ML19332D759

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Section of Chapter 8 Responses to 890516 Request for Addl Info Re Ssar for Advanced BWR
ML19332D759
Person / Time
Site: 05000605
Issue date: 11/27/1989
From: Marriott P
GENERAL ELECTRIC CO.
To: Chris Miller
NRC
Shared Package
ML19293A057 List:
References
MFN-094-89, MFN-94-89, NUDOCS 8912050202
Download: ML19332D759 (1)


Text

.

.n.

, _ ;r ~y y ?. .

l GE Nuclear Energy

.I r N8 hi .,e $

I15 Cuns Anue. San .k:.c. CA 9512b Q, %

'i ' November 27,' 1989 :

n -

MFN No.094-89 4

Docket No. STN 50 605 i

e(

,. - Document Control Desk

'T .U.S. Nuclear Regulatory Commission

. Washington, D.C. 20555 -

p L

Atterition: . Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate

Subject:

Submittal of Proprietary Section of Responses to Additional Information as Requested in NRC Letter from Dino C. Scaletti, Dated May 16,1989 y '

4

Reference:

Submittal of Responses to AdditionalInformation as Requested in NRC Letter from Dino C. Scaletti, Dated May 16,1989, MFN No. 093 89, dated November 27,1989 )

1

Dear Mr. Miller:

o Enclosed are thirty four (34) copies of the proprietary section of the referenced Chapter 8 c; - responses to the subject Request for Additional Information (RAI) on the Standard Safety

' Analysis' Report (SSAR) for the Advanced Boiling Water Reactor (ABWR). This information

, . includes Tab.e 1, Equipment Database, and Figures 8.31 through 8.3 8.

Sincerely, 4

P. V/.Marriott, Manager Licensing and Consulting Services n  !

i p ***y or 0Q csj

\ .

v f0A. t >

8912050202 891127 PDR: ADOCK 05000605 A PDC j

!