Third Interim Deficiency Rept Re B&W Nonconservative Analysis of Neutron Flux,Initially Reported on 801105. Investigation Ongoing.Also Reportable Per Part 21.Next Rept Will Be Submitted by 820223
ML20010H813
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 09/21/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-80 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8109290316
Download: ML20010H813 (2)


Text

_ _ _ _ - _ - _ _ - _ _

TENNESSEE VALLEY AUTHORITY . g. -

,7 -i-CHATTANOOGA TENNESSEE 374o1 ,i 400 Cheatnut Street Tower II Jl5" N A S. 32 September 21, 1981 Mr. James P. O'Reilly, Director s Offf'n,^

  • Office of Inspection and Enforcement -

g88g s tI 3. Nuclear Regulatory Commission k * #- O i d

Region II - Suite 3100 m., 87g /gy 101 Marietta Street y  % a-Atlanta, Georgia 30303 7 r s.

j ;M i-

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND ' - BABCOCK & WILCOX'S NONCONSERVATIVE ANALYSIS OF NEUTRON FLUX - NCR BLN NEB 8007 - THIRD INTERIM REPORT On November 5,1980 R. W. Wright, NRC-0IE Region II, was informed that the subject nonconformance was determined to be reportable in accordance with 10 CFR 50.55(e). This was followed by our interin reports dated December 3, 1980 ant March 30, 1981. Enclosed is our third interin report. We consider 'O CFR Part 21 to be applicable to this deficiency. We expect to st 5mit our next report by February 23, 1982.

If you have any questions, please cati Dave Lambert at FTS 857-2581.

Very truly yours, 1 TENNESSEE VALLEY AUTHORITY kl fg))

L. M. Mills, Manager Nuclear Regulation and Safety

[

Enclosure cc: Mr. Victor Stello, Director (Enclosure)

Office of Inspection and Enforcement C.S. Nuclear Regulatory Commission Washington, DC 20555 ghN S

I(

B109290316 810921 ?

FUR ADOCK 05000438 '

S. PDR .. An Equal Opportunity Employer

.p '

ENCLOSURE BELLEFONTE MUCLEAR PLANT UNITS 1 AND 2 BABCCCK & WILCOX'S (B&'ci) NONCONSERVATIVE AMALYSIS OF MEUTRO'I FLUX MCR RLM MER 8007 10 CFR 50.55(e)

THIRD INTERIM REP 09T Dascription of De riciprey P&M's measurement errors assumed in determining Reactor Protection Systen (RPS) setpoints may he nonconservative under specific plant conditions. These errors may allou operation outside the estah11shed safety limits in certain desirn basis events.

The events of concern are: small overcooline and small steam line breaks; large steam line break in containment; and the rod ejection accident.

Interim Procress B&W is continuing their ir.vestigation into this item by way of charge assessment program item No. 007. The B&W schedule calls for input to TVA by February 1082.