Letter Sequence Other |
---|
|
|
MONTHYEARML0421003472004-08-19019 August 2004 General Electric Nuclear Test Reactor - Technical Specification Typographical Error Correction, Amendment No. 21 Project stage: Other 2004-08-19
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A1082024-02-0101 February 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML23345A1222023-12-21021 December 2023 Request for Additional Information Regarding the Direct Transfer of Control of Vallecitos Nuclear Center Licenses and Conforming License Amendments ML23338A1312023-12-0404 December 2023 GE-Hitachi Nuclear Energy Americas, LLC, Additional Information to Geha and GNF-A Application for Order Consenting to Indirect Transfer of Control (Reference 1) ML23334A2222023-11-30030 November 2023 GE Hitachi Nuclear Energy - NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed ML23283A3292023-11-30030 November 2023 NRC Issuance of Order Consenting to Indirect Transfer of Control of Ge/Geha/Gnfa Licenses ML23279A1322023-11-13013 November 2023 GE Hitachi Nuclear Energy - Vallecitos Nuclear Center, Getr Decommissioning Plan (License Number TR-1, Docket Number 50-70) ML23310A1132023-11-0909 November 2023 FRN-Notice of Consideration of Approval of Direct Transfer of Control of Vallecitos Nuclear Center Licenses Conforming License Amendments Opportunity for a Hearing Transmittal Letter ML23305A0522023-11-0101 November 2023 GE Hitachi Nuclear Energy Additional Supplemental Information - Revised Exhibit H ML23275A1742023-10-26026 October 2023 Acceptance Review of Application for Consent to Direct Transfer of Control of Vallecitos Nuclear Center Licenses and Conforming License Amendments ML23292A3362023-10-19019 October 2023 Northstar Vallecitos, LLC, Supplemental Information - Financial Qualifications ML23276B3952023-10-13013 October 2023 the U.S. Nuclear Regulatory Commission Staff Assessment of Ge/Geha/Gnfa Reponses to Acceptance Observations Application for the U.S. Nuclear Regulatory Commission Consent to Indirect Transfer of Licenses ML23269A1062023-09-26026 September 2023 GEH Description of Process for Decommissioning the Vallecitos Nuclear Center (Vnc) Shutdown Reactors - Getr Decommissioning Plan ML23261A5922023-09-15015 September 2023 GE-Hitachi Nuclear Energy Americas, LLC, License Termination Plan for the Vallecitos Boiling Water Reactor License DPR-1 ML23257A2492023-09-14014 September 2023 Cultural Resources Report ML23248A2322023-09-0505 September 2023 GE Hitachi Nuclear Energy - Supplemental Information - Proposed Conforming Amendments & License Conditions ML23244A2472023-09-0101 September 2023 GE-Hitachi Nuclear Energy Americas, LLC and Northstar Vallecitos, LLC, Application for Consent to Direct Transfers of Control of Licenses and Related Conforming License Amendments ML23229A5122023-08-17017 August 2023 GE-Hitachi Nuclear Energy Americas, LLC, Response to NRC Staff Observations Enclosed with NRC Acceptance Letter (Reference 2) Related to GE, Geha and GNF-A Application (Reference 1) ML23191A8592023-07-27027 July 2023 Acceptance Letter GE GNFA and Geha Application for NRC Consent to Indirect Transfer of Licenses ML23150A0962023-05-30030 May 2023 GE Hitachi Nuclear Energy, Nuclear Center (Vnc) Organization Change ML23152A1162023-05-30030 May 2023 Application for Order Consenting to Indirect Transfer of Control with Respect to Reactor Licenses, Materials Licenses, and Export Licenses, and Notification Regarding Other Approvals IR 05000018/20230012023-05-0505 May 2023 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2023001, 05000070/2023001, and 05000183/2023001 ML23123A0752023-04-12012 April 2023 Response to NRC Request for Inspection Documents ML23104A4172023-03-31031 March 2023 GNF-AGEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML23090A1802023-03-31031 March 2023 GEH - Financial Assurance Status Reports ML23083B3402023-03-24024 March 2023 GEH Annual Shutdown Reactor Reports for the Year 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23054A3332023-02-23023 February 2023 GEH Notification of GE Company Stock Beneficial Ownership Filing ML23018A2832023-01-19019 January 2023 GE-Hitachi Nuclear Energy Americas, LLC Response to NRC Inspection Report 050-00018/2022-002; 050-00070/2022-002; 050-00183/2022-002 and Notice of Violation ML22339A1742022-12-13013 December 2022 GE Hitachi Nuclear Energy NRC Inspection Report 05000018/2022002 05000070/2022002 and 05000183/2022002 IR 05000018/20220022022-12-13013 December 2022 GE Hitachi Nuclear Energy NRC Inspection Report 05000018/2022002 05000070/2022002 and 05000183/2022002 ML22335A5262022-12-0101 December 2022 (Vnc) Organization Change ML22326A3522022-11-22022 November 2022 Limited Post Shutdown Decommissioning Activities Report Update ML22300A2102022-10-27027 October 2022 GE-Hitachi Nuclear Energy Americas, LLC, Nuclear Center (Vnc) Submittal of Radiological Emergency Plan (REP) Revision 2 ML22265A0442022-09-26026 September 2022 GE Hitachi Vallecitos Nuclear Center, U.S. Nuclear Regulatory Commission'S Analysis of GE Hitachi'S Decommissioning Funding Status Reports for the Shutdown Power Reactors Vallecitos Boiling Water Reactor (License No. DPR-1, Docket No. 50-18 ML22264A3252022-09-21021 September 2022 Decommissioning Limited Post Shutdown Decommissioning Activities Report ML22249A3652022-09-0606 September 2022 GEH Notification of GE Company Stock Beneficial Ownership Filing ML22104A1852022-04-14014 April 2022 GE-Hitachi Nuclear Energy Americas, LLC, Vallecitos Nuclear Center (Vnc) Organization Change IR 05000018/20220012022-04-12012 April 2022 GE Hitachi Nuclear Energy - NRC Inspection Report 050 00018/2022-001, 050 00070/2022 001, and 050-00183/2022-001 ML22066A5692022-04-0808 April 2022 GEH Vallecitos Nuclear Center, NRCs Response to the GEH Description of Process for Decommissioning the Shutdown Reactors ML22089A0842022-03-30030 March 2022 GE Hitachi Nuclear Energy - Financial Assurance Status Reports ML22089A2232022-03-25025 March 2022 GEH Annual Shutdown Reactor Reports for the Year 2021 ML22084A5782022-03-23023 March 2022 GNF-A/GEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML22080A1322022-03-21021 March 2022 GE-Hitachi Nuclear Energy Americas, LLC, NRC Request for Inspection Documents 2024-02-01
[Table view] Category:Technical Specifications
MONTHYEARML0713700682007-05-16016 May 2007 License Transfer Technical Specifications Changes ML19008A0221970-04-15015 April 1970 General Electric Company possession-only AEC License for the Deactivated EVESR Facility (License Numbers DR-10, Docket Number: 50-183) 2007-05-16
[Table view] |
Text
August 19, 2004 Mr. David Turner, Manager Vallecitos and Morris Operations Vallecitos Nuclear Center General Electric Company 6705 Vallecitos Road Sunol, CA 94586
SUBJECT:
GENERAL ELECTRIC NUCLEAR TEST REACTOR - CORRECTION OF TECHNICAL SPECIFICATION TYPOGRAPHICAL ERROR (TAC NO. MC3775)
Dear Mr. Turner:
As discussed in your letter dated June 22, 2004, TS page 4-6 is incorrect in that paragraph 4.4.3.2 specifies "3.4.3.5" rather than "3.4.3.4." The typographical error was introduced in License Amendment No. 21 dated April 20, 2001. This typographical error was not specifically requested by you, the licensee but was inadvertently introduced in the Technical Specifications for Amendment No. 21. The error was neither addressed in a notice to the public, nor approved by the NRC. The NRC staff is issuing the attached correction to the typographical error on TS page 4-6, as requested in your letter. Please replace TS Page 4-6 with the enclosed page.
The revised page is identified by issuance date and contains a vertical line indicating the area of typographical correction. This letter is in accordance with the NRC policy as specified in "The Non-Power Reactor Project Managers Handbook," dated September 30, 1998, and "Proposed Guidance for Correction of Technical Specification Typographical Errors," SECY 238 dated November 19, 1996.
If you have any questions regarding this letter, please contact Kevin Witt at 301-415-4075, or by Internet e-mail at kmw@nrc.gov.
Sincerely,
/RA/
Marvin M. Mendonca, Senior Project Manager Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-73
Enclosure:
TS Page 4-6 cc w/enclosure: Please see next page
General Electric Company (NTR) Docket No. 50-73 cc:
Mr. Steve Hsu Radiologic Health Branch State Department of Health Service P.O. Box 942732 Sacramento, CA 94234-7320 California Department of Health ATTN: Chief, Environmental Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, CA 95814 Mr. Chuck Bassett, Manager Regulatory Compliance Vallecitos and Morris Operations Vallecitos Nuclear Center General Electric Company 6705 Vallecitos Road Sunol, CA 94586 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611 Mr. Chris Hamilton Senior Licensing Engineer Certified Six Sigma Green Belt Vallecitos Nuclear Center Sunol, CA 94586 Mr. Harold Neems General Electric Company Nuclear Energy Business Operations 175 Cutner Avenue Mail Code 123 San Jose, CA 95125
August 19, 2004 Mr. David Turner, Manager Vallecitos and Morris Operations Vallecitos Nuclear Center General Electric Company 6705 Vallecitos Road Sunol, CA 94586
SUBJECT:
GENERAL ELECTRIC NUCLEAR TEST REACTOR - TECHNICAL SPECIFICATION TYPOGRAPHICAL ERROR, AMENDMENT NO. 21 (TAC NO. MC3775)
Dear Mr. Turner:
As discussed in your letter dated June 22, 2004, TS page 4-6 is incorrect in that paragraph 4.4.3.2 specifies "3.4.3.5" rather than "3.4.3.4." The typographical error was introduced in License Amendment No. 21 dated April 20, 2001. This typographical error was not specifically requested by you, the licensee but was inadvertently introduced in the Technical Specifications for Amendment No. 21. The error was neither addressed in a notice to the public, nor approved by the NRC. The NRC staff is issuing the attached correction to the typographical error on TS page 4-6, as requested in your letter. Please replace TS Page 4-6 with the enclosed page.
The revised page is identified by issuance date and contains a vertical line indicating the area of typographical correction. This letter is in accordance with the NRC policy as specified in "The Non-Power Reactor Project Managers Handbook," dated September 30, 1998, and "Proposed Guidance for Correction of Technical Specification Typographical Errors," SECY 238 dated November 19, 1996.
If you have any questions regarding this letter, please contact Kevin Witt at 301-415-4075, or by Internet e-mail at kmw@nrc.gov.
Sincerely,
/RA/
Marvin M. Mendonca, Senior Project Manager Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-73
Enclosure:
TS Page 4-6 cc w/enclosure: Please see next page DISTRIBUTION:
PUBLIC RNRP/R&TR r/f TDragoun AAdams JLyons OGC EHylton RidsNrrDrip SHolmes CBassett PYoung MMendonca WEresian PIsaac GHill (2) PDoyle PMadden DHughes KWitt ACCESSION #: ML042100347 TEMPLATE #: NRR-106 OFFICE RTRS RTRS:PM RTRS:LA OGC RTRS:C NAME KWitt:vmj* MMendonca EHylton* MBupp* PMadden DATE 7/ 28 /2004 8/ 5 /2004 8/ 11 /2004 8/ 16 /2004 8/ 18 /2004 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY
NEDO-32765 4.3 REACTOR COOLANT SYSTEM Specifications regarding surveillance requirements of the reactor coolant system are included in the reactor safety system, Specification 4.2, Tables 4-1 and 4-2.
4.4 REACTOR CELL AND VENTILATION SYSTEM 4.4.1 Applicability This specification applies to the surveillance requirements for the reactor cell and ventilation system.
4.4.2 Objective The objective of this specification is to ensure that the reactor ventilation system is in satisfactory condition to provide adequate confinement and to control the release of radioactivity to the environment.
4.4.3 Specification 4.4.3.1 The reactor cell negative pressure, with respect to the control room, shall be verified prior to the first reactor startup of each day.
4.4.3.2 Surveillance requirements of the instrumentation and equipment required to comply with Specifications 3.4.3.2, 3.4.3.3 and 3.4.3.4 shall be as listed in Specification 4.2, Table 4-2. l 4.4.4 Bases Operation in accordance with Specification 4.4.3.l ensures that contaminated reactor cell air is exhausted through the ventilation system. This minimizes the possibility of airborne contamination release to surrounding areas.
4-6 Rev. August XX, 2004 l