ML20041C783

From kanterella
Revision as of 14:29, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Amend 13 to Fsar,Consisting Primarily of Complete Revision of Chapter 14
ML20041C783
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/26/1982
From: Koch L
ILLINOIS POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20041C784 List:
References
U-0421, U-421, NUDOCS 8203020558
Download: ML20041C783 (1)


Text

fii/NDIS PDWER COMPANY U-0421 jfg j L34-82 (02-26) ,R p, DECATUR, LLUNOts 62525 February 26, 1982 9 ~

// q, gj ELEChiiVED 3 Mr. Harold R. Denton, Director .- _

1982 5 Office of Nuclear Reactor Regulation MAR 1 U. S. Nuclear Regulatory Commission  :{

6 n un mu mr G-Washington, D. C. 20555 A' "# Ef"

Dear Mr. Denton:

, g N 07 L11nton Power Station Unit 1 Docket No. 50-461 Final Safety Analysis Report (FSAR) Amendment No. 13 Illinois Power Company hereby files Amendment No. 13, dated February, 1982, for the Clinton Final Safety Analysis Report (CPS-FSAR). FSAR Amendment No. 13 consists primarily of a complete revision of Chapter 14 as a result of additional Staff review questions, miscellaneous revisions to resolve some safety evaluation report issues; and some minor editorial changes.

Three (3) signed originals and eighty-five (85) copies are furnished for amending the FSAR sets provided to NRC per 10 CFR 50.30.

Respectfully submitted, ILLINOIS POWER COMPANY L.- . Koch Vi e President GEW:mr Subscribed and sworn to before me the 26th day of 4 ML.

February, 1982.

Notary Public Q s

3 85' 8203020558 820226 PDR ADOCK 05000461 K PDR