Responds to 820127 Confirmatory Action Ltr.Mgt Guides & Procedures for Nonconformance Program Will Be Issued by 820701.Project Personnel Training Will Be Completed by 820715
ML20055B417
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/22/1982
From: Gerstner W
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20055B415 List:
References
U-0507, U-507, NUDOCS 8207220194
Download: ML20055B417 (3)


Text

- -

0982-L

/LLINO/S POWER COMPANY U-0507 CLINTON POWER STATION. P.O. box 678. CLINTON, ILLINOIS 61727 June 22, 1982 Mr. James G. Keppler Director, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 61037

Dear Mr. Keppler:

This is in response to your letter to Mr. W.C. Gerstner, dated June 10, 1982, regarding certain concerns you had with our response to Confirmation of Action Letter dated January 27, 1982.

With reference to your letter, "...Baldwin Associates Surveil-lance Reports should be reviewed for nonconforming items not previously identified on an NCR/DR and initiate an NCR/DR on these items".

- Baldwin Associates Quality Assurance will perform a review of Baldwin Associates Surveillance Reports to determine if nonconforming conditions were identified that were not pro-cessed on an NCR/DR. NCRs/ ors will be initiated for any nonconforming conditions identified during this review.

With reference to your letter, "...you expect to have a nonconformance program for use during the startup and operating phase by July 1, 1982. We believe that common prudence would dictate that this program be implemented at the earliest possible time. You should also consider increasing the scope of this program to address nonconformances during the construction and testing phases in accordance with Chapter 15, paragraph A.2; Division of Responsibility, of the Clinton Power Station Quality Assurance Manual".

- Illinois Power fully intends to implement the nonconformance program at the earliest possible date. The July 1, 1982 date provided in our response was an estimated date for the completion of program development. The Management Guides and procedures for this program will be approved and issued by July 1, 1982. Training of project personnel will begin upon issuance of procedures and will be completed by July 15, 1982.

Materials necessary to implement program, such as, Hold Tags, etc., have been identified and are being purchased. These materials should be received by August 15, 1982. During the interim period of implementing this program, Illinois Power intends to use present Baldwin Associates and Illinois Power Plant Staff programs for reporting nonconformances. We will 8207220194 B20719 PDR ADOCK 05000461 JUN 2 ov 198Lo O PDR _.

~

J. G. Keppler June 22, 1982 URC Page 2 accomplish this by identifying nonconforming conditions on Condition Reports for items or equipment under the jurisdiction of either Illinois Power Startup or Plant Staff.

For nonconformances identified on items or equipment under Baldwin Associates jurisdiction, Baldwin Associates Project Engineering or Quality and Technical Services will initiate a Baldwin Associates Nonconformance Report. We sill continue to aggressively expedite the implementation of our nonconformance program.

- The nonconformance program presently under development by Illinois Power Company does address nonconformances identified during the testing phase at Clinton Power Station. Nonconfor-mances identified during the construction phase are controlled under existing programs. The present Baldwin Associates Nonconformance Program allows anyone in the Illinois Power organization to identify nonconforming conditions during the construction phase at Clinton Power Station and initiate a NCR. Similarly, the Illinois Power Nonconformance Program allows anyone in the contractor /sub-contractor organization to identify a nonconforming condition and initiate a Condition Report.

With reference to your letter, "...we understand that Baldwin Associates QA will review and approve the first 25 of a series of NSSS, Mechanical and Electrical Equipment travelers to ensure correct format and content, and that they will do further periodic surveillance to ensure that results are consistent".

- Baldwin Associates Quality Assurance Department will review the first 25 of a series of NSSS, Mechanical and Electrical Equipment travelers for correct format and content. Baldwin Associates Quality Assurance will include in their Surveil-lance Schedule periodic surveillances of these types of travelers to ensure that results are consistent.

With reference to your letter, "... Illinois Power QA will conduct periodic and frequent surveillances of the traveler program to ensure that the format, content, and usage is correct".

- Illinois Power QA Surveillances of the traveler program are scheduled on a quarterly basis. These surveillances include documented reviews of travelers used in the Piping, Mechan-ical, Electrical and NSSS disciplines. This quarterly sur-veillance concept is supplemented by our Notification Point Program, which includes surveillance of specific activities and the associated travelers; the use of frequent routine surveillances of in-process activities and the associated travelers; and, scheduled audits of the traveler program.

These activities ensure that traveler format, content, and usage is correct.