ML20043C274
| ML20043C274 | |
| Person / Time | |
|---|---|
| Site: | 05000605 |
| Issue date: | 05/31/1990 |
| From: | Marriott P GENERAL ELECTRIC CO. |
| To: | Chris Miller NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19298E085 | List: |
| References | |
| EEN-9024, MFN-059-90, MFN-59-90, NUDOCS 9006040314 | |
| Download: ML20043C274 (1) | |
Text
,-
q r
GE NucIcar Energy 3
t Geivtal Cectre Compan,-
US Cete A#a Se Jose. CA 95'25 May 31,1990 MFN No.059 90 Docket No. STN 50-605 EEN 9024 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 1
Attention:
Charles L. Miller, Director Standardization and Non Power Reactor Project Directorate
Subject:
Submittal of Responses to AdditionalInformation as Requested in NRC Letter from Dino C. Scaletti, Dated May 1,1989 l
l
Reference:
Submittal of Amendment 4 to GE's ABWR SSAR, l
MFN No. 05-89, dated January 31,1989 l
I Submittal of Amendment 8 to GE's ABWR SSAR, MFN No. 052-89, dated July 28,1989 l
Dear Mr. Miller:
Enclosed are thirty four copies of the Chapter '19 responses to the subject Request for Additional Information (RAl) on the Standard Safety Analysis Report (SSAR) for the Advanced Boiling Water Reactor (ABWR).
Please note that this material contains information that is designated as General Electric Company proprietary information. This material relates to the Chapter 19 proprietary information that was l
-previously sent to the NRC via the above referenced letters and their corresponding proprietary i
L i
it is intended that GE will amend the SSAR with these responses in a future amendment.
Sincerely, i
P. W. Marriott, Manager e
Licensing and Consulting Services
{
I i
gg$
ec:
F.A. Ross (DOE)
D.C. Scaletti (NRC)
D.R. Wilkins (GE) 98 g
]
J.F. Quirk (GE)
If fg
]
9006040314 900531 l
A PDR ADOCK 05000605
.8.