Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat and Revisions to Physical Security Plan, Training and Qualification Plan.
ML043170658
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/28/2004
From: John Nakoski
NRC/NRR/DLPM/LPD2
To: Kanda W
FirstEnergy Nuclear Operating Co
Nakoski J A, NRR/DLPM, 415-1068
References
TAC MC2955
Download: ML043170658 (9)


Text

SAFEGUARDS INFORMATION October 28, 2004 Mr. William R. Kanda Vice President - Nuclear c/o Mr. Thomas Mahon FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant, Unit 1 10 Center Road Perry, OH 44081

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT 1 - ADMINISTRATIVE CHANGE TO FACILITY OPERATING LICENSE IN CONJUNCTION WITH THE COMMISSION ORDER EA-03-086 REGARDING REVISED DESIGN BASIS THREAT (DBT); AND REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MC2955)

Dear Mr. Kanda:

By letter dated April 28, 2004, FirstEnergy Nuclear Operating Company submitted a supplemental response in accordance with Order EA-03-086, the Order requiring compliance with the revised design basis threat, dated April 29, 2003, (DBT Order) for the Perry Nuclear Power Plant, Unit 1.Section III.A of the DBT Order required licensees to revise physical security plans (PSPs), training and qualification plans (T&Q Plans), and safeguards contingency plans (SCPs) in order to provide protection against the revised DBT set forth in to the DBT Order. These revised plans, along with an implementation schedule, were required to be submitted to the Nuclear Regulatory Commission (NRC or the Commission) for review and approval no later than April 29, 2004.

August 31, 2004, September 9, 2004, September 30, 2004, and October 13, 2004, has focused on ensuring the necessary programmatic elements are contained in these plans in order to provide high assurance that activities involving special nuclear material are not inimical to the common defense and security and do not constitute an unreasonable risk to the public health and safety.

NOTICE: Enclosure 2 contains Safeguards Information. Upon separation from Enclosure 2, this letter and Enclosure 1 are DECONTROLLED.

SAFEGUARDS INFORMATION

W. R. Kanda The NRC staff has determined that these plans contain the necessary programmatic elements that, when effectively implemented, will provide the required high assurance that Perry Nuclear Power Plant, Unit 1 will be protected against the revised DBT. The NRC staff, therefore approves the for Perry Nuclear Power Plant, Unit 1. However, ultimately the effectiveness of these plans will be judged on your ability to meet regulatory requirements through facility implementing procedures and site practices. As such your facility implementing procedures and practices will continue to be subject to future NRC review and inspection, including NRC conducted force-on-force exercises.

In addition, the NRC staff noted that your PSP included alternatives to certain requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 73.55. In each case, the NRC staff found that the alternative provides an equivalent level of protection to that of the associated requirement and meets the high assurance objective of 10 CFR 73.55(a). The NRC staff, therefore, approves the alternatives shown in the table below. The NRC staffs evaluation is discussed further in the enclosed Safety Evaluation (SE).

Approved Alternatives to the Requirements of 10 CFR Part 73 SE Section PSP Alternative to Description Section 10 CFR 3.6.2 6.2 73.55(c)(3) Isolation Zones 3.9.4.3 9.4.3 73.55(d)(4) Protected Area (PA) vehicle search requirements 3.9.4.4 9.4.4 73.55(d)(1) PA personnel search requirements 3.9.5.2 9.5 73.55(d)(1) PA access control requirements 73.55(d)(4) 3.10.1 10.1 73.55(c)(5) PA illumination requirements 3.13.1 14.1 73.55(c)(1) Temporary reclassification of Vital 73.55(d)(7)(i)(B) Areas to PA status (devitalization)

Finally, consistent with the DBT Order, conforming administrative changes to Facility Operating Licenses (FOLs) are required to ensure implementation of the DBT Order requirements.

Therefore, an administrative, license change to FOL No. NPF-58 is being made to incorporate the reference to the revised required by the DBT Order. This change complies with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Commission's rules and regulations set forth in 10 CFR Chapter I.

Please replace the enclosed page to your FOL as indicated in the Enclosure 1.

A copy of our SE with regard to your security plans (designated as Safeguards Information) is provided in Enclosure 2.

Sincerely,

/RA/

John A. Nakoski, Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosures:

1. Administrative Change to FOL No. NPF-58
2. Safety Evaluation Regarding the Security Plans (SAFEGUARDS INFORMATION) cc w/encl 1only: See next page cc w/encls 1 and 2: Mr. Thomas Mahon

Please replace the enclosed page to your FOL as indicated in the Enclosure 1.

A copy of our SE with regard to your security plans (designated as Safeguards Information) is provided in Enclosure 2.

Sincerely,

/RA/

John A. Nakoski, Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosures:

1. Administrative Change to FOL No. NPF-58
2. Safety Evaluation Regarding the Security Plans (SAFEGUARDS INFORMATION) cc w/encl 1only: See next page cc w/encls 1 and 2: Mr. Thomas Mahon DISTRIBUTION:

PUBLIC SPRT R/F OGC ACRS PCoates SSands AMendiola WRuland GHill (2) DLPM DPR TBoyceS Reynolds, RIII Accession No.: ML043170658 OFFICE SPRT/TL SPRT/PM SPRT/LA SPRT/PL OGC NSIR/SC NRR/SC NAME CRaynor JPeralta JHeck SMorris JNakoski DATE 10/24/04 10/24/04 10/24/04 10/24/04 10-27-04 10/28/04 10/28/04 OFFICIAL RECORD COPY

Perry Nuclear Power Plant, Unit 1 cc w/o encl.:

Mary E. O'Reilly Carol OClaire, Chief, Radiological Branch FirstEnergy Corporation Ohio Emergency Management Agency 76 South Main St. 2855 West Dublin Granville Road Akron, OH 44308 Columbus, OH 43235-7150 Resident Inspector's Office Mayor, Village of Perry U.S. Nuclear Regulatory Commission P.O. Box 100 P.O. Box 331 Perry, OH 44081-0100 Perry, OH 44081-0331 Dennis Clum Regional Administrator, Region III Radiological Assistance Section Supervisor U.S. Nuclear Regulatory Commission Bureau of Radiation Protection 801 Warrenville Road Ohio Department of Health Lisle, IL 60532-4531 P.O. Box 118 Columbus, OH 43266-0118 Sue Hiatt OCRE Interim Representative Zack A. Clayton 8275 Munson DERR Mentor, OH 44060 Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton Mr. Vernon K. Higaki P.O. Box 1049 Manager - Regulatory Affairs Columbus, OH 43266-0149 FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Chairman P.O. Box 97, A210 Perry Township Board of Trustees 10 Center Road 3750 Center Road, Box 65 Perry, OH 44081 Perry, OH 44081 Frederick van Ahn, Plant Manager Daniel Z. Fisher FirstEnergy Nuclear Operating Company Transportation Department Perry Nuclear Power Plant Public Utilities Commission P.O. Box 97, SB306 180 East Broad Street Perry, OH 44081 Columbus, OH 43215-3793 Mayor, Village of North Perry Joseph J. Hagan North Perry Village Hall Senior Vice President, Engineering and 4778 Lockwood Road Services North Perry Village, OH 44081 First Energy Nuclear Operating Company 76 South Main Street Donna Owens, Director Akron, Ohio 44308 Ohio Department of Commerce Division of Industrial Compliance Mr. Lew W. Myers Bureau of Operations & Maintenance Chief Operating Officer 6606 Tussing Road FirstEnergy Nuclear Operating Company P. O. Box 4009 Perry Nuclear Power Plant Reynoldsburg, OH 43068-9009 P. O. Box 97, A290 10 Center Road Perry, OH 44081

FIRSTENERGY NUCLEAR OPERATING COMPANY.

DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT, UNIT 1 ADMINISTRATIVE LICENSE CHANGE TO FACILITY OPERATING LICENSE License No. NPF-58

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. Consistent with Order EA-03-086, the Order requiring compliance with the revised design basis threat, (DBT Order) issued on April 29, 2003, conforming administrative changes to Facility Operating Licenses (FOLs) are required to ensure implementation of the DBT Order requirements. Therefore, an administrative license change to FOL No. NPF-58 is being made to incorporate the reference to the revised Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan required by the DBT Order. These changes comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this administrative license change can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this administrative license change will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this administrative license change is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the FOL is changed, as indicated in the Attachment.
3. This administrative license change is effective as of its date of issuance and shall be implemented on or before October 29, 2004.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

John A. Nakoski, Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the FOL No. NPF-58 Date of Issuance: October 28, 2004

CHANGES TO FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 Replace the following page of the Facility Operating License No. NPF-58 with the attached revised page as indicated. The revised page is identified by a revision date and contains marginal lines indicating the area of change.

Remove Page Insert Page 6 6

D. FENOC is exempted from: 1) the requirements of Section III.D.2(b)(ii), containment airlock testing requirements, Appendix J to 10 CFR Part 50, due to the special circumstance described in Section 6.2.6 of SER Supplement No. 7 authorized by 10 CFR 50.12(a)(2)(iii) and 2) the requirements of Section IV.F., Full Participation Exercise, of Appendix E to 10 CFR Part 50, due to the special circumstance described in the Exemption dated November 6, 1986. These exemptions are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. The exemptions are hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E. FENOC shall fully implement and maintain in effect all provisions of the l Commission-approved physical security, training and qualification, and safeguards l contingency plans, including amendments made pursuant to provisions of the l Miscellaneous Amendments and Search Requirements revisions to I0 CFR 73.55 l (61 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). l The combined set of plans, which contain Safeguards Information protected under l 10 CFR 73.21, is entitled: "Perry Nuclear Power Plant Physical Security Plan" submitted l by letter dated September 9, 2004, and supplemented on September 30, 2004. l F. Except for Section 2.C.(2), FENOC shall report any violations of the requirements contained in Section 2.C of this license in the following manner: Initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup in accordance with the procedures described in 10 CFR 50.73(a)(1), (b), (c), and (e).

G. The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1964, as amended, to cover public liability claims.

Amendment No. 129 Revised by letter dated October 28, 2004