Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20073T070 | 1 July 1994 | Reports Changes & Errors in ECCS Evaluation Models | |
ML20090J965 | 11 March 1992 | Forwards Piping Design Insps,Tests,Analysis & Acceptance Criteria (Itaac).Piping Design ITAAC Will Be Included as Part of Generic ITAAC | Safe Shutdown |
ML20090J970 | 11 March 1992 | Forwards Proprietary Responses to Issues Re Sections 9.3,9.5 & 11.2 of Advanced BWR Ssar.Responses Reflect Correctons & Additions to Earlier Proprietary Submittals.Responses Withheld | |
ML20090J979 | 11 March 1992 | Forwards Responses to Resolution of Issues Related to Advanced BWR Draft SER Chapters 1,2,3,5,6,9,10,12,13,14 & 15 (SECY-91-355) | |
ML20090J994 | 11 March 1992 | Forwards Draft Rev 0 to Advanced BWR Srvdl Wetwell Piping Stress Analysis Design Rept & Draft Rev 0 to Design Rept, Main Steam Line a & Safety Relief Valve Discharge Piping Stress Analysis, Per 911209-10 Ge/Nrc Meeting | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20090G580 | 9 March 1992 | Summerizes Staff Position Re NRC Conference Call on Dser Comments to Advanced BWR Ssar ISI Requirements | |
ML20090F617 | 5 March 1992 | Forwards Rev B to 23A6100AQ,Section 17.3 Re Responses to Request for Resolution of Issues Related to Reliability Assurance Program (Rap).Subj Responses Will Be Included as Amend to Advanced BWR Ssar in Future | |
ML20094G969 | 2 March 1992 | Forwards Radwaste Bldg Seismic Analysis. Informs That GE Intends to Amend Ssar W/Subj Analysis in Future Amend | |
ML20094G740 | 25 February 1992 | Forwards Proprietary Summary of 920127 Telcon W/Nrc & Brookhaven Lab to Clarify Aspects of Human Factors Review of Advanced Bwr,Specifically Review of Design Implementation Process.Summary Withheld | |
ML20090A044 | 25 February 1992 | Forwards Proprietary Rev R-0 to Advanced BWR Project Common Engineering Work Plan. Plan Withheld | |
ML20094G714 | 25 February 1992 | Forwards Proprietary Revised App 18E, Advanced BWR Man-Machine Interface Sys Design & Implementation Process, of Advanced BWR Ssar.App Withheld | |
ML20092N145 | 25 February 1992 | Requests Addition of Listed Individual to Advanced BWR Document Distribution List | |
ML20092L080 | 25 February 1992 | Forwards App 19P to Chapter 19 of Evaluation of Potential Mods to Advanced BWR Design | Probabilistic Risk Assessment Backfit |
ML20090B188 | 24 February 1992 | Forwards Draft Rev 0 to Advanced BWR Ssar Main Steam, Feedwater & Srvdl Piping Sys Design Criteria & Analysis Methods & Draft Rev 0 to Advanced BWR Feedwater Loop a Piping & Equipment Loads, Per Ge/Nrc 911209-10 Meeting | |
ML20092M293 | 20 February 1992 | Forwards Discussion of Differences Between Us Advanced BWR & K-6/7 Project.Advanced BWR Design Under Review for for Differences to K 6/7 & Addl Differences Will Be Included in Future Ssar Amend | Ultimate heat sink Turbine Missile |
ML20094G720 | 17 February 1992 | Forwards Proprietary Revised App 18E, Advanced BWR Man-Machine Interface Sys Design & Implementation Process, of Advanced BWR Ssar.App Withheld | |
ML20092F424 | 14 February 1992 | Forwards Proprietary Portion of GE Response to Agenda Items Discussed During 911120-21 Meeting W/Nrc Reactor Sys Branch. Response Withheld | |
ML20092F460 | 14 February 1992 | Forwards Nonproprietary Portion of GE Response to Agenda Items Discussed During 911120-21 Meeting W/Nrc Reactor Sys Branch Re Standby Liquid Control Sys Instrumentation & Controls | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Safe Shutdown Earthquake Earthquake |
ML20092F497 | 13 February 1992 | Forwards Proprietary App 18F, Emergency Operation Info & Controls to Chapter 18, Human Factors Engineering of Advanced BWR Std SAR Covering Control Room Inventory.App 18F Withheld | |
ML20092F525 | 11 February 1992 | Responds to Performance & Quality Evaluation Branch Open Items on Advanced BWR Std SAR Chapter 14 | |
ML20092F518 | 10 February 1992 | Forwards Responses to 920110-16 Requests for Addl Info on Advanced BWR Design for Severe Accidents | Fuel cladding |
ML20092C025 | 3 February 1992 | Forwards Proprietary Responses to Addl Info Noted in 911004 Draft SER for Chapter 7.Responses Are Cross Ref W/Summary Item Number Corresponding to Review Meeting in San Jose on 910807 & 08.Responses Withheld | |
ML20092C167 | 3 February 1992 | Forwards Nonproprietary Responses to Addl Items of Concern Noted in Draft SER for Chapter 7.Advises That GE Will Amend Advanced BWR Ssar W/Responses in Future Amend | Fire Barrier Coatings |
ML20092C183 | 3 February 1992 | Forwards Response to Leak Before Break Issue Addressed in 911209-10 Ge/Nrc Meeting.Advises That GE Intend to Amend Ssar W/Response in Future Amend | Earthquake |
ML20100P965 | 31 January 1992 | Forwards Proprietary NEDC-30032 Joint Study Final Rept - Joint Study W/Regard to 'Study (II) Related to Advanced Bwr' - Thermal Margin During Rapid Coastdown,820401-830331. Rept Withheld | |
ML20091K891 | 22 January 1992 | Forwards Response to Open Issue 3 of SECY-91-153 Re Main Steam Line Seismic Classification Including,Static Design Procedure to Be Utilized in Evaluation of Seismic Capability of Condenser Anchorage & Turbine Bldg | Earthquake |
ML20094E457 | 17 January 1992 | Forwards Tier 1 Design Certification Matl,Pilot Itacc Examples for GE Advanced BWR Design & Advanced BWR Design Certification Generic ITAAC for Seismic Category 1 Structures,Position Paper | |
ML20087D264 | 10 January 1992 | Forwards Response to Agenda Items 1,5,9 & 16 Discussed at Ge/Nrc Reactor Sys Branch 911120-21 Meetings.Items Include, Stability Performance in Normal Operating Region,Loss of Ac Power & Loss of Feedwater Heating Transient | |
ML20087D477 | 10 January 1992 | Forwards Responses to Agenda Item 12 Discussed During 911120-21 Meeting W/Reactor Sys Branch of Nrc.Responses Withheld | |
ML20087D001 | 6 January 1992 | Forwards Proprietary Tables to App 18F to Chapter 18 Re Human Factors Engineering.Ge Will Amend Ssar to Include Subj Info in Future Amend.Encl Withheld | |
ML20087B716 | 6 January 1992 | Forwards Response to Issues Raised at Ge/Nrc 911209-10 Meetings Re Inservice Insp Relief Requests for Reactor Pressure Vessel Bottom Head Weld & Reactor Pressure Vessel Bottom head-to-shell Weld | High Radiation Area Hydrostatic VT-2 Liquid penetrant |
ML20086U545 | 6 January 1992 | Forwards Response to NRC Request for Addl Info Re Incorporation of Operating Experience in Advanced BWR | Fitness for Duty Fire Barrier Scram Discharge Volume Dissimilar Metal Weld |
ML20086U194 | 20 December 1991 | Confirms That Licensee Advanced BWR Application Should Be Processed as Application for Part 52 Final Design Approval & Subsequent Design Certification Per 10CFR52.45 | |
ML20086N960 | 19 December 1991 | Forwards Proprietary & Nonproprietary Versions of Rev B to Update of App 9A, Reactor Bldg Fire Hazard Analysis | |
ML20086P225 | 19 December 1991 | Forwards Nonproprietary Responses to Resolution of Issues Re Advanced BWR Draft SER | Safe Shutdown Ultimate heat sink Grab sample Safe Shutdown Earthquake Internal Flooding Earthquake |
ML20086P216 | 19 December 1991 | Forwards Proprietary Responses to Resolution of Issues Re Advanced BWR Draft SER | |
ML20091H406 | 13 December 1991 | Forwards Selected Sections of Chapter 9, Auxiliary Sys & Chapter 18, Human Factors Engineering of Ssar for Advanced Bwr,Amend 19,including Update of Control Bldg Fire Protection Drawings.Encl Withheld | |
ML20086N216 | 13 December 1991 | Forwards Amend 19 to Advanced BWR Ssar | |
ML20094D204 | 12 December 1991 | Forwards Proposed Advanced BWR Tech Specs,Per Vendor to Nrc.Specs Will Be Documented Via Amend to Chapter 16 of Advanced BWR Ssar,Once Specs Finalized | |
ML20086H574 | 2 December 1991 | Describes Plan for Submitting Advanced BWR Tech Specs to Nrc,Per 911108 Meeting.First Submittal of Noninstrumentation & Control Sys Will Be Submitted by 911213.Third Submittal Re 65 Unchanged LCOs Will Be Submitted by 920131 | |
ML20086H616 | 27 November 1991 | Forwards Proprietary Responses to Open Issues 8.3.3.6 & 8.3.5 for Advanced BWR Ssar,Chapter 8,per Commitment at 910916-18 Meeting in San Jose.Encl Withheld | |
ML20086H610 | 27 November 1991 | Forwards Responses to Open Issues in GE Advanced BWR Ssar Chapter 8 Re Offsite Power Sys & Protective Sys for Reactor Internal Pumps,Per 910916-18 Meeting W/Nrc.Proprietary Versions of Response Withheld | Hot Short Safe Shutdown Ultimate heat sink Fire Barrier Emergency Lighting Abnormal operational transient Earthquake Offsite Circuit Fire Protection Program |
ML20086E483 | 25 November 1991 | Forwards Tables Re Significant New Open Issues Included in Final,Draft Ser,Significant Open Items Included in All Draft Sers,Ge Future Submittals & Proposed Issues for Discussion at Dec Mgt Meeting,Per NRC | |
ML20086C720 | 12 November 1991 | Forwards Proprietary Draft Writeup for Fire Protection PRA, as Requested in Draft SER on Advanced BWR Pra,Per SECY-91-309,dtd 911001.Encl Withheld | Probabilistic Risk Assessment |
ML20086A812 | 12 November 1991 | Forwards Draft Writeup for Fire Protection Probabilistic Risk Assessment Requested in Draft SER on Advanced BWR Probabilistic Risk Assessment.Ge Will Amend Ssar to Include Info When Finalized | Safe Shutdown Probabilistic Risk Assessment |
ML20079P173 | 7 November 1991 | Forwards Response to Discussion Item 7 from 910906 Conference Call Re Rod Block Algorithm & Setpoint | |
ML20079M256 | 1 November 1991 | Forwards Proprietary GE Responses to Staff Position Re GE BWR Power Upgrade Program,Dtd 910930.Responses in Ref to Licensing Topical Rept NEDC-31897P-1, Generic Evaluations of GE BWR Power Uprate,June 1991. Responses Withheld | |
ML20079L746 | 1 November 1991 | Forwards Summary of Major Advanced BWR Design Differences, Assessment of How TS Differ from Improved Ts,Including Summary of New,Different or Inapplicable & Example of How TS Would Be Written Where TS Differ from Improved TS | Shutdown Margin Ultimate heat sink Hydrostatic Scram Discharge Volume |
ML20079L312 | 25 October 1991 | Forwards Rept Providing Update of in-reactor Surveillance Programs & Overall GE BWR Fuel Experience Through Dec 1990 | Fuel cladding |
ML20085K263 | 25 October 1991 | Forwards Addl Documents,In Response to NRC Re Resolution of Issues Related to Chapter 18 of Ssar for Advanced BWR Design.Documents Withheld |