ML20039G393

From kanterella
Revision as of 13:52, 14 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to 811231 Request for Schedule of Response to NRC Questions Arising from Review of Preservice Insp Program Abstract.Response to Questions 250.1 & 250.2 Will Be Submitted by 820401 or Prior to Start of Insp Program
ML20039G393
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/11/1982
From: Wuller G
ILLINOIS POWER CO.
To: John Miller
Office of Nuclear Reactor Regulation
References
U-0397, U-397, NUDOCS 8201180144
Download: ML20039G393 (1)


Text

fii/ND/S POWEn COMPANY U-0397

}Yj9 LO 82(0 l) gEET DECATUR, lLLINots 62525 January 11, 1982 9 = '

Mr. James R. Miller, Chief HECEIVED g Standardization & Special Projects Branch k -

Division of Licensing -

JAN151982* r Office of Nuclear Reactor Regulation [ Numaantmenunne f U. S. Nuclear Regulatory Commission " amas s g

Washington, D. C. 20555 o, g

Dear Mr. Miller:

4

Reference:

Letter 12/31/81, J. R. Miller, NRC to G. Wuller, IP,

Subject:

Review of Preservice Inspection Program Abstract Clinton Power Station Unit 1 Docket No. 50-461 This is in reply to the referenced letter, which we received on January 4, wherein you requested our schedule for responding to the questions from the review of the Preservice Inspection Program Abstract.

Illinois Power plans to provide the information requested (Questions 250.1 and 250.2) by April 1, 1982 or prier to the start of the Preservice Inspection Program (PSI) which ever is earliest.

Sincerely, C

6 G. E. Wuller Supervisor - Licensing Nuclear Station Engineering GEW/lt cc: Mr. J. H. Williams, NRC Clinton Project Manager Mr. H. H. Livermore, NRC Resident Inspector 0\

6

$t 8201100144 820111 PDR ADOCK 05000461 G PDR