ML20055G191

From kanterella
Revision as of 16:10, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Advanced BWR Control Bldg Seismic Rept, Per Request.Ge Will Amend Ssar W/Response in Future Amend
ML20055G191
Person / Time
Site: 05000605
Issue date: 07/12/1990
From: Marriott P
GENERAL ELECTRIC CO.
To: Chris Miller
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20055G194 List:
References
EEN-9038, NUDOCS 9007200228
Download: ML20055G191 (2)


Text

--

V

. M i GE Nuclear Energy ce w v o :t comr e 175 ru tner Artcue bn Jm CA 95125 m

July 12,1990 MFN No.084 90 Docket No. STN 50-605 .

EEN 9038 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 -

Attention: Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate -

Subject:

Response 3 to ABWR Seismic Design Audit Open Issues and information Requests

References:

1, Dino C. Scaletti to Patrick W. Marriott, " Meeting Summary of the 'ABWR Seismic Design Audit," May 1990.

2. R.C. Mitchell to Charles L Miller, same subject, May 16,1990 Enclosed are thirty four copies of the GE response to the Reference I request to provide results of the seismic analyses for the control building. Specifically, these results respond to Item I.2 of Reference 1. This information supplements that provided earlier under Reference 2.

It is intended that GE will amend the SSAR with this response in future amendment.

Sincerely, N

P.W. Nlarriott, Manager Licensing and Consulting Services cc: F.A. Ross (DOE)

D.C. Scaletti(NRC)

D.R. Wilkins (GE)

J.F. Quirk (GE) 0

- 9007200228 900712 )

PDR .ADOCK0500g5

y ..

i! ,

/ . ' l.

l,; . ' i )'i, ' '

  • . < GE Nuclear Energy

'I i _

i (ff Pfd ' [I.T i h(T&$y'

'3 Mw A.the :e.use :a 9511!

July 12,1990 MFN No. 084 90 Docket No. STN 50 605 EEN 9038

- Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Charles L Miller, Director

, Standardization and Non Power Reactor Project-Directorate

Subject:

Responses to ABWR Seismic Design Audit Open Issues and Information Requests

References:

1. Dino C, Scaletti to Patrick W. Marriott," Meeting Summary of the ABWR Seismic Design Audit," May 1990.
2. R.C. .Mitchell to Charles L Miller, same subject, May 16,1990 Enclosed are thirty four copies of the GE response to the Reference 1 request to provide results of the seismic analyses for the control building. Specifically, these results respond to Item I.2 of Reference 1. This information supplements that provided earlier under Reference 2.

It is intended that GE will amend the SSAR with this response in future amendment.

Sincerely,.

/

. P.W. NIarriott, Manager Licensing and Consulting Services ,

cc: F.A. Ross (DOE)

D.C. Scaletti (NRC)

D.R. Wilkins (GE)

J.F. Ouirk (GE) i