ML053400164

From kanterella
Jump to navigation Jump to search
Summary of a Telephone Conference Call Held on June 28, 2005, Between the NRC and Firstenergy Nuclear Operating Company
ML053400164
Person / Time
Site: Beaver Valley
Issue date: 12/02/2005
From: Ashley D
NRC/NRR/ADRO/DLR/RLRA
To:
Office of Nuclear Reactor Regulation
ashley D, NRR/DLR/RLRB, 415-3191
References
Download: ML053400164 (7)


Text

December 2, 2005 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Beaver Valley Power Station, Units 1 and 2

SUBJECT:

SUMMARY

OF A TELEPHONE CONFERENCE CALL HELD ON JUNE 28, 2005, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING CLARIFICATION OF INFORMATION CONTAINED IN THE NRC LETTER DATED MARCH 24, 2005, RESULTS OF ACCEPTANCE REVIEW OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission staff (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC) held a telephone conference call on June 28, 2005, to discuss and clarify the staffs comments concerning the Beaver Valley Power Station, Units 1 and 2, previous license renewal application. The conference call was useful in clarifying the staffs examples of deficiencies found in the license renewal application. The following items were discussed: (1) Components in scope - Section 2; (2) Fatigue Monitoring Program; (3) Application tables and notes; (4) Steam Generator Tube Inspection; (5) Risk Assessment - profiles and unit differences; (6) Boric Acid Program - management vs. detection; (7) Stress corrosion cracking vs. fatigue; and (8) Checklist items. provides a listing of the telephone conference call participants.

The applicant had an opportunity to comment on this summary.

/RA/

Donnie J. Ashley, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos.: 50-334 and 50-412

Enclosure:

As stated cc w/encl: See next page

ML053400164 DOCUMENT NAME: E:\Filenet\ML053400164.wpd OFFICE DLR:RLRA:PM DLR:LA DLR:RLRA:BC NAME DAshley MJenkins LLund (JEads for)

DATE 12/01 /05 11/30 /05 12/02/05 cc:

David W. Jenkins, Attorney Mr. L. William Pearce, Vice President FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company FirstEnergy Corporation Beaver Valley Power Station 76 South Main Street Post Office Box 4 Akron, OH 44308 Shippingport, PA 15077 L. R. Freeland, Manager Regulatory J. H. Lash, Director-Site Operations (BV-A)

Compliance (BV-A) FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Beaver Valley Power Station Beaver Valley Power Station Post Office Box 4 Post Office Box 4, BV-A Shippingport, PA 15077 Shippingport, PA 15077 Rich Janati, Chief Commissioner James R. Lewis Division of Nuclear Safety West Virginia Division of Labor Bureau of Radiation Protection 749-B, Building No. 6 Department of Environmental Protection Capitol Complex Rachel Carson State Office Building Charleston, WV 25305 P.O. Box 8469 Harrisburg, PA 17105-8469 Director, Utilities Department Public Utilities Commission Mayor of the Borough of Shippingport 180 East Broad Street P.O. Box 3 Columbus, OH 43266-0573 Shippingport, PA 15077 Director, Pennsylvania Emergency Regional Administrator, Region I Management Agency U.S. Nuclear Regulatory Commission 2605 Interstate Dr. 475 Allendale Road Harrisburg, PA 17110-9364 King of Prussia, PA 19406 Ohio EPA-DERR Resident Inspector ATTN: Zack A. Clayton U.S. Nuclear Regulatory Commission Post Office Box 1049 Post Office Box 298 Columbus, OH 43266-0149 Shippingport, PA 15077 Dr. Judith Johnsrud R.G. Mende, Director, Performance National Energy Committee Improvement (BV-IPAB)

Sierra Club FirstEnergy Nuclear Operating Company 433 Orlando Avenue Beaver Valley Power Station State College, PA 16803 Post Office Box 4 Shippingport, PA 15077 B. F. Sepelak, Supv Regulatory Compliance (BV-A)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077

Beaver Valley Power Station cc:

Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Roger Rucker, PM License Renewal (BV-A)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077

DISTRIBUTION: Summary of telecon held on 6/28/2005 with FirstEnergy, Dated: December 2, 2005 Adams Accession No.: ML053400164 HARD COPY DLR RF E-MAIL:

RidsNrrDlr RidsNrrDe G. Bagchi K. Manoly J. Calvo R. Jenkins J. Fair RidsNrrDss D. Thatcher R. Pettis G. Galletti K. Winsberg (RidsOgcMailCenter)

R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li DLR Staff C. Holden R. Laufer T. Colburn D. Shum R. Lorson, RI M. Modes, RI M. Sykes, RI P. Eselgroth, RI P. Cataldo, RI G. Smith, RI Lawyer OPA

LIST OF PARTICIPANTS FOR A TELEPHONE CONFERENCE CALL BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY June 28, 2005 Participants Affiliations Donnie Ashley U.S. Nuclear Regulatory Commission (NRC)

Bob Palla NRC Kaihwa Hsu NRC Carolyn Lauron NRC Leslie Miller NRC Kenneth Chang NRC Kimberly Corp NRC Roger Rucker FirstEnergy Nuclear Operating Company (FENOC)

Steve Dort FENOC John Thomas FENOC Jim Hester FENOC Don Kosloff FENOC Gary Smith FENOC Lance Garrett FENOC Enclosure