MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20197G5521998-10-28028 October 1998 Rev 8 to Dbnps,Unit 1 Technical Requirements Manual ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20206D2721998-08-28028 August 1998 Rev 11,change 1 to Odcm ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217M5601997-09-0505 September 1997 Rev 11.0 to Davis-Besse Odcm ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20140D9481997-04-0909 April 1997 ODCM, Rev 10 ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20107C3101995-12-21021 December 1995 Rev 9 to Odcm 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20197G5521998-10-28028 October 1998 Rev 8 to Dbnps,Unit 1 Technical Requirements Manual ML20206D2721998-08-28028 August 1998 Rev 11,change 1 to Odcm ML20217M5601997-09-0505 September 1997 Rev 11.0 to Davis-Besse Odcm ML20140D9481997-04-0909 April 1997 ODCM, Rev 10 ML20107C3101995-12-21021 December 1995 Rev 9 to Odcm ML20107C3021995-10-16016 October 1995 Rev 8 to Odcm ML20199L1821995-09-0909 September 1995 Rev 3 to DB-OP-00000, Conduct of Operations ML20082V4071995-02-0303 February 1995 Offsite Dose Calculation Manual Rev 7 ML20072S8611994-06-22022 June 1994 Rev 6 to Davis-Besse Offsite Dose Calculation Manual ML20056F3071993-08-0808 August 1993 Rev 3 to Emergency Plan Off Normal (Epon) Occurrence Procedure HS-EP-02820, Earthquake. W/Rev 23 to Epon Occurrence Procedures Manual Table of Contents ML20072S8401992-12-18018 December 1992 Rev 5 to Davis-Besse Process Control Program ML20072S8501992-12-18018 December 1992 Rev 5.2 to Davis-Besse Offsite Dose Calculation Manual, Reflecting Rev 5,Change 2 to ODCM ML20101R1721992-06-11011 June 1992 Rev 1 to Vol I of Inservice Insp Plan,Second 10-Yr Nuclear Interval Pump & Valve Inservice Testing Program ML20114C6321992-05-19019 May 1992 Change 1 to Rev 5 to ODCM ML20114C6301992-03-0606 March 1992 Rev 5 to ODCM ML20217C3661991-07-0808 July 1991 Rev 3 to Administrative Procedure NG-IS-00002, General Nuclear Security Requirements. Pages 7,9,10 & 15 Only ML20084U5911991-02-22022 February 1991 Rev 4 to ODCM ML20217C3481990-12-18018 December 1990 Rev 1 to Security Dept Procedure IS-DP-04007, Performance Test for Alco-Sensor ML20059D4181990-08-28028 August 1990 Second 10-Yr Interval Pump & Valve Inservice Testing Program ML20217C3001990-08-23023 August 1990 Rev 5 to Security Dept Procedure IS-AC-00011, Protected & Vital Area Badge Issuance & Control ML20217C3571990-08-0909 August 1990 Rev 3 to Security Implementing Procedure IS-AC-00516, Unescorted Access Requirements ML20217C3071990-07-27027 July 1990 Rev 2 to Security Dept Procedure IS-AC-00015, Fingerprint Processing & Controls ML20217C3201990-06-27027 June 1990 Rev 1 to Security Dept Procedure IS-AC-00018, Drug & Alcohol Testing Process ML20217C3811990-06-22022 June 1990 Rev 4 to Nuclear Group Procedure NG-IS-00004, Fitness for Duty Program ML20217C4001990-04-0202 April 1990 Corporate Ref Manual - Nuclear NU-102, Fitness for Duty ML20217C3401990-01-12012 January 1990 Rev 1 to Security Dept Procedure IS-DP-00101, Bac Simulation ML20217C3281989-11-0909 November 1989 Rev 1 to Security Dept Procedure IS-DP-00100, Bac Exams ML20217C3141989-10-25025 October 1989 Rev 2 to Security Dept Procedure IS-AC-00017, Denied Access List Control ML20217C3941989-08-0101 August 1989 Corporate Ref Manual - Human Resource HR-604, Drug & Alcohol Policy ML20244A8421989-05-31031 May 1989 Pressurizer Surge Line Thermal Stratification Phase I Program ML20213A0311987-03-31031 March 1987 Rev 2 to Vol IV of Procedure Writers Manual:Operation Procedures Guidelines ML20213A0361987-03-31031 March 1987 Rev 1 to Davis Besse Emergency Procedure Verification & Validation Program ML20212D1621987-01-27027 January 1987 Rev 1 to Maint Procedure MP 1411.06, Preventive Maint for Type Smb & Smc Valve Operators ML20198D2551986-12-27027 December 1986 Rev 2 to Maint Procedure MP 1411.04, Maint & Repair of Limitorque Valve Operators Type SMB-000 & SMB-00. Temporary Mod Request T-9969,indicating Rewiring of Fcr 85-302 MU-11 to Torque Out in Open Direction,Encl ML20212B5721986-12-15015 December 1986 Rev 0 to Security Training & Qualification Plan, Superseding Rev 24 to App B of ISP AD1808.00.W/o Revised Pages ML20212C9481986-11-21021 November 1986 Rev 8 to Maint Procedure Mpo 1410.32, Testing of Motor- Operated Valves Using Movats ML20212D3131986-10-28028 October 1986 Change 3 to Temporary Mods T10161 & T10144 to Rev 0 to Maint Procedure MP 1411.07, Maint & Repair of Limitorque Valve Opr Smc 04, Incorporating Fcr 86-0092,Rev a Re Removal & Installation of Limiter Plate ML20212D1091986-10-21021 October 1986 Change 1 to Rev 2 to Maint Procedure MP 1411.04, Maint & Repair of Limitorque Valve Operators Type SMB-000 & Smb 00, Addressing Need for Procedure to Address Replacement of Defectrive Parts ML20212D1471986-10-0303 October 1986 Rev 1 to Maint Procedure MP 1411.05, Maint & Repair of Limitorque Valve Operators Types SMB-0 Through SMB-4 ML20212C9181986-09-22022 September 1986 Rev 1 to Procedure NEP-092, Establishing D/P Limits & Tests for Q Motor Operated Valves ML20203M0201986-08-21021 August 1986 Specs for Mist Continuous - Venting Tests ML20210V1131986-08-20020 August 1986 Rev 0 to Emergency Plan Implementing Procedure EP-2320, Emergency Technical Assessment ML20206P6511986-06-30030 June 1986 GE Owners Group Action Plan as Result of Davis-Besse Event, June 1986 ML20198D2361986-05-0202 May 1986 Rev 5 to Maint Procedure MP 1410.32, Testing of Motor- Operated Valves Using Movats ML20141J5231986-04-18018 April 1986 Human Engineering Discrepancy Review & Closeout Process for Davis-Besse Dcrdr Program ML20205M6981986-04-0707 April 1986 Rev 0 to Nuclear Engineering Procedure NEP-092, Establish Differential Pressure Limits & Tests for Motor-Operated Valves ML20205M7031986-03-25025 March 1986 Rev 0 to Nuclear Engineering Procedure NEP-091, Motor- Operated Valve (MOV) Data Evaluation ML20141N1501986-02-26026 February 1986 Procedure Fcr 85-227, Main Feedwater Block Valve Interlock ML20141N1561986-02-26026 February 1986 Procedure Fcr 85-200, Main Feedwater Pumps Rapid Feedwater Reduction Speed Setpoint ML20141N1531986-02-26026 February 1986 Procedure Fcr 85-201, Steam Generator Level Setpoint 1998-08-28
[Table view] |
Text
- __.
v[ .- .. .
Y r
' ,. m .
THE TOLEDO EDISON CCMPANY DAVIS-BESSE NUCLEAR POWER STATION DfERGENCT PLAN IMPLDfENTING PROCEDURES i REVISION INDEI
-4
- PAGE REVISICN PROCDURES REVISIOi TEMPORARY MODIFICAT ONS i 0 EI 1300.00 1 EI 1300.01 2 EI 1300.02 1 EI 1300.03 1 EI 1300.04 1 EI 1300.05 l EI 1300.06 2 EI 1300.07 1 k,
~
EI 1200.08 2 T-5849 l
~
l
- EI 1300.09 0 EI 7.300.10 0 EI 1300.11 0 q
C. 1300.12 1 T-5850. T-5918 h
3 i
.m hi C
J i, Revision 7
L 8202230040 920211 i
PDR ADOCK 05000346 F PDR a
ad CCSEC:OCC' 21'.221
- P ^000;', 052002'i GF
l
.. s
\
DGTRIIUTION i original, Responsible Sectson Head Action
, _ Fii. copy. Master File COPIES TO BE MODIFIED FOR IMMEDI ATE IMPLEMENTATION DAVIS BESSE NUCLEAR POWER STATION -UNIT 1 Shift Supervisors Office - 2 TEMPORARY MODIFICATION REQUEST ED 6926 Control Room - 2 ; Emergency Planning ~-
SECTION 1 PHoCEDUHE TITLE AND NUMBER EI 1300.12 Administrat,'.. e Mntrols Emergency Plan Implementing Proceedure RE ASoN FOR CHANGE To upgrade inventory in First Aid Response Equipment, CHANGE Page 7, Attachment 1. . . the First Aid Bag Contents should be changed to read Orange Trauma Kit Contents and changed to include the attached list,ing.
See Attachment.
Addition of Attachment 4. . . . "First Aid Kit- Suit Cace Inventory" and to Itemi2,o the attached list.
Cao A L Lachmen t Addition of Attachment 5.. . 'smerger.cy Medical Equipment Cabinet Contents, 623' level Turbine Bldg." To include: 1 Renuccitator,1 Orn ny.c Traum Kit, 1 Adult Hope 11 Resuscitator, 1 02 Double Sphere Unit, 1 full length Backboard,1 short Backboard,1 Hare Traction Leg Splint, 1 First Aid Suitcane , 1 S tre tc her.
IS PROCEDURE REVISION REQUIRED PREPARED 0Y DA TE Judy lildicy, Cafet.y Coordinat orD 7 -
/d2/2,4 APPROVED HY DATE
,qM m I APPROVED BY , /
DATE hfia)g ' ',w - /
l */
[Le /["f SuaMITT5 0 ilY (Section Head) '
DATE O /gjgp # />/ 23/ J;y e4ECOMMENDED BY (SR'B Chairman)
DATE b/ fpA
}Y l ' 'I/W QA APPROVED BY (Manager odellth Assuranc DATE
/ /
'yt }/ APPROVED b (Station supermtea M%n -
OATE i d'- @
.. s RhdMW
[/ /[ gg ORANGE TIIT AID KIT INVEUT0iiY Sottom Compartment 1- Burn & Trauma Dressing 18x24"-arm 1- Burn & Trauma Dressing 24x31"-1cg 1- Disposable blanket 1- Set of Body Binders 1- Cervical Collar- Lg
' 1- Trauma Dressing 30x10"- Dyna Med 1- Sterile burn sheet 66x99- Dyna Med . .
2- 4 1/2x6." self adhesive guaze 1- full leg air splint 1- 1/2 leg air splint 1- foot / ankle air splint 1- full arm air splint 1- 1/2 arm air splint 1- hand / wrist air splint Upper Compartment 1- Poison antidote kit 9- 5x9" abdominal pads 10-4x4 dressing sponges 1- flashlight 1- Saunders snakebite kit 1- jaw spreader f
1- 2" adhesive tape roll -
1- 1" adhesive tape roll 1- ring cutter 1- blood pressure cuff 1- stethoscope 3- sm1 ice paks 2- lg. ice paks Upper Trays 2- Thermometers, oral & rectal 24-Sml. alcohol prep pads 1- roll 4" guaze bandage S- steriltcotton tip applicators 1- 3" " "
6 lemon glycerin swabs 1- 2" " "
S- oval eye pads 2- 1" " "
1- "
1- eye irrigation solution "
6" elastic Bandage 1- 4" " "
1- rescue blanket 56x86" 1- " "
1- surgical sissors-Lg 2" 2- 1/2" roll adhenive tape 1- pr clusors-clamp 4- 4" bandage compress 1 pr small sissors 3- pr various tweezeru 3- 3" guaze compress 1 sm child lifesaver tube 2- 2" guaze compress 1- pediatric lifccaver tube 9- Triangular bandages 1- adult lifesaver tube 3- 8x10 guace pads 6- diagnoutic flauhlichtu 3- 5x9 guaze pads 1-box (10) ammonia inhalents 2- 3" bandage roll, duaze 1- box (10) coap swaba 2- cye dressing packets 100-bandaids 25-plastic finger tip banoages 10-oval cover 1 cts, bancaida
FIRST AID KIT-SUITCASE ENENTORY EMERGENCY MEDICAL MUIPMENT CABINET 623' TURBINE BLDG.
1- Towel 2- Blarsets 4- paper sheets- not sterile 1- cloth sheet- not sterile 10- wood splints 5- body binders 6- air splints-full leg full arm 1/2 leg 1/2 arm hand / wrist foot / ankle 1- med. cervical collar 1- Ig. cervical collar 1- 30x10 " Trauma Dressing 3- 36x99" burn sheets 1- flashlight wrist & chin straps /backtoard pillow for backboard I
s e
i i
l l