|
---|
Category:Meeting Summary
MONTHYEARML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections ML23026A3552023-01-31031 January 2023 Summary of Public Meeting with Energy Harbor Nuclear Corp. Regarding Beaver Valley Power Station License Amendment Request to Consolidate Fuel Decay Time TS Into New Limiting Condition for Operation ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML22105A3932022-04-20020 April 2022 Summ. of March 17, 2022, Public Meeting with Ehnc Regarding Planned License Amendment Request to Consolidate Fuel Decay Time Requirements in a New Limiting Condition for Operation for Beaver Valley Power Station, Units 1 and 2 ML22053A2982022-02-25025 February 2022 Summary of the February 15, 2022, Meeting with Energy Harbor Nuclear Corp. Regarding the License Amendment Request Related to Revising TS 5.6.3 Core Operating Limits Report (COLR) ML21308A0712021-11-0909 November 2021 Summary of Teleconference with Energy Harbor Nuclear Corp. Regarding Fall 2021 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML20197A2722020-07-15015 July 2020 2020 Beaver Valley, Calvert Cliffs, Limerick Peach Bottom, Susquehanna Annual Assessment Webinar Summary ML20148M3852020-06-0101 June 2020 Summary of May 26, 2020, Public Meeting with Energy Harbor Nuclear Corp. Potential License Amendment Request Related to Steam Generator Tube Sleeve Inspections and Maintenance ML20122A0032020-05-19019 May 2020 Summary of April 22, 2020, Teleconference with Energy Harbor Nuclear Corp. Regarding Spring 2020 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML20111A0142020-04-27027 April 2020 Summary of March 31, 2020, Public Meeting with Energy Harbor Nuclear Corp. to Discuss COVID-19 Potential Submittals of Regulatory Actions ML16125A5072019-10-22022 October 2019 Ti 191 Issue Matrix ML19280A0382019-10-22022 October 2019 Ti 2515-191 Summary of Findings ML19191A1882019-07-0909 July 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - Meeting Summary ML18325A0232018-11-28028 November 2018 Summary of Teleconference with Firstenergy Nuclear Operating Company Regarding Fall 2018 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML18099A0812018-04-0606 April 2018 Bv Annual Assessment Meeting Summary and Attendance List 2018 ML17347A8082017-12-20020 December 2017 December 5, 2017, Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss a Proposed License Amendment Request Extending Sleeve Life on the Steam Generator at Beaver Valley Power Station, Unit 2 ML17158B1662017-06-0909 June 2017 Summary of Meeting with Firstenergy Nuclear Operating Company Regarding the Spring 2017 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML17082A1842017-03-28028 March 2017 March 20, 2017, Summary of Annual Assessment Meeting with Beaver Valley, Units 1 and 2 ML16250A5012016-10-0303 October 2016 Summary of August 30, 2016, Meeting with Firstenergy Nuclear Operating Company Regarding Planned Submittal of Emergency Action Level Scheme Change ML16105A0082016-04-25025 April 2016 March 30, 2016, Summary of Meeting with Firstenergy Nuclear Operating Company on Its Draft Probabilistic Risk Assessment RAI Related to Its License Amendment Request to Adopt NFPA Standard 805 ML16091A0702016-03-31031 March 2016 2016 Beaver Valley Annual Assessment Meeting Summary 2016 ML15320A3912015-11-24024 November 2015 Summary of Conference Call Regarding the Fall 2015 Steam Generator Inspections ML15225A4812015-08-14014 August 2015 July 23, 2015, Summary of Meeting with Representatives of the U.S. Army Corps, U.S. Nuclear Regulatory Commission and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station ML15135A2982015-05-21021 May 2015 Summary of April 28, 2015, Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station, ML15104A6652015-04-14014 April 2015 April 9, 2015 Summary of Annual Assessment Meeting with Beaver Valley Power Station, Units 1 and 2 ML14325A7782014-12-16016 December 2014 October 6, 2014, Summary of Pre-Application Meeting with Firstenergy Nuclear Operating Company to Discuss Proposed Combination of Site Emergency Plans ML14184B1962014-08-14014 August 2014 Summary of June 18, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and Firstenergy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Stat ML14160B1032014-07-10010 July 2014 June 6, 2014 Summary of Meeting with FENOC Flooding Hazard Reevaluation Extension Request for Beaver Valley Power Station, Units 1 and 2 and Flooding Hazard Reevaluation Report for Davis-Besse Nuclear Power Station, Unit 1 ML14142A0872014-06-0909 June 2014 Summary of Conference Call Regarding the Spring 2014 Steam Generator Inspections ML14099A1732014-04-0909 April 2014 Annual Assessment Meeting Summary, ROP14 ML13295A2182013-10-22022 October 2013 Summary of Public Meeting with Beaver Valley, ML13114A2072013-04-22022 April 2013 Summary of Annual Assessment Meeting at Beaver Valley ML13057A6782013-03-11011 March 2013 2/20/2013 - Summary of Meeting with Firstenergy Nuclear Operating Company to Discuss Proposed Request for Additional Information Response Regarding Beaver Valley Power Station End-of-Life Moderator Temperature Coefficient Testing ML12321A3012012-11-29029 November 2012 Summary of November 15, 2012, Meeting with Firstenergy Nuclear Operating Company to Discuss Upcoming License Amendment Request Relating to the Implementation of the Alternate Pressurized Thermal Shock Rule ML12310A0662012-11-13013 November 2012 Summary of Conference Call with Firstenergy Nuclear Operating Company to Discuss 2012 Steam Generator Tube Inspections ML12293A0402012-11-0101 November 2012 October 18, 2012 - Summary of Meeting with Firstenergy Nuclear Operating Company to Discuss Request for Additional Information Regarding Fenoc'S Extension Request for Upcoming Beaver Valley Power Station National Fire Protection Association ML12277A4082012-10-0303 October 2012 September 26, 2012, Summary of Public Meeting to Discuss FENOC Fleet Performance ML12223A4672012-08-22022 August 2012 August 1, 2012 - Summary of Meeting with FENOC to Discuss Upcoming National Fire Protection Association Standard 805 License Amendment Request Status ML12195A1132012-07-16016 July 2012 Summary of Public Meeting with FENOC Regarding Licensing Practices and Processes ML12104A1052012-04-13013 April 2012 Meeting Summary of Annual Assessment Meeting on March 22, 2012 ML1115805152011-06-15015 June 2011 (BVPS-2) - Summary of Conference Call Regarding the Spring 2011 Steam Generator Tube Inspection Results ML1112504622011-05-0505 May 2011 Summary of Annual Assessment Open House Public Meeting, Beaver Valley ML1035606612010-12-29029 December 2010 Summary of Beaver Valley Power Station, Unit 2 Public Conference Call Regarding Spent Fuel Pool Rerack LAR Draft RAI Responses Discussion ML1027903512010-10-18018 October 2010 Summary of Meeting with Firstenergy Nuclear Operating Company, on the Request for Additional Resposnses Regarding the Spent Fuel Rerack for Beaver Valley Power Station, Unit No. 2 ML1014105172010-05-21021 May 2010 Summary of the May 2010 Annual Assessment Open-House Public Meeting ML1013206652010-05-18018 May 2010 Summary of Category 1 Teleconference with Firstenergy Nuclear Operating Company to Discuss NRC Request for Additional Information Regarding Generic Letter 2004-02 ML1009502432010-04-0505 April 2010 Meeting Summary of 3-31-10 Public Meeting with FENOC ML0931407282009-11-18018 November 2009 Steam Generator Tube Inspections 2024-06-03
[Table view] Category:Note to File incl Telcon Record
MONTHYEARML19093B8332019-04-0909 April 2019 Review of Updated Final Safety Analysis Report, Revision 31 ML16224A7652016-10-20020 October 2016 Review of Updated Final Safety Analysis Report, Revision 22 ML0925102262009-09-0808 September 2009 Docketing of U.S. Nuclear Regulatory Commission Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 & 2 ML0921805572009-08-12012 August 2009 Conference Call - Containment Liner Corrosion - Friday, July 24, 2009 11:30 A.M ML0921802062009-08-11011 August 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0918707572009-07-0808 July 2009 Call Summary Regarding Decommissioning Funding Status ML0534001642005-12-0202 December 2005 Summary of a Telephone Conference Call Held on June 28, 2005, Between the NRC and Firstenergy Nuclear Operating Company ML0403401322003-07-16016 July 2003 Telephone Message for Chairman Nils Diaz from Peter Berg, First Energy, Providing Name of New President and Chief Nuclear Officer 2019-04-09
[Table view] Category:Verbal Comm
MONTHYEARML19093B8332019-04-0909 April 2019 Review of Updated Final Safety Analysis Report, Revision 31 ML16224A7652016-10-20020 October 2016 Review of Updated Final Safety Analysis Report, Revision 22 ML0925102262009-09-0808 September 2009 Docketing of U.S. Nuclear Regulatory Commission Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 & 2 ML0921805572009-08-12012 August 2009 Conference Call - Containment Liner Corrosion - Friday, July 24, 2009 11:30 A.M ML0921802062009-08-11011 August 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0918707572009-07-0808 July 2009 Call Summary Regarding Decommissioning Funding Status ML0534001642005-12-0202 December 2005 Summary of a Telephone Conference Call Held on June 28, 2005, Between the NRC and Firstenergy Nuclear Operating Company ML0403401322003-07-16016 July 2003 Telephone Message for Chairman Nils Diaz from Peter Berg, First Energy, Providing Name of New President and Chief Nuclear Officer 2019-04-09
[Table view] |
Text
December 2, 2005 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Beaver Valley Power Station, Units 1 and 2
SUBJECT:
SUMMARY
OF A TELEPHONE CONFERENCE CALL HELD ON JUNE 28, 2005, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING CLARIFICATION OF INFORMATION CONTAINED IN THE NRC LETTER DATED MARCH 24, 2005, RESULTS OF ACCEPTANCE REVIEW OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission staff (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC) held a telephone conference call on June 28, 2005, to discuss and clarify the staffs comments concerning the Beaver Valley Power Station, Units 1 and 2, previous license renewal application. The conference call was useful in clarifying the staffs examples of deficiencies found in the license renewal application. The following items were discussed: (1) Components in scope - Section 2; (2) Fatigue Monitoring Program; (3) Application tables and notes; (4) Steam Generator Tube Inspection; (5) Risk Assessment - profiles and unit differences; (6) Boric Acid Program - management vs. detection; (7) Stress corrosion cracking vs. fatigue; and (8) Checklist items. provides a listing of the telephone conference call participants.
The applicant had an opportunity to comment on this summary.
/RA/
Donnie J. Ashley, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos.: 50-334 and 50-412
Enclosure:
As stated cc w/encl: See next page
ML053400164 DOCUMENT NAME: E:\Filenet\ML053400164.wpd OFFICE DLR:RLRA:PM DLR:LA DLR:RLRA:BC NAME DAshley MJenkins LLund (JEads for)
DATE 12/01 /05 11/30 /05 12/02/05 cc:
David W. Jenkins, Attorney Mr. L. William Pearce, Vice President FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company FirstEnergy Corporation Beaver Valley Power Station 76 South Main Street Post Office Box 4 Akron, OH 44308 Shippingport, PA 15077 L. R. Freeland, Manager Regulatory J. H. Lash, Director-Site Operations (BV-A)
Compliance (BV-A) FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Beaver Valley Power Station Beaver Valley Power Station Post Office Box 4 Post Office Box 4, BV-A Shippingport, PA 15077 Shippingport, PA 15077 Rich Janati, Chief Commissioner James R. Lewis Division of Nuclear Safety West Virginia Division of Labor Bureau of Radiation Protection 749-B, Building No. 6 Department of Environmental Protection Capitol Complex Rachel Carson State Office Building Charleston, WV 25305 P.O. Box 8469 Harrisburg, PA 17105-8469 Director, Utilities Department Public Utilities Commission Mayor of the Borough of Shippingport 180 East Broad Street P.O. Box 3 Columbus, OH 43266-0573 Shippingport, PA 15077 Director, Pennsylvania Emergency Regional Administrator, Region I Management Agency U.S. Nuclear Regulatory Commission 2605 Interstate Dr. 475 Allendale Road Harrisburg, PA 17110-9364 King of Prussia, PA 19406 Ohio EPA-DERR Resident Inspector ATTN: Zack A. Clayton U.S. Nuclear Regulatory Commission Post Office Box 1049 Post Office Box 298 Columbus, OH 43266-0149 Shippingport, PA 15077 Dr. Judith Johnsrud R.G. Mende, Director, Performance National Energy Committee Improvement (BV-IPAB)
Sierra Club FirstEnergy Nuclear Operating Company 433 Orlando Avenue Beaver Valley Power Station State College, PA 16803 Post Office Box 4 Shippingport, PA 15077 B. F. Sepelak, Supv Regulatory Compliance (BV-A)
FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077
Beaver Valley Power Station cc:
Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Roger Rucker, PM License Renewal (BV-A)
FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077
DISTRIBUTION: Summary of telecon held on 6/28/2005 with FirstEnergy, Dated: December 2, 2005 Adams Accession No.: ML053400164 HARD COPY DLR RF E-MAIL:
RidsNrrDlr RidsNrrDe G. Bagchi K. Manoly J. Calvo R. Jenkins J. Fair RidsNrrDss D. Thatcher R. Pettis G. Galletti K. Winsberg (RidsOgcMailCenter)
R. Weisman M. Mayfield A. Murphy S. Smith (srs3)
S. Duraiswamy Y. L. (Renee) Li DLR Staff C. Holden R. Laufer T. Colburn D. Shum R. Lorson, RI M. Modes, RI M. Sykes, RI P. Eselgroth, RI P. Cataldo, RI G. Smith, RI Lawyer OPA
LIST OF PARTICIPANTS FOR A TELEPHONE CONFERENCE CALL BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY June 28, 2005 Participants Affiliations Donnie Ashley U.S. Nuclear Regulatory Commission (NRC)
Bob Palla NRC Kaihwa Hsu NRC Carolyn Lauron NRC Leslie Miller NRC Kenneth Chang NRC Kimberly Corp NRC Roger Rucker FirstEnergy Nuclear Operating Company (FENOC)
Steve Dort FENOC John Thomas FENOC Jim Hester FENOC Don Kosloff FENOC Gary Smith FENOC Lance Garrett FENOC Enclosure