Column 17). In order for the NRC staff to better understand the location of the indications, provide a sketch of the IP3 SGs that depicts the tube and support naming conventions. In addition, provide the following general design information: (a) tube manufacturer and (b) tube support (including anti-vibration bar) thickness. Discuss reference datum for the measurements from a tube support such that it is clear whether the measurements are from the middle of the support or the edge of the support (e.g., does AV2 minus 0.6 inch specify an indication 0.6 inch from the bottom edge of the second anti vibration bar?).
- 2. Provide the completion date for RFO 11 and state whether any SG tube inspections were performed during that RFO. The staff notes that the August 19 report implies that inspections were performed (i.e., ...wear scars were not identified during Refueling Outage 11 because sludge lancing occurred after the ISI.). However, the December 8 report indicates that no eddy current inspections were performed.
- 3. Provide the completion date for your SG tube inspections in 1999.
- 4. Three tubes were reported as having restrictions such that a 0.700-inch bobbin probe could not pass through the U-bend region. Discuss: (a) the largest size probe that passed through these tubes during RFO 12, (b) the largest size probe that ever passed through these tubes, and (c) the source of these restrictions. Also, provide the bend radii of the first three rows of tubes.
- 5. All hot leg dents in the straight section of the tubes were inspected with a rotating probe if the dent voltage was greater than 5 volts. Discuss whether the calibration procedure (for measuring dent size) is consistent with the guidance described in Generic Letter (GL) 95-05, Voltage-Based Repair Criteria for Westinghouse Steam Generator Tubes Affected by Outside Diameter Stress Corrosion Cracking, or is consistent with industry guidelines. Also, discuss whether the dents and dings found during the RFO 12 Enclosure
inspection were traceable back to the baseline inspection and discuss any changes in magnitude. If the dents or dings are not traceable to your baseline inspection and/or have changed in magnitude, discuss the reason for any change.
- 6. One tube was classified as having a trackable anomaly. Define this classification.
- 7. Clarify whether the tubes with possible loose parts signals were visually inspected to confirm the nature of any potential loose parts. Provide the location of these indications.
If visual inspections were not performed and/or the part was not removed, discuss the analyses performed to ensure these potential parts do not compromise tube integrity for the period of time between inspections.
- 8. In 1997, a free span bobbin indication was identified in one tube in SG 34 (Row 8, Column 21). During that outage, a rotating probe inspection was performed at this location which revealed the presence of a small ding. Discuss whether any indications were identified in this region of the tube during your 2003 outage, and discuss whether the bobbin signal has continued to change.
- 9. During the 1997 outage, possible indications of erosion-corrosion were identified in two J-tube joints (refer to page 11 of 31 of the December 19, 1997, report). The report further indicated that these J-tubes would be reinspected at a later outage to determine if the erosion-corrosion is progressing. Have these additional inspections been performed? If so, describe the results of these inspections.
- 10. The staffs review of the 2003 inspection results included referring back to the previous inspection results which were provided by letter dated December 17, 1999. In reviewing this document (ML003670350), it appears that portions of Attachment 2 were not incorporated into the NRCs document management system. Provide a copy of Attachment 2 to the December 17, 1999, letter.