January 25, 2021 Mr. James Barstow Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A-C Chattanooga, TN 37402-2801
SUBJECT:
SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2; AND WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 - ISSUANCE OF AMENDMENT NOS. 352, 346, 141, AND 47 REGARDING THE ADOPTION OF TECHNICAL SPECIFICATION TASK FORCE TRAVELER, TSTF-569, REVISION 2, REVISE RESPONSE TIME TESTING DEFINITION (EPID L-2020-LLA-0133)
Dear Mr. Barstow:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment Nos. 352 and 346 to Renewed Facility Operating License Nos. DPR-77 and DPR-79, for the Sequoyah Nuclear Plant, Units 1 and 2, respectively; and Amendment Nos. 141 and 47 to Facility Operating License Nos. NPF-90 and NPF-96 for the Watts Bar Nuclear Plant, Units 1 and 2, respectively. These amendments are in response to your application dated June 16, 2020.
The amendments revise the Technical Specifications to adopt Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition.
A copy of the Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions monthly Federal Register notice.
Sincerely,
/RA/
Michael J. Wentzel, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327, 50-328, 50-390 and 50-391
Enclosures:
- 1. Amendment No. 352 to DPR-77
- 2. Amendment No. 346 to DPR-79
- 3. Amendment No. 141 to NPF-90
- 4. Amendment No. 47 to NPF-96
- 5. Safety Evaluation cc: Listserv
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-327 SEQUOYAH NUCLEAR PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 352 Renewed License No. DPR-77
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Tennessee Valley Authority (the licensee) dated June 16, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR)
Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-77 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 352, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of its date of issuance, to be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Undine S. Shoop, Chief Plant Licensing Branch II-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: January 25, 2021 Undine S.
Shoop Digitally signed by Undine S. Shoop Date: 2021.01.25 15:28:36 -05'00'
ATTACHMENT TO LICENSE AMENDMENT NO. 352 SEQUOYAH NUCLEAR PLANT, UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. DPR-77 DOCKET NO. 50-327 Replace page 3 of the Renewed Facility Operating License with the attached page 3.
Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 1.1-3 1.1-3 1.1-5 1.1-5 Amendment No. 352 Renewed License No. DPR-77 (3)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the Sequoyah and Watts Bar Unit 1 Nuclear Plants.
C.
This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The Tennessee Valley Authority is authorized to operate the facility at reactor core power levels not in excess of 3455 megawatts thermal.
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 352 are hereby incorporated into the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3)
Initial Test Program The Tennessee Valley Authority shall conduct the post-fuel-loading initial test program (set forth in Section 14 of Tennessee Valley Authoritys Final Safety Analysis Report, as amended), without making any major modifications of this program unless modifications have been identified and have received prior NRC approval. Major modifications are defined as:
- a.
Elimination of any test identified in Section 14 of TVAs Final Safety Analysis Report as amended as being essential;
- b.
Modification of test objectives, methods, or acceptance criteria for any test identified in Section 14 of TVAs Final Safety Analysis Report as amended as being essential;
'HILQLWLRQV
6(482<$++/-81,7
$PHQGPHQW352
'HILQLWLRQV
(1*,1((5('6$)(7<
7KH(6)5(63216(7,0(VKDOOEHWKDWWLPHLQWHUYDOIURP
)($785((6)5(63216(
ZKHQWKHPRQLWRUHGSDUDPHWHUH[FHHGVLWVDFWXDWLRQ
7,0(
VHWSRLQWDWWKHFKDQQHOVHQVRUXQWLOWKH(6)HTXLSPHQWLV
FDSDEOHRISHUIRUPLQJLWVVDIHW\\IXQFWLRQLHWKHYDOYHV
WUDYHOWRWKHLUUHTXLUHGSRVLWLRQVSXPSGLVFKDUJHSUHVVXUHV
UHDFKWKHLUUHTXLUHGYDOXHVHWF7LPHVVKDOOLQFOXGHGLHVHO
JHQHUDWRUVWDUWLQJDQGVHTXHQFHORDGLQJGHOD\\VZKHUH
DSSOLFDEOH7KHUHVSRQVHWLPHPD\\EHPHDVXUHGE\\PHDQV
RIDQ\\VHULHVRIVHTXHQWLDORYHUODSSLQJRUWRWDOVWHSVVRWKDW
WKHHQWLUHUHVSRQVHWLPHLVPHDVXUHG,QOLHXRI
PHDVXUHPHQWUHVSRQVHWLPHPD\\EHYHULILHGIRUVHOHFWHG
FRPSRQHQWVSURYLGHGWKDWWKHFRPSRQHQWVDQGPHWKRGRORJ\\
IRUYHULILFDWLRQKDYHEHHQSUHYLRXVO\\UHYLHZHGDQGDSSURYHG
E\\WKH15&RUWKHFRPSRQHQWVKDYHEHHQHYDOXDWHGLQ
DFFRUGDQFHZLWKDQ15&DSSURYHGPHWKRGRORJ\\
/($.$*(
/($.$*(VKDOOEH
D
,GHQWLILHG/($.$*(
/($.$*(VXFKDVWKDWIURPSXPSVHDOVRUYDOYH SDFNLQJH[FHSWUHDFWRUFRRODQWSXPS5&3VHDO ZDWHULQMHFWLRQRUOHDNRIIWKDWLVFDSWXUHGDQG FRQGXFWHGWRFROOHFWLRQV\\VWHPVRUDVXPSRU FROOHFWLQJWDQN
/($.$*(LQWRWKHFRQWDLQPHQWDWPRVSKHUHIURP VRXUFHVWKDWDUHERWKVSHFLILFDOO\\ORFDWHGDQG NQRZQHLWKHUQRWWRLQWHUIHUHZLWKWKHRSHUDWLRQRI OHDNDJHGHWHFWLRQV\\VWHPVRUQRWWREHSUHVVXUH ERXQGDU\\/($.$*(RU
5HDFWRU&RRODQW6\\VWHP5&6/($.$*(
WKURXJKDVWHDPJHQHUDWRUWRWKH6HFRQGDU\\
6\\VWHPSULPDU\\WRVHFRQGDU\\/($.$*(
E
8QLGHQWLILHG/($.$*(
$OO/($.$*(H[FHSW5&3VHDOZDWHULQMHFWLRQRU OHDNRIIWKDWLVQRWLGHQWLILHG/($.$*(DQG F
3UHVVXUH%RXQGDU\\/($.$*(
/($.$*(H[FHSWSULPDU\\WRVHFRQGDU\\/($.$*(
WKURXJKDQRQLVRODEOHIDXOWLQDQ5&6FRPSRQHQWERG\\
SLSHZDOORUYHVVHOZDOO
'HILQLWLRQV
6(482<$++/-81,7
'HILQLWLRQV
48$'5$1732:(57,/7
4375VKDOOEHWKHUDWLRRIWKHPD[LPXPXSSHUH[FRUH
5$7,24375
GHWHFWRUFDOLEUDWHGRXWSXWWRWKHDYHUDJHRIWKHXSSHUH[FRUH
GHWHFWRUFDOLEUDWHGRXWSXWVRUWKHUDWLRRIWKHPD[LPXPORZHU
H[FRUHGHWHFWRUFDOLEUDWHGRXWSXWWRWKHDYHUDJHRIWKHORZHU
H[FRUHGHWHFWRUFDOLEUDWHGRXWSXWVZKLFKHYHULVJUHDWHU
5$7('7+(50$/32:(5
573VKDOOEHDWRWDOUHDFWRUFRUHKHDWWUDQVIHUUDWHWRWKH
573
UHDFWRUFRRODQWRI0:W
5($&72575,36<67(0
7KH5765(63216(7,0(VKDOOEHWKDWWLPHLQWHUYDOIURP
5765(63216(7,0(
ZKHQWKHPRQLWRUHGSDUDPHWHUH[FHHGVLWV576WULSVHWSRLQW
DWWKHFKDQQHOVHQVRUXQWLOORVVRIVWDWLRQDU\\JULSSHUFRLO
YROWDJH7KHUHVSRQVHWLPHPD\\EHPHDVXUHGE\\PHDQVRI
DQ\\VHULHVRIVHTXHQWLDORYHUODSSLQJRUWRWDOVWHSVVRWKDW
WKHHQWLUHUHVSRQVHWLPHLVPHDVXUHG,QOLHXRI
PHDVXUHPHQWUHVSRQVHWLPHPD\\EHYHULILHGIRUVHOHFWHG
FRPSRQHQWVSURYLGHGWKDWWKHFRPSRQHQWVDQGPHWKRGRORJ\\
IRUYHULILFDWLRQKDYHEHHQSUHYLRXVO\\UHYLHZHGDQGDSSURYHG
E\\WKH15&RUWKHFRPSRQHQWVKDYHEHHQHYDOXDWHGLQ
DFFRUGDQFHZLWKDQ15&DSSURYHGPHWKRGRORJ\\
6+87'2:10$5*,16'0
6'0VKDOOEHWKHLQVWDQWDQHRXVDPRXQWRIUHDFWLYLW\\E\\
ZKLFKWKHUHDFWRULVVXEFULWLFDORUZRXOGEHVXEFULWLFDOIURPLWV
SUHVHQWFRQGLWLRQDVVXPLQJ
D
$OOURGFOXVWHUFRQWURODVVHPEOLHV5&&$VDUHIXOO\\
LQVHUWHGH[FHSWIRUWKHVLQJOH5&&$RIKLJKHVWUHDFWLYLW\\
ZRUWKZKLFKLVDVVXPHGWREHIXOO\\ZLWKGUDZQ:LWK DQ\\5&&$QRWFDSDEOHRIEHLQJIXOO\\LQVHUWHGWKH UHDFWLYLW\\ZRUWKRIWKH5&&$PXVWEHDFFRXQWHGIRULQ WKHGHWHUPLQDWLRQRI6'0DQG E
,Q02'(6DQGWKHIXHODQGPRGHUDWRU WHPSHUDWXUHVDUHFKDQJHGWRWKHQRPLQDO]HURSRZHU GHVLJQOHYHO
6/$9(5(/$<7(67
$6/$9(5(/$<7(67VKDOOFRQVLVWRIHQHUJL]LQJDOOVODYH
UHOD\\VLQWKHFKDQQHOUHTXLUHGIRUFKDQQHO23(5$%,/,7<DQG
YHULI\\LQJWKH23(5$%,/,7<RIHDFKUHTXLUHGVODYHUHOD\\
7KH6/$9(5(/$<7(67VKDOOLQFOXGHDFRQWLQXLW\\FKHFNRI
DVVRFLDWHGUHTXLUHGWHVWDEOHDFWXDWLRQGHYLFHV7KH6/$9(
5(/$<7(67PD\\EHSHUIRUPHGE\\PHDQVRIDQ\\VHULHVRI
VHTXHQWLDORYHUODSSLQJRUWRWDOVWHSV
$PHQGPHQW352
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-328 SEQUOYAH NUCLEAR PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 346 Renewed License No. DPR-79
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Tennessee Valley Authority (the licensee) dated June 16, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR)
Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-79 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 346, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Undine S. Shoop, Chief Plant Licensing Branch II-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: January 25, 2021 Undine S.
Shoop Digitally signed by Undine S. Shoop Date: 2021.01.25 15:29:38 -05'00'
ATTACHMENT TO LICENSE AMENDMENT NO. 346 SEQUOYAH NUCLEAR PLANT, UNIT 2 RENEWED FACILITY OPERATING LICENSE NO. DPR-79 DOCKET NO. 50-328 Replace page 3 of the Renewed Facility Operating License with the attached page 3.
Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 1.1-3 1.1-3 1.1-5 1.1-5 Amendment No. 346 Renewed License No. DPR-79 (3)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the Sequoyah and Watts Bar Unit 1 Nuclear Plants.
C.
This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The Tennessee Valley Authority is authorized to operate the facility at reactor core power levels not in excess of 3455 megawatts thermal.
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 346 are hereby incorporated into the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3)
Initial Test Program The Tennessee Valley Authority shall conduct the post-fuel-loading initial test program (set forth in Section 14 of Tennessee Valley Authority's Final Safety Analysis Report, as amended), without making any major modifications of this program unless modifications have been identified and have received prior NRC approval. Major modifications are defined as:
- a.
Elimination of any test identified in Section 14 of TVA's Final Safety Analysis Report as amended as being essential;
'HILQLWLRQV
6(482<$++/-81,7
'HILQLWLRQV
(1*,1((5('6$)(7<
7KH(6)5(63216(7,0(VKDOOEHWKDWWLPHLQWHUYDOIURP
)($785((6)5(63216(
ZKHQWKHPRQLWRUHGSDUDPHWHUH[FHHGVLWVDFWXDWLRQ
7,0(
VHWSRLQWDWWKHFKDQQHOVHQVRUXQWLOWKH(6)HTXLSPHQWLV
FDSDEOHRISHUIRUPLQJLWVVDIHW\\IXQFWLRQLHWKHYDOYHV
WUDYHOWRWKHLUUHTXLUHGSRVLWLRQVSXPSGLVFKDUJHSUHVVXUHV
UHDFKWKHLUUHTXLUHGYDOXHVHWF7LPHVVKDOOLQFOXGHGLHVHO
JHQHUDWRUVWDUWLQJDQGVHTXHQFHORDGLQJGHOD\\VZKHUH
DSSOLFDEOH7KHUHVSRQVHWLPHPD\\EHPHDVXUHGE\\PHDQV
RIDQ\\VHULHVRIVHTXHQWLDORYHUODSSLQJRUWRWDOVWHSVVRWKDW
WKHHQWLUHUHVSRQVHWLPHLVPHDVXUHG,QOLHXRI
PHDVXUHPHQWUHVSRQVHWLPHPD\\EHYHULILHGIRUVHOHFWHG
FRPSRQHQWVSURYLGHGWKDWWKHFRPSRQHQWVDQGPHWKRGRORJ\\
IRUYHULILFDWLRQKDYHEHHQSUHYLRXVO\\UHYLHZHGDQGDSSURYHG
E\\WKH15&RUWKHFRPSRQHQWVKDYHEHHQHYDOXDWHGLQ
DFFRUGDQFHZLWKDQ15&DSSURYHGPHWKRGRORJ\\
/($.$*(
/($.$*(VKDOOEH
D
,GHQWLILHG/($.$*(
/($.$*(VXFKDVWKDWIURPSXPSVHDOVRUYDOYH SDFNLQJH[FHSWUHDFWRUFRRODQWSXPS5&3VHDO ZDWHULQMHFWLRQRUOHDNRIIWKDWLVFDSWXUHGDQG FRQGXFWHGWRFROOHFWLRQV\\VWHPVRUDVXPSRU FROOHFWLQJWDQN
/($.$*(LQWRWKHFRQWDLQPHQWDWPRVSKHUHIURP VRXUFHVWKDWDUHERWKVSHFLILFDOO\\ORFDWHGDQG NQRZQHLWKHUQRWWRLQWHUIHUHZLWKWKHRSHUDWLRQRI OHDNDJHGHWHFWLRQV\\VWHPVRUQRWWREHSUHVVXUH ERXQGDU\\/($.$*(RU
5HDFWRU&RRODQW6\\VWHP5&6/($.$*(
WKURXJKDVWHDPJHQHUDWRUWRWKH6HFRQGDU\\
6\\VWHPSULPDU\\WRVHFRQGDU\\/($.$*(
E
8QLGHQWLILHG/($.$*(
$OO/($.$*(H[FHSW5&3VHDOZDWHULQMHFWLRQRU OHDNRIIWKDWLVQRWLGHQWLILHG/($.$*(DQG F
3UHVVXUH%RXQGDU\\/($.$*(
/($.$*(H[FHSWSULPDU\\WRVHFRQGDU\\/($.$*(
WKURXJKDQRQLVRODEOHIDXOWLQDQ5&6FRPSRQHQWERG\\
SLSHZDOORUYHVVHOZDOO
$PHQGPHQW346
'HILQLWLRQV
6(482<$++/-81,7
'HILQLWLRQV
48$'5$1732:(57,/7
4375VKDOOEHWKHUDWLRRIWKHPD[LPXPXSSHUH[FRUH
5$7,24375
GHWHFWRUFDOLEUDWHGRXWSXWWRWKHDYHUDJHRIWKHXSSHUH[FRUH
GHWHFWRUFDOLEUDWHGRXWSXWVRUWKHUDWLRRIWKHPD[LPXPORZHU
H[FRUHGHWHFWRUFDOLEUDWHGRXWSXWWRWKHDYHUDJHRIWKHORZHU
H[FRUHGHWHFWRUFDOLEUDWHGRXWSXWVZKLFKHYHULVJUHDWHU
5$7('7+(50$/32:(5
573VKDOOEHDWRWDOUHDFWRUFRUHKHDWWUDQVIHUUDWHWRWKH
573
UHDFWRUFRRODQWRI0:W
5($&72575,36<67(0
7KH5765(63216(7,0(VKDOOEHWKDWWLPHLQWHUYDOIURP
5765(63216(7,0(
ZKHQWKHPRQLWRUHGSDUDPHWHUH[FHHGVLWV576WULSVHWSRLQW
DWWKHFKDQQHOVHQVRUXQWLOORVVRIVWDWLRQDU\\JULSSHUFRLO
YROWDJH7KHUHVSRQVHWLPHPD\\EHPHDVXUHGE\\PHDQVRI
DQ\\VHULHVRIVHTXHQWLDORYHUODSSLQJRUWRWDOVWHSVVRWKDW
WKHHQWLUHUHVSRQVHWLPHLVPHDVXUHG,QOLHXRI
PHDVXUHPHQWUHVSRQVHWLPHPD\\EHYHULILHGIRUVHOHFWHG
FRPSRQHQWVSURYLGHGWKDWWKHFRPSRQHQWVDQGPHWKRGRORJ\\
IRUYHULILFDWLRQKDYHEHHQSUHYLRXVO\\UHYLHZHGDQGDSSURYHG
E\\WKH15&RUWKHFRPSRQHQWVKDYHEHHQHYDOXDWHGLQ
DFFRUGDQFHZLWKDQ15&DSSURYHGPHWKRGRORJ\\
6+87'2:10$5*,16'0
6'0VKDOOEHWKHLQVWDQWDQHRXVDPRXQWRIUHDFWLYLW\\E\\
ZKLFKWKHUHDFWRULVVXEFULWLFDORUZRXOGEHVXEFULWLFDOIURPLWV
SUHVHQWFRQGLWLRQDVVXPLQJ
D
$OOURGFOXVWHUFRQWURODVVHPEOLHV5&&$VDUHIXOO\\
LQVHUWHGH[FHSWIRUWKHVLQJOH5&&$RIKLJKHVWUHDFWLYLW\\
ZRUWKZKLFKLVDVVXPHGWREHIXOO\\ZLWKGUDZQ:LWK DQ\\5&&$QRWFDSDEOHRIEHLQJIXOO\\LQVHUWHGWKH UHDFWLYLW\\ZRUWKRIWKH5&&$PXVWEHDFFRXQWHGIRULQ WKHGHWHUPLQDWLRQRI6'0DQG E
,Q02'(6DQGWKHIXHODQGPRGHUDWRU WHPSHUDWXUHVDUHFKDQJHGWRWKHQRPLQDO]HURSRZHU GHVLJQOHYHO
6/$9(5(/$<7(67
$6/$9(5(/$<7(67VKDOOFRQVLVWRIHQHUJL]LQJDOOVODYH
UHOD\\VLQWKHFKDQQHOUHTXLUHGIRUFKDQQHO23(5$%,/,7<DQG
YHULI\\LQJWKH23(5$%,/,7<RIHDFKUHTXLUHGVODYHUHOD\\
7KH6/$9(5(/$<7(67VKDOOLQFOXGHDFRQWLQXLW\\FKHFNRI
DVVRFLDWHGUHTXLUHGWHVWDEOHDFWXDWLRQGHYLFHV7KH6/$9(
5(/$<7(67PD\\EHSHUIRUPHGE\\PHDQVRIDQ\\VHULHVRI
VHTXHQWLDORYHUODSSLQJRUWRWDOVWHSV
$PHQGPHQW346
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-390 WATTS BAR NUCLEAR PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 141 License No. NPF-90
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Tennessee Valley Authority (the licensee) dated June 16, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR)
Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-90 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 141 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. TVA shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION Undine S. Shoop, Chief Plant Licensing Branch II-2 Division of operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Operating License and Technical Specifications Date of Issuance: January 25, 2021 Undine S.
Shoop Digitally signed by Undine S. Shoop Date: 2021.01.25 15:31:14 -05'00'
ATTACHMENT TO AMENDMENT NO. 141 WATTS BAR NUCLEAR PLANT, UNIT 1 FACILITY OPERATING LICENSE NO. NPF-90 DOCKET NO. 50-390 Replace page 3 of Facility Operating License No. NPF-90 with the attached revised page 3.
Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
Remove Insert 1.1-3 1.1-3 1.1-5 1.1-5 Facility License No. NPF-90 Amendment No. 141 (4)
TVA, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required, any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis, instrument calibration, or other activity associated with radioactive apparatus or components; and (5)
TVA, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified or incorporated below.
(1)
Maximum Power Level TVA is authorized to operate the facility at reactor core power levels not in excess of 3459 megawatts thermal.
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 141 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. TVA shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3)
Safety Parameter Display System (SPDS) (Section 18.2 of SER Supplements 5 and 15)
Prior to startup following the first refueling outage, TVA shall accomplish the necessary activities, provide acceptable responses, and implement all proposed corrective actions related to having the Watts Bar Unit 1 SPDS operational.
(4)
Vehicle Bomb Control Program (Section 13.6.9 of SSER 20)
During the period of the exemption granted in paragraph 2.D.(3) of this license, in implementing the power ascension phase of the approved initial test program, TVA shall not exceed 50% power until the requirements of 10 CFR 73.55(c)(7) and (8) are fully implemented. TVA shall submit a letter under oath or affirmation when the requirements of 73.55(c)(7) and (8) have been fully implemented.
'HILQLWLRQV
'HILQLWLRQVFRQWLQXHG
FRQWLQXHG
- DWWV%DU8QLW
$PHQGPHQW141
²$9(5$*(
VKDOOEHWKHDYHUDJHZHLJKWHGLQSURSRUWLRQWRWKH
',6,17(*5$7,21(1(5*<
FRQFHQWUDWLRQRIHDFKUDGLRQXFOLGHLQWKHUHDFWRUFRRODQWDWWKH
WLPHRIVDPSOLQJRIWKHVXPRIWKHDYHUDJHEHWDDQGJDPPD
HQHUJLHVSHUGLVLQWHJUDWLRQLQ0H9IRULVRWRSHVRWKHUWKDQ
LRGLQHVZLWKKDOIOLYHV!PLQXWHVPDNLQJXSDWOHDVWRI
WKHWRWDOQRQLRGLQHDFWLYLW\\LQWKHFRRODQW
(1*,1((5('6$)(7<
7KH(6)5(63216(7,0(VKDOOEHWKDWWLPHLQWHUYDOIURP
)($785((6)5(63216(
ZKHQWKHPRQLWRUHGSDUDPHWHUH[FHHGVLWV(6)DFWXDWLRQ
7,0(
VHWSRLQWDWWKHFKDQQHOVHQVRUXQWLOWKH(6)HTXLSPHQWLV
FDSDEOHRISHUIRUPLQJLWVVDIHW\\IXQFWLRQLHWKHYDOYHVWUDYHOWR
WKHLUUHTXLUHGSRVLWLRQVSXPSGLVFKDUJHSUHVVXUHVUHDFKWKHLU
UHTXLUHGYDOXHVHWF7LPHVVKDOOLQFOXGHGLHVHOJHQHUDWRU
VWDUWLQJDQGVHTXHQFHORDGLQJGHOD\\VZKHUHDSSOLFDEOH7KH
UHVSRQVHWLPHPD\\EHPHDVXUHGE\\PHDQVRIDQ\\VHULHVRI
VHTXHQWLDORYHUODSSLQJRUWRWDOVWHSVVRWKDWWKHHQWLUHUHVSRQVH
WLPHLVPHDVXUHG,QOLHXRIPHDVXUHPHQWUHVSRQVHWLPHPD\\
EHYHULILHGIRUVHOHFWHGFRPSRQHQWVSURYLGHGWKDWWKH
FRPSRQHQWVDQGWKHPHWKRGRORJ\\IRUYHULILFDWLRQKDYHEHHQ
SUHYLRXVO\\UHYLHZHGDQGDSSURYHGE\\WKH15&RUWKH
FRPSRQHQWVKDYHEHHQHYDOXDWHGLQDFFRUGDQFHZLWKDQ15&
DSSURYHGPHWKRGRORJ\\
/D
7KHPD[LPXPDOORZDEOHSULPDU\\FRQWDLQPHQWOHDNDJHUDWH/D
VKDOOEHRISULPDU\\FRQWDLQPHQWDLUZHLJKWSHUGD\\DWWKH
FDOFXODWHGSHDNFRQWDLQPHQWSUHVVXUH3D
/($.$*(
/($.$*(VKDOOEH
D
,GHQWLILHG/($.$*(
/($.$*(VXFKDVWKDWIURPSXPS VHDOVRUYDOYHSDFNLQJH[FHSWUHDFWRU FRRODQWSXPS5&3VHDOZDWHULQMHFWLRQ RUOHDNRIIWKDWLVFDSWXUHGDQG FRQGXFWHGWRFROOHFWLRQV\\VWHPVRUD VXPSRUFROOHFWLQJWDQN
/($.$*(LQWRWKHFRQWDLQPHQW DWPRVSKHUHIURPVRXUFHVWKDWDUHERWK VSHFLILFDOO\\ORFDWHGDQGNQRZQHLWKHUQRW WRLQWHUIHUHZLWKWKHRSHUDWLRQRIOHDNDJH GHWHFWLRQV\\VWHPVRUQRWWREHSUHVVXUH ERXQGDU\\/($.$*(RU
Definitions 1.1 1.1 Definitions (continued)
(continued)
Watts Bar - Unit 1 1.1-5 Amendment 24, 31, 141 PHYSICS TESTS a.
Described in Chapter 14, Initial Test Program of the (continued)
FSAR; b.
Authorized under the provisions of 10 CFR 50.59; or c.
Otherwise approved by the Nuclear Regulatory Commission.
PRESSURE AND TEMPERATURE LIMITS REPORT QUADRANT POWER TILT RATIO (QPTR)
RATED THERMAL POWER (RTP)
REACTOR TRIP SYSTEM (RTS) RESPONSE TIME SHUTDOWN MARGIN (SDM)
The PTLR is the unit specific document that provides the RCS pressure and temperature limits for heatup, cooldown, low temperature operation, criticality, and hydrostatic testing as well as heatup and cooldown rates for the current reactor vessel fluence period. These pressure and temperature limits shall be determined for each fluence period in accordance with Specification 5.9.6. Plant operation within these operating limits is addressed in LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," and LCO 3.4.12, "Cold Overpressure Mitigation System (COMS)."
QPTR shall be the ratio of the maximum upper excore detector calibrated output to the average of the upper excore detector calibrated outputs, or the ratio of the maximum lower excore detector calibrated output to the average of the lower excore detector calibrated outputs, whichever is greater.
RTP shall be a total reactor core heat transfer rate to the reactor coolant of 3459 MWt.
The RTS RESPONSE TIME shall be that time interval from when the monitored parameter exceeds its RTS trip setpoint at the channel sensor until loss of stationary gripper coil voltage.
The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and the methodology for verification have been previously reviewed and approved by the NRC, or the components have been evaluated in accordance with an NRC approved methodology.
SDM shall be the instantaneous amount of reactivity by which the reactor is subcritical or
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-391 WATTS BAR NUCLEAR PLANT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 47 License No. NPF-96
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Tennessee Valley Authority (TVA) dated June 16, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR)
Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-96 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 47 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. TVA shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION Undine S. Shoop, Chief Plant Licensing Branch II-2 Division of operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Operating License and Technical Specifications Date of Issuance: January 25, 2021 Undine S.
Shoop Digitally signed by Undine S. Shoop Date: 2021.01.25 15:32:00 -05'00'
ATTACHMENT TO AMENDMENT NO. 47 WATTS BAR NUCLEAR PLANT, UNIT 2 FACILITY OPERATING LICENSE NO. NPF-96 DOCKET NO. 50-391 Replace page 3 of Facility Operating License No. NPF-96 with the attached revised page 3.
Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
Remove Insert 1.1-3 1.1-3 1.1-6 1.1-6 Unit 2 Facility Operating License No. NPF-96 Amendment No. 47 C.
The license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act, and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified or incorporated below.
(1)
Maximum Power Level TVA is authorized to operate the facility at reactor core power levels not in excess of 3459 megawatts thermal.
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 47 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. TVA shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3)
TVA shall implement permanent modifications to prevent overtopping of the embankments of the Fort Loudon Dam due to the Probable Maximum Flood by June 30, 2018.
(4)
PAD4TCD may be used to establish core operating limits until the WBN Unit 2 steam generators are replaced with steam generators equivalent to the existing steam generators at WBN Unit 1.
(5)
By December 31, 2019, the licensee shall report to the NRC that the actions to resolve the issues identified in Bulletin 2012-01, Design Vulnerability in Electrical Power System, have been implemented.
(6)
The licensee shall maintain in effect the provisions of the physical security plan, security personnel training and qualification plan, and safeguards contingency plan, and all amendments made pursuant to the authority of 10 CFR 50.90 and 50.54(p).
(7)
TVA shall fully implement and maintain in effect all provisions of the Commission approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The TVA approved CSP was discussed in NUREG-0847, Supplement 28, as amended by changes approved in License Amendment No. 7.
(8)
TVA shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Report for the facility, as described in NUREG-0847, Supplement 29, subject to the following provision:
'HILQLWLRQV
'HILQLWLRQVFRQWLQXHG
FRQWLQXHG
- DWWV%DU8QLW
$9(5$*(
',6,17(*5$7,21(1(5*<
VKDOOEHWKHDYHUDJHZHLJKWHGLQSURSRUWLRQWRWKH
FRQFHQWUDWLRQRIHDFKUDGLRQXFOLGHLQWKHUHDFWRUFRRODQWDW
WKHWLPHRIVDPSOLQJRIWKHVXPRIWKHDYHUDJHEHWDDQG
JDPPDHQHUJLHVSHUGLVLQWHJUDWLRQLQ0H9IRULVRWRSHV
RWKHUWKDQLRGLQHVZLWKKDOIOLYHV!PLQXWHVPDNLQJXSDW
OHDVWRIWKHWRWDOQRQLRGLQHDFWLYLW\\LQWKHFRRODQW
(1*,1((5('6$)(7<
)($785((6)5(63216(
7,0(
7KH(6)5(63216(7,0(VKDOOEHWKDWWLPHLQWHUYDOIURP
ZKHQWKHPRQLWRUHGSDUDPHWHUH[FHHGVLWV(6)DFWXDWLRQ
VHWSRLQWDWWKHFKDQQHOVHQVRUXQWLOWKH(6)HTXLSPHQWLV
FDSDEOHRISHUIRUPLQJLWVVDIHW\\IXQFWLRQLHWKHYDOYHV
WUDYHOWRWKHLUUHTXLUHGSRVLWLRQVSXPSGLVFKDUJHSUHVVXUHV
UHDFKWKHLUUHTXLUHGYDOXHVHWF7LPHVVKDOOLQFOXGHGLHVHO
JHQHUDWRUVWDUWLQJDQGVHTXHQFHORDGLQJGHOD\\VZKHUH
DSSOLFDEOH7KHUHVSRQVHWLPHPD\\EHPHDVXUHGE\\PHDQV
RIDQ\\VHULHVRIVHTXHQWLDORYHUODSSLQJRUWRWDOVWHSVVRWKDW
WKHHQWLUHUHVSRQVHWLPHLVPHDVXUHG,QOLHXRI
PHDVXUHPHQWUHVSRQVHWLPHPD\\EHYHULILHGIRUVHOHFWHG
FRPSRQHQWVSURYLGHGWKDWWKHFRPSRQHQWVDQGWKH
PHWKRGRORJ\\IRUYHULILFDWLRQKDYHEHHQSUHYLRXVO\\UHYLHZHG
DQGDSSURYHGE\\WKH15&RUWKHFRPSRQHQWVKDYHEHHQ
HYDOXDWHGLQDFFRUGDQFHZLWKDQ15&DSSURYHG
PHWKRGRORJ\\
/D
7KHPD[LPXPDOORZDEOHSULPDU\\FRQWDLQPHQWOHDNDJHUDWH
/DVKDOOEHRISULPDU\\FRQWDLQPHQWDLUZHLJKWSHUGD\\DW
WKHFDOFXODWHGSHDNFRQWDLQPHQWSUHVVXUH3D
$PHQGPHQW47
'HILQLWLRQV
'HILQLWLRQVFRQWLQXHG
FRQWLQXHG
- DWWV%DU8QLW
48$'5$1732:(57,/7
5$7,24375
5$7('7+(50$/32:(5
573
5($&72575,36<67(0
5765(63216(7,0(
4375VKDOOEHWKHUDWLRRIWKHPD[LPXPXSSHUH[FRUH
GHWHFWRUFDOLEUDWHGRXWSXWWRWKHDYHUDJHRIWKHXSSHUH[FRUH
GHWHFWRUFDOLEUDWHGRXWSXWVRUWKHUDWLRRIWKHPD[LPXPORZHU
H[FRUHGHWHFWRUFDOLEUDWHGRXWSXWWRWKHDYHUDJHRIWKHORZHU
H[FRUHGHWHFWRUFDOLEUDWHGRXWSXWVZKLFKHYHULVJUHDWHU
573VKDOOEHDWRWDOUHDFWRUFRUHKHDWWUDQVIHUUDWHWRWKH
UHDFWRUFRRODQWRI590:W
7KH5765(63216(7,0(VKDOOEHWKDWWLPHLQWHUYDOIURP
ZKHQWKHPRQLWRUHGSDUDPHWHUH[FHHGVLWV576WULSVHWSRLQW
DWWKHFKDQQHOVHQVRUXQWLOORVVRIVWDWLRQDU\\JULSSHUFRLO
YROWDJH7KHUHVSRQVHWLPHPD\\EHPHDVXUHGE\\PHDQVRI
DQ\\VHULHVRIVHTXHQWLDORYHUODSSLQJRUWRWDOVWHSVVRWKDW
WKHHQWLUHUHVSRQVHWLPHLVPHDVXUHG,QOLHXRI
PHDVXUHPHQWUHVSRQVHWLPHPD\\EHYHULILHGIRUVHOHFWHG
FRPSRQHQWVSURYLGHGWKDWWKHFRPSRQHQWVDQGWKH
PHWKRGRORJ\\IRUYHULILFDWLRQKDYHEHHQSUHYLRXVO\\UHYLHZHG
DQGDSSURYHGE\\WKH15&RUWKHFRPSRQHQWVKDYHEHHQ
HYDOXDWHGLQDFFRUGDQFHZLWKDQ15&DSSURYHG
PHWKRGRORJ\\
6+87'2:10$5*,16'0
6'0VKDOOEHWKHLQVWDQWDQHRXVDPRXQWRIUHDFWLYLW\\E\\ZKLFK
WKHUHDFWRULVVXEFULWLFDORUZRXOGEHVXEFULWLFDOIURPLWV
SUHVHQWFRQGLWLRQDVVXPLQJ
D
$OOURGFOXVWHUFRQWURODVVHPEOLHV5&&$VDUHIXOO\\
LQVHUWHGH[FHSWIRUWKHVLQJOH5&&$RIKLJKHVWUHDFWLYLW\\
ZRUWKZKLFKLVDVVXPHGWREHIXOO\\ZLWKGUDZQ:LWKDQ\\
5&&$QRWFDSDEOHRIEHLQJIXOO\\LQVHUWHGWKHUHDFWLYLW\\
ZRUWKRIWKH5&&$PXVWEHDFFRXQWHGIRULQWKH GHWHUPLQDWLRQRI6'0DQG E
,Q02'(6DQGWKHIXHODQGPRGHUDWRUWHPSHUDWXUHV DUHFKDQJHGWRWKHQRPLQDO]HURSRZHUGHVLJQOHYHO
6/$9(5(/$<7(67
$6/$9(5(/$<7(67VKDOOFRQVLVWRIHQHUJL]LQJHDFKVODYH
UHOD\\DQGYHULI\\LQJWKH23(5$%,/,7<RIHDFKVODYHUHOD\\
7KH6/$9(5(/$<7(67VKDOOLQFOXGHDVDPLQLPXPD
FRQWLQXLW\\FKHFNRIDVVRFLDWHGWHVWDEOHDFWXDWLRQGHYLFHV
$PHQGPHQW47
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION AMENDMENT NO. 352 TO RENEWED FACILITY OPERATING LICENSE DPR-77 AMENDMENT NO. 346 TO RENEWED FACILITY OPERATING LICENSE DPR-79 AMENDMENT NO. 141 TO FACILITY OPERATING LICENSE NPF-90 AMENDMENT NO. 47 TO FACILITY OPERATING LICENSE NPF-96 SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 TENNESSEE VALLEY AUTHORITY DOCKET NOS. 50-327, 50-328, 50-390, AND 50-391
1.0 INTRODUCTION
By application dated June 16, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20169A503, Tennessee Valley Authority (TVA, the licensee) submitted a license amendment request (LAR) for Sequoyah Nuclear Plant, Units 1 and 2 (Sequoyah) and Watts Bar Nuclear Plant, Units 1 and 2 (Watts Bar). The amendments would revise the technical specification (TS) definitions for engineered safety feature (ESF) response time and reactor trip system (RTS) response time for Sequoyah and Watts Bar that are referenced in surveillance requirements (SRs), hereafter, referred to as response time testing (RTT).
The proposed changes are based on Technical Specifications Task Force (TSTF) traveler TSTF-569, Revision 2, Revise Response Time Testing Definition, dated June 25, 2019 (ADAMS Accession No. ML19176A034). The U.S. Nuclear Regulatory Commission (NRC or the Commission) issued a final safety evaluation (SE) approving TSTF-569, Revision 2, on August 14, 2019 (ADAMS Accession No. ML19176A191). The description of the generic changes and their justification are contained in these two documents.
2.0 REGULATORY EVALUATION
2.1 Description of Response Time Testing The RTS for Sequoyah and Watts Bar initiate a unit shutdown, based on the values of selected unit parameters, to protect against violating the core fuel design limits and the reactor coolant system (RCS) pressure boundary during anticipated operational occurrences and to assist the engineered safety feature actuation system (ESFAS) in mitigating accidents. The ESFAS initiates necessary safety systems, based on the values of selected unit parameters, to protect against violating core design limits and the RCS pressure boundary and to mitigate accidents.
The RTT verifies that the individual channel or train actuation response times are less than or equal to the maximum values assumed in the accident analyses. The RTT acceptance criteria are under licensee control. Individual component response times are not modeled in the accident analyses. The analyses model the overall or total elapsed time, from the point at which the parameter exceeds the trip setpoint value at the sensor to the point at which the equipment reaches the required functional state (e.g., control and shutdown rods fully inserted in the reactor core).
2.2 Proposed Changes to the Technical Specifications Sequoyah and Watts Bar Limiting Condition for Operation (LCO) 3.3.2 requires the ESFAS instrumentation for each Function in TS Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, to be OPERABLE. To assure the LCO is met, Sequoyah SR 3.3.2.9 and Watts Bar SR 3.3.2.10 require the licensee to verify that ESFAS RESPONSE TIMES are within limits. Similarly, Sequoyah and Watts Bar LCOs 3.3.1 require the RTS instrumentation for each Function in TS Table 3.3.1-1, Reactor Trip System Instrumentation, to be OPERABLE, and Sequoyah SR 3.3.1.14 and Watts Bar SR 3.3.1.15 requires the licensee to verify that RTS RESPONSE TIMES are within limits. Section 1.1 of the TS define ESF RESPONSE TIME and RTS RESPONSE TIME, state acceptable means to measure each response time, and provide an alternative that may be used [i]n lieu of measurement.
In its application, the licensee stated that it requests adoption of NRC-approved TSTF-569. The only revision of TSTF-569 that is NRC approved is Revision 2. As described in Section 1, Summary Description, of Revision 2 of TSTF-569:
The proposed change revises the definitions to eliminate the requirement for prior NRC review and approval of the response time verification of similar components, while retaining the requirement for the verification to be performed using the methodology contained in Attachment 1, titled, Methodology to Eliminate Pressure Sensor and Protection Channel (for Westinghouse Plants only) Response Time Testing. The proposed change will permit licensees to verify the response time of similar component types using the methodology contained in Attachment 1, without obtaining prior NRC approval for each component.
Accordingly, as shown in the licensee's LAR, the proposed changes would add an additional in lieu of measurement, alternative to measuring ESF RESPONSE TIME and RTS RESPONSE TIME for Sequoyah and Watts Bar. The additional alternative for ESF RESPONSE TIME would be [i]n lieu of measurement, response time may be verified for selected components provided
... the components have been evaluated in accordance with an NRC approved methodology.
Similarly, for RTS RESPONSE TIME, [i]n lieu of measurement, response time may be verified for selected components provided that... the components have been evaluated in accordance with an NRC approved methodology and for RPS RESPONSE TIME [i]n lieu of measurement, response time may be verified for selected components provided that the components have been evaluated in accordance with an NRC approved methodology.
The application stated that the licensee concluded that the justifications presented in TSTF-569 and the safety evaluation prepared by the NRC staff are applicable to Sequoyah and Watts Bar and provide the justification for the amendment request. The application identified the requested variations (e.g., Sequoyah being committed to the 1971 version of IEEE Standard 338).
2.3 Applicable Regulatory Requirements and Guidance Under Title 10 of the Code of Federal Regulations (10 CFR) 50.90, Application for amendment of license, construction permit, or early site permit, whenever a holder of a license wishes to amend the license, including TSs in the license, an application for amendment must be filed, fully describing the changes desired. Under 10 CFR 50.92(a), determinations on whether to grant an applied-for license amendment are to be guided by the considerations that govern the issuance of initial licenses to the extent applicable and appropriate. Both the common standards for licenses in 10 CFR 50.40(a), and those specifically for issuance of operating licenses in 10 CFR 50.57(a)(3), provide that there must be reasonable assurance that the activities at issue will not endanger the health and safety of the public, and that the applicant will comply with the Commission's regulations.
The licensee's request involves adding an option used to satisfy surveillance requirements. As described in 10 CFR 50.36(c):
Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
3.0 TECHNICAL EVALUATION
The NRC staff reviewed the request by comparing the licensees proposal against the changes described in TSTF-569, Revision 2. In particular, the NRC staff assessed whether or how the variations identified by the licensee affect the applicability of NRC-approved TSTF-569. To make this assessment, the NRC staff compared Sequoyahs and Watts Bars design and existing TS with the design and TS presumed in TSTF-569. As explained below, the NRC staff concluded that the design and licenses (including TS) were sufficient to justify the licensee's reliance on the staff's safety evaluation of TSTF-569 as justification for adopting TSTF-569 in the Sequoyah and Watts Bar licenses.
TSTF-569 is designed to make changes to NUREG-1431, Revision 4.0, Standard Technical Specifications, Westinghouse Plants, April 2012, Volume 1, Specifications (ADAMS Accession No. ML12100A222), and Volume 2, Bases (ADAMS Accession No. ML12100A228).
The NRC staff compared the TSs assumed in TSTF-569 with the current TSs for Sequoyah and Watts Bar. The staff did not identify any material differences in the relevant technical specifications.
The TSTF-569 traveler is written for a plant design based on the General Design Criteria in Appendix A to 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities, that establish minimum requirements for the principal design criteria for water-cooled nuclear power plants similar in design and location to plants for which construction permits have been issued by the Commission. However, as stated in the Sequoyah Updated Final Safety Analysis Report, Section 3.1.2 (ADAMS Accession No. ML18017A448), Sequoyah was designed to meet the intent of the Proposed General Design Criteria for Nuclear Power Plant Construction Permits published in July 1967. Similarly, Watts Bar Updated Final Safety Analysis Report, Section 3.1.1 (ADAMS Accession No. ML19336A066) states that, Watts Bar Nuclear Power plant was designed to meet the intent of the Proposed General Design Criteria for Nuclear Power Plant Construction Permits published in July 1967. The NRC staff compared the design assumptions used in the evaluation of TSTF-569 with the designs of Sequoyah and Watts Bar.
The staff did not identify anything unique in the design of Sequoyah or Watts Bar that would preclude the licensee's reliance on the TSTF-569 SE.
The licensee is relying on the previous analyses of TSTF-569. For the reasons stated in the NRC staff's SE for TSTF-569, the staff found that the methodology contained in TSTF-569, Revision 2, Attachment 1, Methodology to Eliminate Pressure Sensor and Protection Channel (for Westinghouse Plants only) Response Time Testing, provides a consistent, clear, and concise framework for determining that replacement components will operate at level equivalent to that of the components being replaced. As such, using that methodology will assure that the necessary quality of the components is maintained and that the limiting conditions for operation will be met. Accordingly, approving the incorporation of that methodology into the licensing basis, and amending the TS to allow usage of the approved methodology, coupled with approving the aspect of the license amendment request to use the methodology in TSTF-569, Revision 2, Attachment 1, methodology, results in TSs that meet 10 CFR 50.36(c)(3) by assuring (1) that performing SRs 3.3.1.14 and 3.3.2.9 for Sequoyah and 3.3.1.15 and 3.3.2.10 for Watts Bar while using the new [i]n lieu of option, will assure that associated aspects of LCOs 3.3.1 and 3.3.2 will be met.
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Tennessee State official was notified of the proposed issuance of the amendments on December 14, 2020. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes surveillance requirements. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register on August 25, 2020 (85 FR 52374).
Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: T. Sweat, NRR Date: January 25, 2021
- by e-mail OFFICE NRR/DORL/LPLII-2/PM* NRR/DORL/LPLII-2/LA*
NRR/DSS/STSB/BC*
NAME MWentzel BAbeywickrama VCusumano DATE 12/16/2020 12/15/2020 12/11/2020 OFFICE NRR/DORL/LPLII-2/BC*
NRR/DORL/LPLII-2/PM*
NAME UShoop MWentzel DATE 01/22/2021 01/25/2021