ML20059C047
| ML20059C047 | |
| Person / Time | |
|---|---|
| Site: | 05000605 |
| Issue date: | 08/23/1990 |
| From: | Marriott P GENERAL ELECTRIC CO. |
| To: | Chris Miller NRC |
| Shared Package | |
| ML19307A510 | List: |
| References | |
| EEN-9050, NUDOCS 9008310014 | |
| Download: ML20059C047 (1) | |
Text
.
. /7 es GE Nuclear Energy i
(cat (wit Comt.ny 175 Curtw A ea Se.t:ur. CA 95125 1
1 MFN No.107 90 Docket No.STN50 605 EEN 9050 Document Control Desk i
U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:
Charles L Miller, Director Standardization and Non. Power Reactor Project Directorate
Subject:
lluman Factors Draft SSAR Revisions, Proprietary Information
Reference:
Submittal of Amendment 13 Propriety Information, to GE's ABWR SSAR, MFN No. 077 90, dated July 3,1990 J
Dear Mr. Miller:
Enclosed are thirty four (34) copies of Chapter 18,' Human Factors *, draft revisions to the Standard Safety Analysis Report (SSAR) for the Advanced Boiling Water Reactor (ABWR). This draft provides information supplemental to Appendix 18A, as previously submitted, and provides a new appendix, Appendix 18D, ' Emergency Procedures Gulclelines Input Data and Calculation
- Resu'ts'. In addition, there are several other changes to Chapter 18 included.
Appendix 18A is being sent as a complete packape, including the pages that did not change, to facilitate the use of this revised appendix. The revised pages are noted on the lower left by the word ' Amendment
- without a number.
This material relates to the Cha ater 18 proprietary information that was previously sent to the NRC via the above reference and ; ts corresponding proprietary affidavit.
It is intended that GE will amend the SSAR in a future amendment.
Sincerely, P.W. Marriott, Manager i
L Regulatory and Analysis Services cc:
i:.A. Ross (DOE)
D.C. Scaletti(NRC)
D.R. Wilkins (GE) 8[
AA?C hg /h jp J.F. Quirk (OE) ismsasassggs N
]
s