ML18274A403
| ML18274A403 | |
| Person / Time | |
|---|---|
| Site: | 05200046 |
| Issue date: | 09/28/2018 |
| From: | Yeon Kim Korea Hydro & Nuclear Power Co, Ltd |
| To: | Document Control Desk, Office of New Reactors |
| Shared Package | |
| ML18274A402 | List: |
| References | |
| MKD/NW-18-0129L | |
| Download: ML18274A403 (1) | |
Text
70-1312-gil, Yuseong-daero, Yuseong-gu, Daejeon, 34101, KOREA Tel: +82-42-870-5400 / Fax: +82-42-870-5449 http://www.khnp.co.kr September 28, 2018 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention: Mr. William Ward Docket No.52-046 Division of New Reactor Licensing MKD/NW-18-0129L
Subject:
Review Results to Final Safety Evaluation Report for Six Chapters
References:
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - FINAL SAFETY EVALUATION FOR SIX CHAPTERS, dated September 25, 2018 The purpose of this letter is to respond to the referenced NRC letter requesting KHNP to verify information provided in the APR1400 DCA - Final Safety Evaluation Report (FSER) for six chapters (1, 3, 9, 10, 15, and 19).
Please note that the FSER chapters provided do not contain any proprietary information beyond that previously acknowledged. KHNP has identified, however, a number of editorial and/or factual items that it would like to bring to your attention. Enclosures 1 through 4 provide markups of the APR1400 DCA - FSER for Chapters 3, 9, 10, and 19, with proposed corrections.
KHNP has no comments or suggested changes with respect to the other chapters (1 and 15).
If additional information or clarification is required, please contact Daegeun Ahn, General Manager of KHNP Washington DC Center at ahn.daegeun@khnp.co.kr or 703-388-0592.
Sincerely, Yun-ho Kim Project Manager Advanced Reactors Development Laboratory Korea Hydro & Nuclear Power Co., Ltd.
Enclosures:
- 1. Markup of the APR1400 Chapter 3 - FSER
- 2. Markup of the APR1400 Chapter 9 - FSER
- 3. Markup of the APR1400 Chapter 10 - FSER
- 4. Markup of the APR1400 Chapter 19 - FSER