ML20094G740
| ML20094G740 | |
| Person / Time | |
|---|---|
| Site: | 05000605 |
| Issue date: | 02/25/1992 |
| From: | Nease R GENERAL ELECTRIC CO. |
| To: | NRC |
| Shared Package | |
| ML20034D276 | List: |
| References | |
| NUDOCS 9203030287 | |
| Download: ML20094G740 (1) | |
Text
- -
=
hCC[c3 b 4 u c 4.
- n 4 4 4 4 + +, 4, + + + + + 4 4. + + +. 4 t + 4 4 4 +. 4 u +, u # + 4 t.u u + 4 4 + n 4, 4
....FROPRIETARY INFORMATION............
4 + + + + +. + n + + 4 4 + + + 4. + + 4 + n 4 + 4 u. * + + n u + + 4 4 * + + u o v u n u + 4 4 4 4 + +
DOCKET NiJMBER: 50-605 PROJECT: ADVANCED BOILING WATER REACTOR STANDARD DESIGN REVIEW DATE:
02/26/92 NOTE TO:
DOCKET FILE FRG R.
Neace s
SUBJ ECT :
ADVANCED BOILING WATER REACTOR (AEWRf DESIGN IMPLEMENTATION PROCESS REVIEW l
Enclosed is a summary of a ceipi'me conference held between Ge,eral Electric (GE) representative rinC etaf f~, and Brookhaven National Laboratory staff on January
'27 1992.
Tne purpose of-this teleconference was to clarify aspects of the Human Factort Review l-of the ABWR, spec ific ally review of the design implemuntation process.
Please be aware that this summary 1n based on GE PROPRIETARY information and hae an NFC Fcrm 190 attached (Yel. low Sheet).
Place this summary on the docket but NOT~ IN THE NRC FUBLIC l
DOCUMENT ROOM.
l
'ISTRIBUTION wfEncls:
PDST R/F rw c., n
,n o
DISTRIBUTION w/o Ermlr::
kNby L<
nS C.
Poelunny.
R. Mease V. McCree c of 3nq N s' t! ~
s) 9203030297 920225 DFPI PDR ADOCK 05000605 l gg A
-