ML20043A547
| ML20043A547 | |
| Person / Time | |
|---|---|
| Site: | 05000605 |
| Issue date: | 05/02/1990 |
| From: | Sozzi G GENERAL ELECTRIC CO. |
| To: | Chris Miller Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20043A548 | List: |
| References | |
| 037-90, 37-90, NUDOCS 9005220228 | |
| Download: ML20043A547 (2) | |
Text
-
A
]
GE Nuclear Energy sena, cem f 7b ru%e' Atnur 5m he CA LU26 May 2,1990 (Corrected Date) hiFN No. 037 90 Docket No. STN 50-605 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:
Charles L Miller, Director Standardization and Non Power Reactor Project Directorate
Subject:
Submittal of Amendment 11, Non Proprietary Information, to GE's AllWR SSAR
Reference:
Submittal of Amendment 11, Proprietary Information, to GE's ABWR SSAR, MFN No. 038 90, dated hiny 2,1990
Dear hir. hiiller:
Enclosed are thirty four copies of selected sections of Chapter 1, Introduction and General Description of Plant, Chapter 3 Design of Structures, Components, Equipment, and Systems, Chapter 5. Reactor Coolant System and Connected Systems, Chapter 6, Engineered Safety Features, Chapter 7, Instnnnentation and Contml Systems, Chapter 9, Auritiary Systems, Chapter 10, Steam and Pmver Conversion, Chapter 11, Radioactive Waste Management, Chapter 13, Conduct of Operation, Chapter 14, initial Test Program, Chapter 19, Response to Severe Accident Policy Statement, Chapter 20, Guestion and Response Guide, of the Standard Safety Analysis Report (SSAR) for the Advanced Boiling Water Reactor (ABWR).
This submittal includes additions covering the following: Response to standby gas treatment system questions, includes modifications to the design; Addition of a flammability control system to the atmospheric control system; Addition of the initial test program for the turbine island and radwaste facilities; Addition of the reactor service and turbine water systems; Resolution of draft safety evaluation report open items for Chapters 4,5 and 6 (except for preservice/ inservice inspection plan); Resolution of preliminary draft safety evaluation report items for Chapters 3 (except for inservice testing plan); Expansion of Chapter 7 that includes turbine island and radwaste facility instrumentation and controls; Balance of Chapter 7 and 10 question responses; Update of apphcable USIs/GSis; and Closecut of design related emergency preparedness issue.
ffff 9005220228 900502 PDR ADOCK 05000605 K
PDC 1
- i,,
l i
1 m.i.
1 4
I l
Document Control Desk -
- Docket No. STN 50 605 i*
U.S. Nuclear Regulatory Commission MFN No. 037 90 May 2,1990 -
t
- Page 2 l
i
. In addition there are other changes to various sections of the SSAR which are identified, along with the above changes, on the page change instruction sheet.
l Please note that all or parts of the following sections contain information that is designated as -
General Electric Company proprietary information: 7.7,19.5,19B and 203. This information is :
being submitted under separate cover.
Sincerely, I
1 p
p 1
U
-G.L.Sozzi, Actin Manager Licensing and Consulting Services b
cc:
D. R. Wilkins (GE)
.i T. E. Murley (NRC)
D. M. Crutchfield (NRC) s D.J. McGoff (DOE)
[.
' F. J. Miraglia, Jr. (NRC)
D. C. Scaletti (NRC)
P K. E. Stahlkopf '(EPRI)
F. A. Ross (DOE)
EEN9018 m
e
+;-
r 4
L V
$