Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 271-8290 for Question 19-15 (Rev. 5)
ML18218A209
Person / Time
Site: 05200046
Issue date: 08/06/2018
From: Yeon Kim
Korea Hydro & Nuclear Power Co, Ltd
To: William Ward
Document Control Desk, Office of New Reactors
Shared Package
ML18218A206 List:
References
KAW-18-0102, MKD/NW-18-0102L
Download: ML18218A209 (6)


Text

70-1312-gil, Yuseong-daero, Yuseong-gu, Daejeon, 34101, KOREA Tel: +82-42-870-5400 / Fax: +82-42-870-5449 http://www.khnp.co.kr August 6, 2018 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention: Mr. William Ward Docket No.52-046 Division of New Reactor Licensing MKD/NW-18-0102L

Subject:

Revised Response to RAI 271-8290 for Question 19-15 (Rev.5)

References:

1) NRC Request for Additional Information 271-8290, dated October 22, 2015
2) KHNP Letter MKD/NW-16-0243L, Response to RAI 271-8290, dated March 17, 2016
3) KHNP Letter MKD/NW-16-1151L, Revised Response to RAI 271-8290, dated December 9, 2016
4) KHNP Letter MKD/NW-17-0238L, Revised Response to RAI 271-8290 for the Question 19-15 (Rev.2), dated September 1, 2017
5) KHNP Letter MKD/NW-17-0325L, Revised Response to RAI 271-8290 for the Question 19-15 (Rev.3), dated October 17, 2017
6) KHNP Letter MKD/NW-17-0353L, Revised Response to RAI 271-8290 for Question 19-15 (Rev.4), dated November 9, 2017 KHNP is hereby submitting the response to RAI 271-8290, dated October 22, 2015. The revised response addresses Question 19-15 related to the operating software CCF and application software CCF. The above CCF values are provided in Reference 65, and this document will be submitted separately. Enclosure 1 contains a copy of the associated affidavit. Enclosure 2 provides the revised response to RAI 271-8290 for Question 19-15 (Rev.5) (Proprietary). provides the revised response to RAI 271-8290 for Question 19-15 (Rev.5) (Non-Proprietary).

If additional information or clarification is required, please contact Daegeun Ahn, General Manager of KHNP Washington DC Center at ahn.daegeun@khnp.co.kr or 703-388-0592.

Sincerely, Yun-ho Kim Project Manager Advanced Reactors Development Laboratory Korea Hydro & Nuclear Power Co., Ltd.

Enclosures:

1. Affidavit KAW-18-0102
2. Revised Response to RAI 271-8290 for Question 19-15 (Rev.5) (Proprietary)
3. Revised Response to RAI 271-8290 for Question 19-15 (Rev.5) (Non-Proprietary)

Enclosure 1 Affidavit KAW-18-0102 I, Jeong-kwan Suh, state the following:

1. I am the General Manager of Korea Hydro & Nuclear Power Co., Ltd. (KHNP), and as such I am authorized to request withholding the information transmitted with this letter from public disclosure and to execute this affidavit.
2. I am familiar with the criteria applied by KHNP to determine whether certain information is proprietary, and with the policies established by KHNP to ensure the proper application of these criteria.
3. The information, Revised Response to RAI 271-8290 for Question 19-15 (Rev.5)

(Proprietary), transmitted with this letter has been classified by KHNP as proprietary in accordance with the policies for the control and protection of proprietary and confidential information. The information regarded as proprietary is identified and marked consistent with the requirements of 10 CFR 2.390, § (b)(1)(i). Accordingly, the proprietary information is enclosed within brackets and the right-hand bracket carries a notation of TS to indicate that the trade secret nature of the information claimed to be proprietary is the basis for proposing that the information so identified be withheld from public disclosure.

4. Pursuant to the considerations set forth in 10 CFR Section 2.390(a), KHNP considers the information classified as proprietary to be trade secret information since it is design, analysis, or test information that would be difficult for a competitor to reproduce and hence provides an economic and competitive advantage to KHNP.
5. The need for designating the information as proprietary has been raised within KHNP.

The information is being treated proprietary and confidential and has not been disclosed by KHNP to the public.

6. Nondisclosure of the proprietary information transmitted with this letter is vital to the competitiveness held by KHNP and, hence, disclosure of the proprietary information transmitted in with this letter would have negative commercial impacts on the competitive position of KHNP in the U.S. nuclear market.
7. In accordance with KHNP policy, proprietary information contained in this document may be, or may have been, made available on a limited basis to regulatory bodies, customers, potential customers, and their agents, suppliers, and licensees, and others under suitable agreements providing for nondisclosure and limited use of the information.

I declare that the foregoing statements are true and correct to the best of my knowledge, information and belief.

Executed on August 1, 2018.

Jeong-kwan Suh General Manager APR1400 Licensing Team Korea Hydro and Nuclear Power Co., Ltd

Enclosure 2 Revised Response to RAI 271-8290 for Question 19-15 (Rev.5)

(Proprietary)

August 6, 2018

Enclosure 3 Revised Response to RAI 271-8290 for Question 19-15 (Rev.5)

(Non-Proprietary)

August 6, 2018