Interim Deficiency Rept Re Safety Injection Tanks & Reactor Pump Supports,Initially Reported 820127.Interpretation of Radiographic Indications Found in Three Weld Areas Not Resolved.Final Rept Due by 820531
ML20050K701
Person / Time
Site: Satsop
Issue date: 04/01/1982
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, G3-82-320, GO3-82-320, NUDOCS 8204140229
Download: ML20050K701 (1)


Text

-

, Docket Nos. 50-508/509 e.,

'p* $0.55(e) Report Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428 Docket Numbers 50-508 and 50-509 April 1, 1982 G03-82-320

,/ 8 <iT

,~ K: , .

U. S. Nuclear Regulatory Commission, Region V Office of Inspection and Enforcement j(( h' 1450 Maria Lane, Suite 260 UJ:'

' 2_o Walnut Creek, California 94596-5368 - ,-

gg%. .t.

n.'\hg p. ~

Attention: Mr. T. W. Bishop Chief, Reactor Construction Projects Branch p%( *

Subject:

s g b, PROJECT NOS. 3 AND 5 INTERIM REPORT OF POTENTIAL 10CFR50.55(e) is l M RT INDICATIONS ON SAFETY INJECTION TANKS AND REACTOR PUMP SUPPORTS (D/N #023)

Reference:

Letter, G03-82-085, dated January 27, 1982, R. S.

Leddick to B. H. Faulkenberry, same subject.

The referenced letter forwarded an interim report of the subject condi-tion and noted that the next interim report would be provided to your office by April 1, 1982.

Interpretation of radiographic indications found in three weld areas (two in Safety Injection Tank #1 and one in Tank #2) has not been re-solved. In an effort to provide a resolution, Combustion Engineering (CE) has agreed to furnish documentation that will justify their inter-pretation. A final report for the subject condition will be forwarded to your office upon receipt and evaluation of CE's interpretation. It

  • is anticipated that this action will be completed by May 1982. Accord-ingly, the final report will be submitted by May 31, 1982.

Should you have any questions or desire further information, please contact me directly.

c R. S. Leddick, 760 m Program Director, WNP-3 TG DRC/tt  :

3 cc: J. Adams - NESCO h nR D. Smithpeter - BPA 9 H]!S Ebasco - New York g WNP-3/5 Files - Richland ,;

lE# O B204140229 820401 DR ADOCK 0500G508 # /