ML111730225

From kanterella
Revision as of 21:16, 10 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Response to Regulatory Issue Summary (RIS) 2011-04
ML111730225
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/20/2011
From: Bauder D
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2011-04
Download: ML111730225 (2)


Text

.....

SOUTHERN CALIFORNIA Douglas R. Bauder EDISON Site Vice President & Station Manager San Onofre Nuclear Generating Station An EDISON INTERNATIONAL Company 10 CFR 55.40 June 20, 2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-361 and 50-362 Response to Regulatory Issue Summary (RIS) 2011-04 San Onofre Nuclear Generating Station, Units 2 and 3

Reference:

RIS 2011 -04, "Preparation and Scheduling of Operator Licensing Examinations, " dated May 25, 2011 Gentlemen:

This letter provides the Southern California Edison (SCE) response to U. S. Nuclear Regulatory Commission Regulatory Issue Summary 2011 -04 , "Preparation and Scheduling of Operator Licensing Examinations ," dated May 25 , 2011.

The schedule shown on NRC Form 536 , "Ope rator Licensing Examination Data ," is enclosed and provides SCE 's best estimate to meet our operator licensing needs through calendar year 2016.

If you have any questions, please feel free to contact me or Mr. Ryan Treadway at (949) 368-9985.

Sincerely,

Enclosure:

As Stated cc: E. E. Collins, Regional Administrator, NRC Region IV Mark S. Haire , Chief, Operations Branch , NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warnkk, NRC Sen ior Resident Inspector, San Onofre Units 2 and 3 P.O. Box 128 San Clemente, CA 92672 (949) 368-9275 PAX 892 75 Fax: (949) 368-9881 Doug .Bauder@sce.com

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISS ION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10 /31 /2011 (10-2008)

Est imate d burden per response to com ply with this voluntary informatio n collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIAlP rivacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@ nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may no t co nduc t or spo nsor, and a person is not re quired to re spond to, the information collection.

FACILITY NRC REGION San Onofre Nuclear Generating Station, Units 2 and 3 Region IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 Cy 2014 Cy 2015 Cy 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATION S ESTIMATED NUMBER OF NRC-PREPAR ED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 Cy2014 CY 2015 CY 2016 NUMBER OF REACTOR 10 0 10 . 10 OPERATORS NUMBER OF SENIOR REACTOR 5 0 5 5 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 5 0 5 5 OPERATORS -UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATO RS - LIMITED PROPOSED DATES PRIMARY DATE 10/2112013 N/A 10/1912015 10/1712016 ALTERNATE DATE 11/0412013 N/A 11/02/2015 10/3112016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED --- ---

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 20 20 CANDIDATES NRC FORM 536 (10-2008) PRINTEDONRECYCLED PAPER