MONTHYEARML0419701812004-06-28028 June 2004 RAI Security Plan Sections 1 - 9 Project stage: RAI ML0419800192004-07-0909 July 2004 Request for Additional Information Training and Qualification Plan Project stage: RAI ML0421904392004-07-23023 July 2004 RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan Project stage: RAI ML0421604132004-07-26026 July 2004 Response to a Request for Additional Information Physical Security Plan Appendix B, Training and Qualification Plan Project stage: Response to RAI ML0423804522004-08-17017 August 2004 Response to a Request for Additional Information Proposed Perry - Nuclear Power Plant Physical Security Plan Section 9.4.1, Appendix C, 'Safeguards Contingency Plan, and Updates to Previous Rai'S Project stage: Response to RAI ML0425302212004-08-31031 August 2004 Updated Responses to Requests for Additional Information (Rais) on the Proposed Perry Nuclear Power Plant Physical Security Plan Project stage: Response to RAI ML0426002492004-09-0909 September 2004 Revision to Proposed Plant Physical Security Plan Submitted April 28, 2004 Project stage: Other ML0428803772004-09-30030 September 2004 Response to Requests for Additional Information on the Proposed Perry Nuclear Power Plant Physical Security Plan Project stage: Response to RAI ML0430102632004-10-13013 October 2004 Revised Draft of the Proposed Perry Nuclear Power Plant Physical Security Plan Project stage: Draft Other ML0431706582004-10-28028 October 2004 Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat and Revisions to Physical Security Plan, Training and Qualification Plan. Project stage: Other ML0432104752004-11-0808 November 2004 Confirmation of Implementation of April 29, 2003 Orders to the Perry Nuclear Power Plant Project stage: Other ML0435602882004-12-10010 December 2004 Comments on the Safety Evaluation for the Perry Nuclear Power Plant Physical Security Plan Project stage: Other 2004-07-23
[Table View] |
Similar Documents at Perry |
---|
Category:Letter
MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-08-0505 August 2022 Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-099, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis2022-06-0101 June 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis ML21106A0202021-04-0707 April 2021 Enclosure a - Evaluation of Proposed Change L-20-240, License Amendment Request to Adopt TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control2021-03-0505 March 2021 License Amendment Request to Adopt TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control L-20-129, Emergency Plan Amendment Request2020-12-28028 December 2020 Emergency Plan Amendment Request L-20-166, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-24024 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements L-20-188, ISFSI, Davis-Besse Unit 1, and ISFSI, Perry, Unit 1, and ISFSI, Decommissioning Trust: Amendments to Decommissioning Trust Agreements to Update Company Names2020-06-26026 June 2020 ISFSI, Davis-Besse Unit 1, and ISFSI, Perry, Unit 1, and ISFSI, Decommissioning Trust: Amendments to Decommissioning Trust Agreements to Update Company Names L-19-274, License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-3602020-04-24024 April 2020 License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-360 L-19-265, License Amendment Request to Extend Refueling Special Lifting Devices' Interval for Testing to Verify Continuing Compliance2019-12-18018 December 2019 License Amendment Request to Extend Refueling Special Lifting Devices' Interval for Testing to Verify Continuing Compliance L-19-213, Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR2019-12-18018 December 2019 Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR L-19-219, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2019-09-25025 September 2019 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-19-200, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI - Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2019-08-29029 August 2019 ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI - Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-19-073, ISFSI, Davis-Besse, Unit 1, ISFSI, and Perry, Unit 1, ISFSI - Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2019-04-26026 April 2019 ISFSI, Davis-Besse, Unit 1, ISFSI, and Perry, Unit 1, ISFSI - Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-18-046, License Amendment Request to Extend Containment Leakage Test Frequency2018-03-0707 March 2018 License Amendment Request to Extend Containment Leakage Test Frequency L-17-350, Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement2018-02-14014 February 2018 Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement L-17-045, Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control.2017-12-0606 December 2017 Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control. L-17-089, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips2017-06-20020 June 2017 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips L-17-042, Request for Licensing Action to Revise the Technical Specifications2017-06-0808 June 2017 Request for Licensing Action to Revise the Technical Specifications L-17-043, Request for Licensing Action to Revise the Environmental Protection Plan2017-04-26026 April 2017 Request for Licensing Action to Revise the Environmental Protection Plan L-17-052, Supplemental Request Associated with the License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 32017-02-0606 February 2017 Supplemental Request Associated with the License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 L-16-179, License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1. Reactor Core Safety Limits.2016-11-0101 November 2016 License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1. Reactor Core Safety Limits. L-16-236, License Amendment Request for Adoption of Technical Specifications Task Force (Tstr Traveler TSTF-501. Revision 1. Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2016-10-27027 October 2016 License Amendment Request for Adoption of Technical Specifications Task Force (Tstr Traveler TSTF-501. Revision 1. Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control L-16-304, Supplement to Request for License Amendment Approval Delay2016-10-25025 October 2016 Supplement to Request for License Amendment Approval Delay L-16-083, License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 32016-03-15015 March 2016 License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 L-15-195, Application for Order Consenting to Transfer of Licenses and Approving Conforming License Amendments2015-06-30030 June 2015 Application for Order Consenting to Transfer of Licenses and Approving Conforming License Amendments L-14-271, Request for Licensing Action to Amend Technical Specification 3.8.4, DC Sources - Operating2014-11-24024 November 2014 Request for Licensing Action to Amend Technical Specification 3.8.4, DC Sources - Operating L-13-306, Request for Licensing Action Pursuant to 10 CFR 50.59. 50.67. and 50.90: Full Implementation of Alternative Accident Source Term Design Basis Accident Analyses. and an Associated Technical Specification Change2013-12-0606 December 2013 Request for Licensing Action Pursuant to 10 CFR 50.59. 50.67. and 50.90: Full Implementation of Alternative Accident Source Term Design Basis Accident Analyses. and an Associated Technical Specification Change ML13281A5362013-10-15015 October 2013 Meeting Slide for FENOC Presubmittal Guidance Checklist Part I L-12-397, Request to Amend the Price-Anderson Indemnities and Notification of a Name Change to Documents of Regulatory Interest2013-02-19019 February 2013 Request to Amend the Price-Anderson Indemnities and Notification of a Name Change to Documents of Regulatory Interest ML12249A3592012-09-0505 September 2012 License Amendment Request for Adoption of TSTF-275-A, Rev. 0, Clarify Requirement for EDG Start Signal on Rpv... & TSTF-300-A L-12-064, Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process2012-02-22022 February 2012 Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process L-11-331, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.2011-10-11011 October 2011 License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. L-11-322, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.2011-10-0303 October 2011 License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. ML1126402462011-09-20020 September 2011 License Amendment Request to Change the Name of an Owner Licensee to Firstenergy Nuclear Generation, LLC L-11-038, License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation2011-04-12012 April 2011 License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation L-10-200, License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 12010-12-15015 December 2010 License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 1 ML1029804462010-10-21021 October 2010 License Amendment Request to Modify Technical Specification 2.1.1, Reactor Core Sls, to Incorporate Revised Safety Limit Minimum Critical Power Ratio Values L-09-074, License Amendment Request to Provide Consistency in Division 3 Emergency Diesel Generator Start Time Technical Specification Surveillance Requirements2009-06-30030 June 2009 License Amendment Request to Provide Consistency in Division 3 Emergency Diesel Generator Start Time Technical Specification Surveillance Requirements L-09-025, ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-03-25025 March 2009 ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. L-09-031, Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control2009-03-11011 March 2009 Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control ML0906306722009-03-0909 March 2009 Enclosure 14: Case Study 10: Perry Inability to Follow the RHR-SDC Required - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf L-08-325, License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 4972008-11-18018 November 2008 License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 497 L-08-046, Request to Adopt TSTF-476-A, Improved BPWS Control Rod Insertion Process (NEDO-33091), Per the Consolidated Line Item Improvement Process2008-02-20020 February 2008 Request to Adopt TSTF-476-A, Improved BPWS Control Rod Insertion Process (NEDO-33091), Per the Consolidated Line Item Improvement Process 2024-01-24
[Table view] |
Text
SAFEGUARDS INFORMATION October 28, 2004 Mr. William R. Kanda Vice President - Nuclear c/o Mr. Thomas Mahon FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant, Unit 1 10 Center Road Perry, OH 44081
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT 1 - ADMINISTRATIVE CHANGE TO FACILITY OPERATING LICENSE IN CONJUNCTION WITH THE COMMISSION ORDER EA-03-086 REGARDING REVISED DESIGN BASIS THREAT (DBT); AND REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MC2955)
Dear Mr. Kanda:
By letter dated April 28, 2004, FirstEnergy Nuclear Operating Company submitted a supplemental response in accordance with Order EA-03-086, the Order requiring compliance with the revised design basis threat, dated April 29, 2003, (DBT Order) for the Perry Nuclear Power Plant, Unit 1.Section III.A of the DBT Order required licensees to revise physical security plans (PSPs), training and qualification plans (T&Q Plans), and safeguards contingency plans (SCPs) in order to provide protection against the revised DBT set forth in to the DBT Order. These revised plans, along with an implementation schedule, were required to be submitted to the Nuclear Regulatory Commission (NRC or the Commission) for review and approval no later than April 29, 2004.
August 31, 2004, September 9, 2004, September 30, 2004, and October 13, 2004, has focused on ensuring the necessary programmatic elements are contained in these plans in order to provide high assurance that activities involving special nuclear material are not inimical to the common defense and security and do not constitute an unreasonable risk to the public health and safety.
NOTICE: Enclosure 2 contains Safeguards Information. Upon separation from Enclosure 2, this letter and Enclosure 1 are DECONTROLLED.
SAFEGUARDS INFORMATION
W. R. Kanda The NRC staff has determined that these plans contain the necessary programmatic elements that, when effectively implemented, will provide the required high assurance that Perry Nuclear Power Plant, Unit 1 will be protected against the revised DBT. The NRC staff, therefore approves the for Perry Nuclear Power Plant, Unit 1. However, ultimately the effectiveness of these plans will be judged on your ability to meet regulatory requirements through facility implementing procedures and site practices. As such your facility implementing procedures and practices will continue to be subject to future NRC review and inspection, including NRC conducted force-on-force exercises.
In addition, the NRC staff noted that your PSP included alternatives to certain requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 73.55. In each case, the NRC staff found that the alternative provides an equivalent level of protection to that of the associated requirement and meets the high assurance objective of 10 CFR 73.55(a). The NRC staff, therefore, approves the alternatives shown in the table below. The NRC staffs evaluation is discussed further in the enclosed Safety Evaluation (SE).
Approved Alternatives to the Requirements of 10 CFR Part 73 SE Section PSP Alternative to Description Section 10 CFR 3.6.2 6.2 73.55(c)(3) Isolation Zones 3.9.4.3 9.4.3 73.55(d)(4) Protected Area (PA) vehicle search requirements 3.9.4.4 9.4.4 73.55(d)(1) PA personnel search requirements 3.9.5.2 9.5 73.55(d)(1) PA access control requirements 73.55(d)(4) 3.10.1 10.1 73.55(c)(5) PA illumination requirements 3.13.1 14.1 73.55(c)(1) Temporary reclassification of Vital 73.55(d)(7)(i)(B) Areas to PA status (devitalization)
Finally, consistent with the DBT Order, conforming administrative changes to Facility Operating Licenses (FOLs) are required to ensure implementation of the DBT Order requirements.
Therefore, an administrative, license change to FOL No. NPF-58 is being made to incorporate the reference to the revised required by the DBT Order. This change complies with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Commission's rules and regulations set forth in 10 CFR Chapter I.
Please replace the enclosed page to your FOL as indicated in the Enclosure 1.
A copy of our SE with regard to your security plans (designated as Safeguards Information) is provided in Enclosure 2.
Sincerely,
/RA/
John A. Nakoski, Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosures:
- 1. Administrative Change to FOL No. NPF-58
- 2. Safety Evaluation Regarding the Security Plans (SAFEGUARDS INFORMATION) cc w/encl 1only: See next page cc w/encls 1 and 2: Mr. Thomas Mahon
Please replace the enclosed page to your FOL as indicated in the Enclosure 1.
A copy of our SE with regard to your security plans (designated as Safeguards Information) is provided in Enclosure 2.
Sincerely,
/RA/
John A. Nakoski, Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosures:
- 1. Administrative Change to FOL No. NPF-58
- 2. Safety Evaluation Regarding the Security Plans (SAFEGUARDS INFORMATION) cc w/encl 1only: See next page cc w/encls 1 and 2: Mr. Thomas Mahon DISTRIBUTION:
PUBLIC SPRT R/F OGC ACRS PCoates SSands AMendiola WRuland GHill (2) DLPM DPR TBoyceS Reynolds, RIII Accession No.: ML043170658 OFFICE SPRT/TL SPRT/PM SPRT/LA SPRT/PL OGC NSIR/SC NRR/SC NAME CRaynor JPeralta JHeck SMorris JNakoski DATE 10/24/04 10/24/04 10/24/04 10/24/04 10-27-04 10/28/04 10/28/04 OFFICIAL RECORD COPY
Perry Nuclear Power Plant, Unit 1 cc w/o encl.:
Mary E. O'Reilly Carol OClaire, Chief, Radiological Branch FirstEnergy Corporation Ohio Emergency Management Agency 76 South Main St. 2855 West Dublin Granville Road Akron, OH 44308 Columbus, OH 43235-7150 Resident Inspector's Office Mayor, Village of Perry U.S. Nuclear Regulatory Commission P.O. Box 100 P.O. Box 331 Perry, OH 44081-0100 Perry, OH 44081-0331 Dennis Clum Regional Administrator, Region III Radiological Assistance Section Supervisor U.S. Nuclear Regulatory Commission Bureau of Radiation Protection 801 Warrenville Road Ohio Department of Health Lisle, IL 60532-4531 P.O. Box 118 Columbus, OH 43266-0118 Sue Hiatt OCRE Interim Representative Zack A. Clayton 8275 Munson DERR Mentor, OH 44060 Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton Mr. Vernon K. Higaki P.O. Box 1049 Manager - Regulatory Affairs Columbus, OH 43266-0149 FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Chairman P.O. Box 97, A210 Perry Township Board of Trustees 10 Center Road 3750 Center Road, Box 65 Perry, OH 44081 Perry, OH 44081 Frederick van Ahn, Plant Manager Daniel Z. Fisher FirstEnergy Nuclear Operating Company Transportation Department Perry Nuclear Power Plant Public Utilities Commission P.O. Box 97, SB306 180 East Broad Street Perry, OH 44081 Columbus, OH 43215-3793 Mayor, Village of North Perry Joseph J. Hagan North Perry Village Hall Senior Vice President, Engineering and 4778 Lockwood Road Services North Perry Village, OH 44081 First Energy Nuclear Operating Company 76 South Main Street Donna Owens, Director Akron, Ohio 44308 Ohio Department of Commerce Division of Industrial Compliance Mr. Lew W. Myers Bureau of Operations & Maintenance Chief Operating Officer 6606 Tussing Road FirstEnergy Nuclear Operating Company P. O. Box 4009 Perry Nuclear Power Plant Reynoldsburg, OH 43068-9009 P. O. Box 97, A290 10 Center Road Perry, OH 44081
FIRSTENERGY NUCLEAR OPERATING COMPANY.
DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT, UNIT 1 ADMINISTRATIVE LICENSE CHANGE TO FACILITY OPERATING LICENSE License No. NPF-58
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. Consistent with Order EA-03-086, the Order requiring compliance with the revised design basis threat, (DBT Order) issued on April 29, 2003, conforming administrative changes to Facility Operating Licenses (FOLs) are required to ensure implementation of the DBT Order requirements. Therefore, an administrative license change to FOL No. NPF-58 is being made to incorporate the reference to the revised Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan required by the DBT Order. These changes comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this administrative license change can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this administrative license change will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this administrative license change is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the FOL is changed, as indicated in the Attachment.
- 3. This administrative license change is effective as of its date of issuance and shall be implemented on or before October 29, 2004.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
John A. Nakoski, Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the FOL No. NPF-58 Date of Issuance: October 28, 2004
CHANGES TO FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 Replace the following page of the Facility Operating License No. NPF-58 with the attached revised page as indicated. The revised page is identified by a revision date and contains marginal lines indicating the area of change.
Remove Page Insert Page 6 6
D. FENOC is exempted from: 1) the requirements of Section III.D.2(b)(ii), containment airlock testing requirements, Appendix J to 10 CFR Part 50, due to the special circumstance described in Section 6.2.6 of SER Supplement No. 7 authorized by 10 CFR 50.12(a)(2)(iii) and 2) the requirements of Section IV.F., Full Participation Exercise, of Appendix E to 10 CFR Part 50, due to the special circumstance described in the Exemption dated November 6, 1986. These exemptions are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. The exemptions are hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E. FENOC shall fully implement and maintain in effect all provisions of the l Commission-approved physical security, training and qualification, and safeguards l contingency plans, including amendments made pursuant to provisions of the l Miscellaneous Amendments and Search Requirements revisions to I0 CFR 73.55 l (61 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). l The combined set of plans, which contain Safeguards Information protected under l 10 CFR 73.21, is entitled: "Perry Nuclear Power Plant Physical Security Plan" submitted l by letter dated September 9, 2004, and supplemented on September 30, 2004. l F. Except for Section 2.C.(2), FENOC shall report any violations of the requirements contained in Section 2.C of this license in the following manner: Initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup in accordance with the procedures described in 10 CFR 50.73(a)(1), (b), (c), and (e).
G. The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1964, as amended, to cover public liability claims.
Amendment No. 129 Revised by letter dated October 28, 2004