License Amendment Nos. 293 & 283 Regarding Extending the Inspection Interval for Reactor Coolant Pump Flywheels (TS 04-02)
ML041960466
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/08/2004
From: Robert Pascarelli
NRC/NRR/DLPM/LPD2
To: Singer K
Tennessee Valley Authority
Pascarelli,R J,NRC/NRR/DIPM,415-1245
Shared Package
ML041970395 List:
References
TAC MC2448, TAC MC2449
Download: ML041960466 (12)


Text

July 8, 2004 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 ISSUANCE OF AMENDMENTS REGARDING EXTENDING THE INSPECTION INTERVAL FOR REACTOR COOLANT PUMP FLYWHEELS (TAC NOS. MC2448 AND MC2449) (TS 04-02)

Dear Mr. Singer:

The Commission has issued the enclosed Amendment No. 293 to Facility Operating License No. DPR-77 and Amendment No. 283 to Facility Operating License No. DPR-79 for the Sequoyah Nuclear Plant, Units 1 and 2, respectively. These amendments are in response to your application dated March 5, 2004.

The amendments revise Technical Specification 4.0.5.c by extending the reactor coolant pump flywheel inspection interval from 10 years to 20 years.

A copy of the Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Sincerely,

/RA/

Robert J. Pascarelli, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328

Enclosures:

1. Amendment No. 293 to License No. DPR-77
2. Amendment No. 283 to License No. DPR-79
3. Safety Evaluation cc w/enclosures: See next page

July 8, 2004 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 ISSUANCE OF AMENDMENTS REGARDING EXTENDING THE INSPECTION INTERVAL FOR REACTOR COOLANT PUMP FLYWHEELS (TAC NOS. MC2448 AND MC2449) (TS 04-02)

Dear Mr. Singer:

The Commission has issued the enclosed Amendment No. 293 to Facility Operating License No. DPR-77 and Amendment No. 283 to Facility Operating License No. DPR-79 for the Sequoyah Nuclear Plant, Units 1 and 2, respectively. These amendments are in response to your application dated March 5, 2004.

The amendments revise Technical Specification 4.0.5.c by extending the reactor coolant pump flywheel inspection interval from 10 years to 20 years.

A copy of the Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Sincerely,

/RA/

Robert J. Pascarelli, Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328

Enclosures:

1. Amendment No. 293 to License No. DPR-77
2. Amendment No. 283 to License No. DPR-79
3. Safety Evaluation cc w/enclosures: See next page DISTRIBUTION: See next page Package: ML041970395 Enclosure 1: ML041970244 ADAMS ACCESSION NO. ML041960466 Enclosure 2: ML041970247 NRR-058 OFFICE CLIIP LPM PDII-2/PM PDII-2/LA OGC PDII-2/SC (A)

NAME WReckley RPascarelli BClayton GLongo MMarshall DATE 05/21/04 6/30/04 6/30/04 06/29/04 7/08/04 OFFICIAL RECORD COPY

DISTRIBUTION FOR SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 ISSUANCE OF AMENDMENTS REGARDING EXTENDING THE INSPECTION INTERVAL FOR REACTOR COOLANT PUMP FLYWHEELS (TAC NOS. MC2448 AND MC2449) (TS 04-02)

DISTRIBUTION:

PUBLIC PDII-2 R/F RidsNrrDlpmDpr RidsNrrDlpmpdii (EHackett)

RidsNrrDlpmLpdii2 (MMarshall)

RidsNrrPMRPascarelli RidsNrrLABClayton (Hard Copy)

RidsRgn2MailCenter (SCahill)

RidsAcrsAcnwMailCenter(GHIll) 4 hard copies RidsOgcRp GHill (4 Copies)

TBoyce WReckley

Mr. Karl W. Singer SEQUOYAH NUCLEAR PLANT Tennessee Valley Authority cc:

Mr. Ashok S. Bhatnagar, Senior Vice President Mr. Pedro Salas, Manager Nuclear Operations Licensing and Industry Affairs Tennessee Valley Authority Sequoyah Nuclear Plant 6A Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Soddy Daisy, TN 37379 Mr. James E. Maddox, Vice President Mr. David A. Kulisek, Plant Manager Engineering & Technical Services Sequoyah Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P.O. Box 2000 1101 Market Street Soddy Daisy, TN 37379 Chattanooga, TN 37402-2801 Senior Resident Inspector Mr. Randy Douet Sequoyah Nuclear Plant Site Vice President U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Tennessee Valley Authority Soddy Daisy, TN 37379 P.O. Box 2000 Soddy Daisy, TN 37379 Mr. Lawrence E. Nanney, Director Division of Radiological Health General Counsel Dept. of Environment & Conservation Tennessee Valley Authority Third Floor, L and C Annex ET 11A 401 Church Street 400 West Summit Hill Drive Nashville, TN 37243-1532 Knoxville, TN 37902 County Mayor Mr. T. J. Niessen, Acting General Manager Hamilton County Courthouse Nuclear Assurance Chattanooga, TN 37402-2801 Tennessee Valley Authority 6A Lookout Place Ms. Ann P. Harris 1101 Market Street 341 Swing Loop Road Chattanooga, TN 37402-2801 Rockwood, Tennessee 37854 Mr. Mark J. Burzynski, Manager Nuclear Licensing Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801

TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-327 SEQUOYAH NUCLEAR PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 293 License No. DPR-77

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Tennessee Valley Authority (the licensee) dated March 5, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-77 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 293, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance, to be implemented no later than 45 days after issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Michael L. Marshall, Jr., Acting Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: July 8, 2004

ATTACHMENT TO LICENSE AMENDMENT NO. 293 FACILITY OPERATING LICENSE NO. DPR-77 DOCKET NO. 50-327 Replace the following page of the Appendix A Technical Specifications with the attached page.

The revised page is identified by amendment number and contains a marginal line indicating the area of change.

REMOVE INSERT 3/4 0-2 3/4 0-2

TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-328 SEQUOYAH NUCLEAR PLANT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 283 License No. DPR-79

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Tennessee Valley Authority (the licensee) dated March 5, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-79 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 283, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance, to be implemented no later than 45 days after issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Michael L. Marshall, Jr., Acting Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: July 8, 2004

ATTACHMENT TO LICENSE AMENDMENT NO. 283 FACILITY OPERATING LICENSE NO. DPR-79 DOCKET NO. 50-328 Replace the following page of the Appendix A Technical Specifications with the attached page.

The revised page is identified by amendment number and contains a marginal line indicating the area of change.

REMOVE INSERT 3/4 0-2 3/4 0-2

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 293 TO FACILITY OPERATING LICENSE NO. DPR-77 AND AMENDMENT NO. 283 TO FACILITY OPERATING LICENSE NO. DPR-79 TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-327 AND 50-328

1.0 INTRODUCTION

By application dated March 5, 2004, the Tennessee Valley Authority (the licensee) proposed amendments to the Technical Specifications (TSs) for Sequoyah Nuclear Plant (SQN) Units 1 and 2.

The proposed changes would extend the reactor coolant pump (RCP) motor flywheel examination frequency from the currently approved 10-year inspection interval to an interval not to exceed 20 years. These changes are based on Technical Specification Task Force (TSTF) change traveler TSTF-421 (Revision 0) that has been approved generically for the Westinghouse Standard Technical Specifications (STSs), NUREG-1431. A notice announcing the availability of this proposed TS change using the consolidated line item improvement process (CLIIP) was published in the Federal Register on October 22, 2003 (68 FR 60422).

2.0 REGULATORY EVALUATION

The function of the RCP in the reactor coolant system (RCS) of a pressurized-water reactor plant is to maintain an adequate cooling flow rate by circulating a large volume of primary coolant water at high temperature and pressure through the RCS. Following an assumed loss of power to the RCP motor, the flywheel, in conjunction with the impeller and motor assembly, provides sufficient rotational inertia to assure adequate primary coolant flow during RCP coastdown, thus resulting in adequate core cooling. A concern regarding the overspeed of the RCP and its potential for failure led to the issuance of Regulatory Guide (RG) 1.14, "Reactor Coolant Pump Flywheel Integrity," Revision 1, dated August 1975. RG 1.14 describes a method acceptable to the Nuclear Regulatory Commission (NRC) staff of addressing concerns related to RCP vibration and the possible effects of missiles that might result from the failure of the RCP flywheel. The need to protect components important to safety from such missiles are included in General Design Criterion 4, "Environmental and Dynamic Effects Design Basis," of Appendix A, "General Design Criteria for Nuclear Power Plants," to Title 10, Code of Federal Regulations (10 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," which is applicable to plants that obtained their construction permits after May 21, 1971.

Specific requirements to have an RCP flywheel inspection program consistent with RG 1.14 or previously issued relaxations from the RG are included in the Administrative Controls Section of the STSs (included in the Surveillance Requirements (SRs) Section of the SQN TSs). The purpose of the testing and inspection programs defined in the TSs is to ensure that the probability of a flywheel failure is sufficiently small such that additional safety features are not needed to protect against a flywheel failure. The RG provides criteria in terms of critical speeds that could result in the failure of an RCP flywheel during normal or accident conditions. In addition to the guidance in RG 1.14, the NRC has more recently issued RG 1.174, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," which provides guidance and criteria for evaluating proposed changes that use risk-informed justifications.

A proposed justification for extending the RCP flywheel inspections from a 10-year inspection interval to an interval not to exceed 20 years was provided by the Westinghouse Owners Group (WOG) in Topical Report (TR) WCAP-15666, "Extension of Reactor Coolant Pump Motor Flywheel Examination," transmitted by letter dated August 24, 2001. The TR addressed the proposed extension for all domestic WOG plants. The NRC accepted the TR for referencing in license applications in a letter and safety evaluation dated May 5, 2003 (ADAMS Accession No. ML031250595).

3.0 TECHNICAL EVALUATION

TS 4.0.5.c, which governs the reactor coolant pump flywheel inspection program, reflects the licensees previous adoption of a TS change that defined the allowable alternative to the inspections described in RG 1.14. The inspections are defined as in-place ultrasonic examination over the volume from the inner bore of the flywheel to the circle of one-half the outer radius or an alternative surface examination (magnetic particle testing [MT] and/or liquid penetrant testing [PT]) of exposed surfaces defined by the volume of the disassembled flywheel. The allowable interval for these inspections was extended in the previous amendment to "once every ten years coinciding with the inservice inspection schedule as required by ASME

[American Society of Mechanical Engineers, Boiler and Pressure Vessel Code],Section XI."

The change proposed in this amendment application would revise the allowable inspection interval to "20-year intervals."

The justification for the proposed change was provided in WCAP-15666, which the staff accepted for referencing in license applications by a letter and safety evaluation dated May 5, 2003. The TR addresses the three critical speeds defined in RG 1.14: (a) the critical speed for ductile failure, (b) the critical speed for non-ductile failure, and (c) the critical speed for excessive deformation of the flywheel. The staff found that the TR adequately addressed these issues and demonstrated that acceptance criteria, for normal and accident conditions defined in RG 1.14, would continue to be met for all domestic WOG plants following an extension of the inspection interval. The TR also provided a risk assessment for extending the RCP flywheel inspection interval. The staffs review, documented in the safety evaluation for the TR, determined that the analysis methods and risk estimates are acceptable when compared to the guidance in RG 1.174.

In conclusion, the staff finds that the regulatory positions in RG 1.14 concerning the three critical speeds are satisfied, and that the evaluation indicating that critical crack sizes are not expected to be attained during a 20-year inspection interval is reasonable and acceptable. The potential for failure of the RCP flywheel is, and will continue to be, negligible during normal and accident conditions. The change is, therefore, acceptable.

The TSs for SQN have not been converted to the STSs format and the requirements for the RCP flywheel inspections are contained in the SR Section of the TSs instead of the Administrative Controls Section (Section 5 in the STSs) as described in TSTF-421. As a result, the licensee added a statement to TS 4.0.5.c to exclude the provisions of TS 4.0.2, which would otherwise allow the inspection interval to be extended up to 25 percent. The staff agrees that the exclusion of the TS 4.0.2 provision is appropriate to ensure that the allowable inspection interval does not exceed 20 years. The requirements and format of the SQN TSs are otherwise similar to those reviewed and addressed in the model safety evaluation published as part of the CLIIP.

4.0 STATE CONSULTATION

In accordance with the Commissions regulations, the Tennessee State official was notified of the proposed issuance of the amendment. The State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes SRs.

The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (69 FR 19577; April 13, 2004). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: W. Reckley Dated: July 8, 2004