Supplement to Owner'S Inservice Inspection Summary Report Submitted for Point Beach Nuclear Plant Unit 1 Refueling Outage U1R27
ML042530079
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 08/26/2004
From: Koehl D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2004-0087, U1R27
Download: ML042530079 (4)


Text

Nu Committed to Nuclear Excelln Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC August 26, 2004 NRC 2004-0087 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Unit 1 Docket 50-266 License No. DPR-24 Supplement to Owner's Inservice Inspection Summary Report Submitted For Point Beach Nuclear Plant Unit I Refueling Outage U1 R27

Reference:

1) Letter from NMC to NRC dated January 17, 2003 (NRC 2003-0008)

In Reference 1, Nuclear Management Company, LLC, (NMC) submitted the Owner's Inservice Inspection Summary Report for Point Beach Nuclear Plant (PBNP) Unit 1 Fall 2002 refueling outage (U1 R27) in accordance with ASME Section Xl, Subsection IWA-6230.

During the PBNP U1R27 outage, some of the nozzles on the safety injection accumulator tanks, T-34A and T-34B, were removed as a result of ultrasonic examinations identifying indications on the inside surface. The specific aspects of the Repair/Replacements (R/R) were documented on Section Xl NIS-2 forms. However, a review of the NIS-2 form for the T-34A accumulator showed that the replaced 2-inch piping segment had not been included on the form.

Enclosure 1 to this letter contains a corrected NIS-2 for the Owner's Inservice Inspection Summary Report. This report is being resubmitted in accordance with ASME Section Xl, subsection IWA-6230 as required by the 1998 Edition with Addenda through 2000 of ASME Section Xl.

6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 0(-V Telephone: 920.755.2321

Document Control Desk Page 2 This letter contains no new commitments and no revisions to existing commitments.

I/

Dennis L. Koehl Site Vice President, Po&t Beach Nuclear Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region 111, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC

ENCLOSURE I FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY CORRECTED COPY DATED AUGUST 16, 2004 2 pages follow

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI COPr

1. Owner Nuclear Management Corporation Date August 16, 2004 700 First Street, Hudson, WI 54016 Sheet: I of 2
2. Plant Point Beach Nuclear Plant Unit: I 6610 Nuclear Road, Two Rivers, WI 54241 WO 0212624, 0212683, 0212695 Repair/Replacement Organization P.O. No., Job No. Etc.
3. Work Performed By: Welding Services Inc. Type Code Symbol Stamp NR name 2225 Skyland Ct. Authorization No. NR-69 Norcross, GA 30071 Expiration Date 11/07/2004 address
4. Identification of System: Safety Injection West Spec G676262
5. (a) Applicable Construction Code Section J11, 19 65 Edition, No Addenda, No Code Case (b) Applicable Edition of Section XI Used for Repairs/Replacement Activity 1998 Ed. Addenda thru 2000 (c) Applicable Section XI Code Cases None
6. Identification of Components ASME National arre Name of Namc of Manufacturer Board Other Year Removed or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)

See page 2

7. Description of Work: Modified nozzles to remove indications on the inside surface, replace piping on one nozzle.
8. Tests Conducted: Hydrostatic a Pneumatic El Nominal Operating Pressure ED Exempt El Other E Pressure 735n2/2 psi Test Temp. Ambient 0F System Leakage Test
9. Remarks RR 2002-0094, 2002-0100, 2002-0102, 2002-0105 Applicable Manufacturers Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: N/A Certificate of Authorization No. Expiration Date N/A Signed  ; ISI Coordinator Date r/ 9CIOV

/

Owner or Owner's Designee, Title 7 I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Wisconsin and employed by HSBCT have inspected the components described in this Owner's Report during the period September 26. 2002 to October 31. 2002, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of ASME Code,Section XI.

By signing this certificate, neither the Inspector nor his employer makes any waarranty, expressed or implied, concerning the examinations and corrective measures described in this Ouvner's Report. Furthermore, neither the Inspector nor his employer,711 be liable in any manner for any personal injury or property damage or a loss of any kind Coecn d with this inspection.

kd ACommissions WVI-247972

/fnsptior's Signature National Board. State, Province, and Endorsements PBF-7050 Revision 2 12/02/02 SEM 7.11.1