R. E. Ginna - Transmittal of 2009 Owner'S Activity Report for the Refueling Outage Conducted
ML093491001
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/10/2009
From: Swift P
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML093491001 (10)


Text

Paul Swift Manager, Nuclear Engineering Services R.E. Ginna Nuclear Power Plant, LLC CENG.

a joint ventre of 1503 Lake Road Ontario, New York 14519-9364 585.771.5208 585.771.3392 Fax Constellation 4~D Paul.swift@cengllc.com December 10, 2009 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

R.E. Ginna Nuclear Power Plant Docket No. 50-244 Transmittal of 2009 Owner's Activity Report for the R.E. Ginna Nuclear Power Plant Enclosed is a copy of the R.E. Ginna Owner's Activity Report for the refueling outage conducted in 2009.

This report is submitted as specified by ASME Code section XI.

There are no regulatory commitments contained in this letter. Should you have questions regarding this matter, please contact Thomas Harding (585) 771-5219, or thomas.hardingirgcengllc.com.

Very truly yours, Paul M. Swift Attachments: (1) FOURTH INSERVICE INSPECTION (ISI) INTERVAL and FIRST CONTAINMENT INSPECTION INTERVAL, THIRD INSPECTION PERIOD, 2009 OWNER'S ACTIVITY REPORT FOR RFO-34 INSERVICE EXAMINATIONS, (September 13, 2009 through October 4, 2009) cc: S. J. Collins, NRC D. V. Pickett, NRC Resident Inspector, NRC Acý4-7 k-IaZA

&LkzJ(gc-~ /OO)?a~o

Attachment (1)

FOURTH INSERVICE INSPECTION (ISI) INTERVAL and FIRST CONTAINMENT INSPECTION INTERVAL THIRD INSPECTION PERIOD 2009 OWNER'S ACTIVITY REPORT FOR RFO-34 INSERVICE EXAMINATIONS (September 13, 2009 through October 4, 2009)

Constellation Energy Nuclear Group II1 Market Place Suite 200C Baltimore, Maryland 21202 FOURTH INSERVICEINSPECTION (1S). INTERVAL-and FIRST CONTAINMENT INSPECTION INTERVAL THIRD INSPECTION PERIOD 2009 OWNER'S ACTIVITY REPORT FOR RFO-34 INSERVICE EXAMINATIONS (September 13, 2009 through October 4, 2009)

Prepared For R. E. Ginna Nuclear Power Plant 1503 Lake Road Ontario, NY 14519 Commercial Service Date; June 1, 1970 NRC Docket Number; 50-244 Revision Number: 00 Date: December 4, 2009 Prepared by: A* 7 _ //

- A Arerso*- pal Engineer Analyst Corporate Engineering rograms Reviewed by:_

Carl L Fýiant -,ýpervisor, Engin ring Corporate Engineering Programs Approved by: 7/,

_0 .

William J, Cam bellr-'-eneral Super*,or Corporate Engineering Programs Reviewed by:. _ _

Fra A. Klepacki -Site ISI Progrrm Implermenter- RE Ginna , 1 Approved by: 12 _

Jay 11 General Supervisor - Engineering Programs Unit - R E Ginna

R. E. Ginna Nuclear Power Plant, Unit 1 C EN G *

  • Fourth Inservice Inspecti.on Interval 2009 OWNERS ACTIVITY. REPORT Rev. 00 Date: 12109/2009

.O t.O.*-t-, eD,,F,, NR INS.ERVIC E EAMIATINSage-of-FOR E.EXAMINATIONS IDage 12/09/2 ff, y. ,*.*,.r . ... . . . Page i -2.of i- 8 TABLE OF CONTENTS T a ble of C o ntents ................................................................-....................... ......... . .. i-2 A bstract ........................ .......................................... ........................ i-3 Form OAR-I Owner's Activity Report for Inservice Inspection Plan ............................ 4 Form OAR-i Owner's Activity Report forContainment Inservice .lnspection.Plan .... . ............... i-5 Table 1 Items with Flaws or RelevantConditions that Require Evaluation forContinued Service ..... i-6 Table 2 Abstractof RepairlReplacement Activities Required~for Continued Service. .. ........ i-7

R. E. Ginna Nuclear Power Plant, Unit I DEN G Fourth Inservice Inspection Interval 2009 OWNER'S ACTIVITY REPORT Rev. 00 a joint venture of FOR Date: 12/09/2009 O ErKI1 *,ýeDF INSERVICE EXAMINATIONS IPage i-3of i-8 ABSTRACT This Owner's Activity Report summarizes the results of the R. E. Ginna Nuclear Power Plant (GNPP), Unit 1, American Society of Mechanical Engineers (ASME)Section XI Inservice Inspection Examinations performed during the 2009 Refueling Outage, from September 13, 2009 through October 4, 2009. No Inservice Inspection Examinations were performed on the Containment Inservice Inspection program since all required interval examinations were performed in the 2008 RFO. The First Interval Containment Inservice Inspection Program was extended to align the ISI Program and the Containment ISI Program to a common interval in accordance with Relief Request Number 22.

As an alternate to the requirements of the ASME, Boiler and Pressure Vessel Code (B&PVC), Section Xl, Article IWA-6000, GNPP is implementing ASME Code Case N-532-4, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000, Section Xl, Division 1". Regulatory Guide 1.147, Revision 15, approved ASME Code Case N-532-4 for use. This Report complies with the requirements of Code Case N-532-4.

This OAR Report closes out the Fourth Ten-Year Inservice Inspection Interval and the First Containment Inspection Interval.

OWNER'S ACTIVITY REPORTS - FORM OAR-1 Owner's Activity Reports Form OAR-I's were prepared and certified upon completion of the GNPP Unit 1, 2009 refueling outage examination activity in accordance with the following inspection plans and schedules:

  • Inservice Inspection Program Plan(s) for the Fourth Inspection Interval for GNPP Unit 1
  • Long Term Plan for GNPP, Unit 1
  • ISI Program Plan ASME XI, IWE/IWL First Inspection Interval In addition to the Owner's Activity Report, Form OAR-i, the following Tables are also included:
a. Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 1, provides a listing of item(s) with inservice flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300).
b. Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 2, identifies those items containing flaws or relevant conditions that exceeded the ASME Section XI acceptance criteria (IWX-3000) or in the case of supports IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement or corrective measure, may not have resulted from an examination or test required by Section XI, and provides such information as Code Class, whether the item is a repair, replacement or corrective action, item description, description of work, if the flaw or relevant condition was found during a scheduled Section XI Examination or test, date completed and the repair replacement plan number.

R. E. Ginna Nuclear Power Plant, Unit I CENG N *DE Fourth Inservice Inspection Interval Rev. 00.

2009 OWNER'S ACTIVITY REPORT n nn FOR Date: 1210912009 0 * ...

, I-AkDF -*" INSERVICE EXAMINATIONSP Rag ,e i - 4of i- 8 FORM OAR-1 OWNER'S.ACTIVITYREPORT As required by the :provisions of the ASME Code Case N-532-4 Report Number GNPP-OAR-ISI-2009 Plant R. E. Ginna Nuclear Power Plant, 1503 Lake-Road, Ontario, New York 14519 (Na'me'and Address of Plant)

Unit No. 1 Commercial Service-Date June 1. 1970 Refueling Outage Number RFtO-34 Current lnspection.lntenial Fourth Inservice Inspection Interval - January 1. 2000 to December 31, 2009.

(1st, 2nd, 3rd I4th, Other)

Current Inspection Period Thiirdlnservice Ihspection.Peri6d -. January 1. 2007 to December 31,2009 (1s!,.2nd, 3rd)

Edition and Addenda of SectionXIlapplicable to the"Inspection Plan 1995 Edition, 1996 Addenda Date and Revision of Inspection Plan 30 June 2009; Revision 10 Edition and Addenda of ASME Section XI applicable to repairs/replacements, if different than the Inspection Plan N/A Code Cases used: N-663 N-307-3. N-706, N-460, N-4984*, N-532-4 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting completion of 2009 RFO (RFO-34) conform to the requirements of Section XI.

Certificate of Authorization No. NIA Expiration Date N/A Signe 4 / i (If applicable)

Date /1- /

(General Supe sor- Corp0date Fleet Engineering Programs Group)

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by Hartford Steam Boiler (HSBCT) . of Hartford, Connecticut have inspected the items described in this Owner's Activity. Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this'report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or operty damage or a loss of any kind arising from or connected with this inspection.

Bruce Sawyer '1'JA/ . . /* 4 Commissions NB'10496, A, N. I: New York 4077 Inspector's Signature National Board, State, Province, and Endorsements Date /0.1 o/ ef

R. E. Ginna Nuclear Power Plant, Unit I C EN a jointy o G Fourth Inservice Inspection Interval 2009 OWNER'S ACTIVITY REPORT FOR Rev. 00 Date: 1210912009 0 '-ei INSERVICE EXAMINATIONS Page i -5 .of i -8 FORM OAR-I OWNERS ACTIVITY REPORT As required by the provisions of theASME Code Case N-532-4 Report Number GNPP-OAR-IWEIL-2009 Plant Rr.E Ginna Nuclear Power Plant, 1503 Lake Road, Ontarioý New York 14519 (Nare and Address of Plant)

Unit No. 1 Commercial Service Date. June 11970 Refueling Outage Number RFO&34.

Current Inspection Interval First Containment Inspection Interval'- September 9,1996to September 8, 2008 (1st, 2nd, 3rd, 4th Other)

Current .Inspection Period Third Inserviceinspection: Period - September:10, 2005-to September 8. 2008 (1st,:2nd- 3r~d),

Edition and Addenda of Section Xi applicable to the Inspection Plans. 1992:Edition, 1992 Addenda Date and&Revision of Inspection Plans 30.June 2009, Revision 10 Edition and Addenda of ASME.Section X1 applicable~to repairs/replacements, if different than. the Inspection Plan N/A Code Cases used: N-532-4 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct: (b):the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacementactivities and evaluations supporting completion of 2009 RFO (RFO-34) conform to the requirements of Section Xl.

Certificate of Authorization No.- N/A Expiration Date N/A 21,pplicable) if Signed Date ' r (General Su-pervisorZorporate Fdet Engineering Programs Group)

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by Hartford Steam Boiler (HSBCT) of Hartford. Connecticut have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any persy Iat injury or prop y damage or a loss of any kind arising from or connected with this inspection.

Bruce Sawyer )4JjAA..-

4 Commissions NB1 0496. A. N, I:New York 4077 Inspector's Signature National Board, State, Province, and Endorsements Date_ _ _ a_ _ _/_/0_

R. E. Ginna Nuclear Power Plant, Unit I C ENG zip vamu

.*r.c Fourth Inservice Inspection Interval

~2009 OWNER'S ACTIVITY REPORT"

" ..FOR ...

Rev. 00 Date: 12/0912009 t -*eDF INSERVICE EXAMINATIONS EXAMINATIONS Page i-6 of i-8 TABLE I ITEMS WITH FLAWS OR RELEVANTCONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE As required by the provisions0of the ASME Code Case N-532-4 EXAMINATION ITEM EVALUATION DESCCRIPTION CATEGORY AND iTEM NUMBER DESCRIPTION "

Spring Can setting did not conform to Actual setting acceptable per Engineering (CR-F-A, Fl.30A drawing setting requirements, 2009-006345), drawing to be revised,

R. E. Ginna Nuclear PowerPlant, Unit I Q ENG

  • Fourth Inservice Inspection Interval 2009 OWNER'S ACTIVITY REPORT Rev. 00 110 toVEt IA FOR Date: 12/0912009 V . gv INSERVICE EXAMINATIONS Page i- 7 :o~f i -8 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE As required by the provisions ofthe ASME Gode:Case N-5324, S

CODE ITEM DESCRIPTION DATE REPAIR/REPLACEMENT

-CLASS DESCRIPTION OF WORK COMPLETED PLAN NUMBER 2 SWU-308, Mechanical Snubber Functional Test failure September GORR 34-081 Snubber RSA-10 - Replaced Mechanical.Snubber 2009 on .component support SWU- (WO90655427) 308.

2 MSU-57, Mechanical Snubber Functional Test~failure September GORR 34-036 Snubber..PSA-3 - Replaced Mechanical 2009 O C20802545)

Snubber on component support (W MSU-57 2 MSU-18 South, Snubber Functional Test failure September GORR 34-078 Mechanical: Snubber - Replaced Mechanical 2009 PSA-35 Snubber MSU-1 8 South on (WO C20801173) component support MSU-18.

2 Main Steam Header Repair by Welding eroded area September GORR 34-076, Rev 1 East End Cap 2009 (WO 090644633)

R. E.-Ginna Nuclear Power Plant, Unit 1 0E \(- Fourth !nservice Inspection Interval Rev. 00 2009 OWNER'S ACTIVITY REPORT

' FOR Date: 1210912009 En"ng .eDF INSERVICE EXAMINATIONS Page i -8 of i-8

, Pag -8, of-.

END OF INSERVICE INSPECTION OWNER'S ACTIVITY REPORT FOR 2009 REFUELING OUTAGE (RFO-34)