ML042380452

From kanterella
Revision as of 17:59, 16 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Response to a Request for Additional Information Proposed Perry - Nuclear Power Plant Physical Security Plan Section 9.4.1, Appendix C, 'Safeguards Contingency Plan, and Updates to Previous Rai'S
ML042380452
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/17/2004
From: Myers L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
PY-CEI/NRR-2822L, TAC MC2955
Download: ML042380452 (1)


Text

FENOC SAFEGUARDS INFORMATION Perry Nuclear Power Road 10 Center Plant PO. Box 97 FrstEnergy Nuclear Operating Company Perry Ohio 44081 August 17, 2004 PY-CEI/NRR-2822L U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Perry Nuclear Power Plant Docket No: 50-440

Subject:

Response to a Request for Additional Information re: Proposed Perry Nuclear Power Plant Physical Security Plan Section 9.4.1, Appendix C, 'Safeguards Contingency Plan", and Updates to Previous RAI's (TAC NO. MC2955)

Responses to issues contained in a Request for Additional Information (RAI) from the Nuclear Regulatory Commission (NRC) staff are provided in safeguarded Attachments 1 and 2 to this letter. The RAI addresses the proposed Perry Nuclear Power Plant (PNPP) Physical Security Plan Section 9.4.1 and Appendix C, 'Safeguards Contingency Plan", which were submitted to the NRC in a letter dated April 28, 2004 (PY-CEI/NRR-2797L). The RAI was provided to the PNPP staff in a letter dated July 23, 2004. Also provided, in Attachment 3, are updates to previous RAI responses which were provided in letters dated July 1, 2004 (PY-CEI/NRR-2814L),

and July 14, 2004 (PY-CEI/NRR-2818L).

In accordance with 10CFR73.21, the attachments to this letter have been determined to contain Safeguards Information, and are thereby exempt from public disclosure.

There are no regulatory commitments contained in this letter or its attachments. If there are any questions concerning this matter, please contact Mr. Ronald V. Rose, Manager - Site Protection, at 440-280-5314.

I declare under penalty of perjury that the foregoing is true and correct. Executed on August 17, 2004.

The attachments to this letter contains "Safeguards for Lew W. Myers Information" and must be protected accordingly.

Attachments Upon separation of the attachments, this page is cc: NRC Region III (with Attachments) decontrolled.

NRC Resident Inspector (w/o Attachments)

NRC Project Manager (w/o Attachments)

SAFEGUARDS INFORMATION i0