Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20073T0701 July 1994Reports Changes & Errors in ECCS Evaluation Models
ML20090J96511 March 1992Forwards Piping Design Insps,Tests,Analysis & Acceptance Criteria (Itaac).Piping Design ITAAC Will Be Included as Part of Generic ITAACSafe Shutdown
ML20090J97011 March 1992Forwards Proprietary Responses to Issues Re Sections 9.3,9.5 & 11.2 of Advanced BWR Ssar.Responses Reflect Correctons & Additions to Earlier Proprietary Submittals.Responses Withheld
ML20090J97911 March 1992Forwards Responses to Resolution of Issues Related to Advanced BWR Draft SER Chapters 1,2,3,5,6,9,10,12,13,14 & 15 (SECY-91-355)
ML20090J99411 March 1992Forwards Draft Rev 0 to Advanced BWR Srvdl Wetwell Piping Stress Analysis Design Rept & Draft Rev 0 to Design Rept, Main Steam Line a & Safety Relief Valve Discharge Piping Stress Analysis, Per 911209-10 Ge/Nrc MeetingSafe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML20090G5809 March 1992Summerizes Staff Position Re NRC Conference Call on Dser Comments to Advanced BWR Ssar ISI Requirements
ML20090F6175 March 1992Forwards Rev B to 23A6100AQ,Section 17.3 Re Responses to Request for Resolution of Issues Related to Reliability Assurance Program (Rap).Subj Responses Will Be Included as Amend to Advanced BWR Ssar in Future
ML20094G9692 March 1992Forwards Radwaste Bldg Seismic Analysis. Informs That GE Intends to Amend Ssar W/Subj Analysis in Future Amend
ML20094G74025 February 1992Forwards Proprietary Summary of 920127 Telcon W/Nrc & Brookhaven Lab to Clarify Aspects of Human Factors Review of Advanced Bwr,Specifically Review of Design Implementation Process.Summary Withheld
ML20090A04425 February 1992Forwards Proprietary Rev R-0 to Advanced BWR Project Common Engineering Work Plan. Plan Withheld
ML20094G71425 February 1992Forwards Proprietary Revised App 18E, Advanced BWR Man-Machine Interface Sys Design & Implementation Process, of Advanced BWR Ssar.App Withheld
ML20092N14525 February 1992Requests Addition of Listed Individual to Advanced BWR Document Distribution List
ML20092L08025 February 1992Forwards App 19P to Chapter 19 of Evaluation of Potential Mods to Advanced BWR DesignProbabilistic Risk Assessment
Backfit
ML20090B18824 February 1992Forwards Draft Rev 0 to Advanced BWR Ssar Main Steam, Feedwater & Srvdl Piping Sys Design Criteria & Analysis Methods & Draft Rev 0 to Advanced BWR Feedwater Loop a Piping & Equipment Loads, Per Ge/Nrc 911209-10 Meeting
ML20092M29320 February 1992Forwards Discussion of Differences Between Us Advanced BWR & K-6/7 Project.Advanced BWR Design Under Review for for Differences to K 6/7 & Addl Differences Will Be Included in Future Ssar AmendUltimate heat sink
Turbine Missile
ML20094G72017 February 1992Forwards Proprietary Revised App 18E, Advanced BWR Man-Machine Interface Sys Design & Implementation Process, of Advanced BWR Ssar.App Withheld
ML20092F42414 February 1992Forwards Proprietary Portion of GE Response to Agenda Items Discussed During 911120-21 Meeting W/Nrc Reactor Sys Branch. Response Withheld
ML20092F46014 February 1992Forwards Nonproprietary Portion of GE Response to Agenda Items Discussed During 911120-21 Meeting W/Nrc Reactor Sys Branch Re Standby Liquid Control Sys Instrumentation & ControlsSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Safe Shutdown Earthquake
Earthquake
ML20092F49713 February 1992Forwards Proprietary App 18F, Emergency Operation Info & Controls to Chapter 18, Human Factors Engineering of Advanced BWR Std SAR Covering Control Room Inventory.App 18F Withheld
ML20092F52511 February 1992Responds to Performance & Quality Evaluation Branch Open Items on Advanced BWR Std SAR Chapter 14
ML20092F51810 February 1992Forwards Responses to 920110-16 Requests for Addl Info on Advanced BWR Design for Severe AccidentsFuel cladding
ML20092C0253 February 1992Forwards Proprietary Responses to Addl Info Noted in 911004 Draft SER for Chapter 7.Responses Are Cross Ref W/Summary Item Number Corresponding to Review Meeting in San Jose on 910807 & 08.Responses Withheld
ML20092C1673 February 1992Forwards Nonproprietary Responses to Addl Items of Concern Noted in Draft SER for Chapter 7.Advises That GE Will Amend Advanced BWR Ssar W/Responses in Future AmendFire Barrier
Coatings
ML20092C1833 February 1992Forwards Response to Leak Before Break Issue Addressed in 911209-10 Ge/Nrc Meeting.Advises That GE Intend to Amend Ssar W/Response in Future AmendEarthquake
ML20100P96531 January 1992Forwards Proprietary NEDC-30032 Joint Study Final Rept - Joint Study W/Regard to 'Study (II) Related to Advanced Bwr' - Thermal Margin During Rapid Coastdown,820401-830331. Rept Withheld
ML20091K89122 January 1992Forwards Response to Open Issue 3 of SECY-91-153 Re Main Steam Line Seismic Classification Including,Static Design Procedure to Be Utilized in Evaluation of Seismic Capability of Condenser Anchorage & Turbine BldgEarthquake
ML20094E45717 January 1992Forwards Tier 1 Design Certification Matl,Pilot Itacc Examples for GE Advanced BWR Design & Advanced BWR Design Certification Generic ITAAC for Seismic Category 1 Structures,Position Paper
ML20087D26410 January 1992Forwards Response to Agenda Items 1,5,9 & 16 Discussed at Ge/Nrc Reactor Sys Branch 911120-21 Meetings.Items Include, Stability Performance in Normal Operating Region,Loss of Ac Power & Loss of Feedwater Heating Transient
ML20087D47710 January 1992Forwards Responses to Agenda Item 12 Discussed During 911120-21 Meeting W/Reactor Sys Branch of Nrc.Responses Withheld
ML20087D0016 January 1992Forwards Proprietary Tables to App 18F to Chapter 18 Re Human Factors Engineering.Ge Will Amend Ssar to Include Subj Info in Future Amend.Encl Withheld
ML20087B7166 January 1992Forwards Response to Issues Raised at Ge/Nrc 911209-10 Meetings Re Inservice Insp Relief Requests for Reactor Pressure Vessel Bottom Head Weld & Reactor Pressure Vessel Bottom head-to-shell WeldHigh Radiation Area
Hydrostatic
VT-2
Liquid penetrant
ML20086U5456 January 1992Forwards Response to NRC Request for Addl Info Re Incorporation of Operating Experience in Advanced BWRFitness for Duty
Fire Barrier
Scram Discharge Volume
Dissimilar Metal Weld
ML20086U19420 December 1991Confirms That Licensee Advanced BWR Application Should Be Processed as Application for Part 52 Final Design Approval & Subsequent Design Certification Per 10CFR52.45
ML20086N96019 December 1991Forwards Proprietary & Nonproprietary Versions of Rev B to Update of App 9A, Reactor Bldg Fire Hazard Analysis
ML20086P22519 December 1991Forwards Nonproprietary Responses to Resolution of Issues Re Advanced BWR Draft SERSafe Shutdown
Ultimate heat sink
Grab sample
Safe Shutdown Earthquake
Internal Flooding
Earthquake
ML20086P21619 December 1991Forwards Proprietary Responses to Resolution of Issues Re Advanced BWR Draft SER
ML20091H40613 December 1991Forwards Selected Sections of Chapter 9, Auxiliary Sys & Chapter 18, Human Factors Engineering of Ssar for Advanced Bwr,Amend 19,including Update of Control Bldg Fire Protection Drawings.Encl Withheld
ML20086N21613 December 1991Forwards Amend 19 to Advanced BWR Ssar
ML20094D20412 December 1991Forwards Proposed Advanced BWR Tech Specs,Per Vendor to Nrc.Specs Will Be Documented Via Amend to Chapter 16 of Advanced BWR Ssar,Once Specs Finalized
ML20086H5742 December 1991Describes Plan for Submitting Advanced BWR Tech Specs to Nrc,Per 911108 Meeting.First Submittal of Noninstrumentation & Control Sys Will Be Submitted by 911213.Third Submittal Re 65 Unchanged LCOs Will Be Submitted by 920131
ML20086H61627 November 1991Forwards Proprietary Responses to Open Issues 8.3.3.6 & 8.3.5 for Advanced BWR Ssar,Chapter 8,per Commitment at 910916-18 Meeting in San Jose.Encl Withheld
ML20086H61027 November 1991Forwards Responses to Open Issues in GE Advanced BWR Ssar Chapter 8 Re Offsite Power Sys & Protective Sys for Reactor Internal Pumps,Per 910916-18 Meeting W/Nrc.Proprietary Versions of Response WithheldHot Short
Safe Shutdown
Ultimate heat sink
Fire Barrier
Emergency Lighting
Abnormal operational transient
Earthquake
Offsite Circuit
Fire Protection Program
ML20086E48325 November 1991Forwards Tables Re Significant New Open Issues Included in Final,Draft Ser,Significant Open Items Included in All Draft Sers,Ge Future Submittals & Proposed Issues for Discussion at Dec Mgt Meeting,Per NRC
ML20086C72012 November 1991Forwards Proprietary Draft Writeup for Fire Protection PRA, as Requested in Draft SER on Advanced BWR Pra,Per SECY-91-309,dtd 911001.Encl WithheldProbabilistic Risk Assessment
ML20086A81212 November 1991Forwards Draft Writeup for Fire Protection Probabilistic Risk Assessment Requested in Draft SER on Advanced BWR Probabilistic Risk Assessment.Ge Will Amend Ssar to Include Info When FinalizedSafe Shutdown
Probabilistic Risk Assessment
ML20079P1737 November 1991Forwards Response to Discussion Item 7 from 910906 Conference Call Re Rod Block Algorithm & Setpoint
ML20079M2561 November 1991Forwards Proprietary GE Responses to Staff Position Re GE BWR Power Upgrade Program,Dtd 910930.Responses in Ref to Licensing Topical Rept NEDC-31897P-1, Generic Evaluations of GE BWR Power Uprate,June 1991. Responses Withheld
ML20079L7461 November 1991Forwards Summary of Major Advanced BWR Design Differences, Assessment of How TS Differ from Improved Ts,Including Summary of New,Different or Inapplicable & Example of How TS Would Be Written Where TS Differ from Improved TSShutdown Margin
Ultimate heat sink
Hydrostatic
Scram Discharge Volume
ML20079L31225 October 1991Forwards Rept Providing Update of in-reactor Surveillance Programs & Overall GE BWR Fuel Experience Through Dec 1990Fuel cladding
ML20085K26325 October 1991Forwards Addl Documents,In Response to NRC Re Resolution of Issues Related to Chapter 18 of Ssar for Advanced BWR Design.Documents Withheld