ML18240A042
| ML18240A042 | |
| Person / Time | |
|---|---|
| Site: | 05200046 |
| Issue date: | 08/28/2018 |
| From: | Yeon Kim Korea Hydro & Nuclear Power Co, Ltd |
| To: | William Ward Document Control Desk, Office of New Reactors |
| References | |
| MKD/NW-18-0126L | |
| Download: ML18240A042 (1) | |
Text
70-1312-gil, Yuseong-daero, Yuseong-gu, Daejeon, 34101, KOREA Tel: +82-42-870-5400 / Fax: +82-42-870-5449 http://www.khnp.co.kr August 28, 2018 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention: Mr. William Ward Docket No.52-046 Division of New Reactor Licensing MKD/NW-18-0126L
Subject:
Submittal of Confirmation of Final Safety Evaluation for the APR1400 Generic Report, PTLM for RCS Heatup and Cooldown
References:
FINAL SAFETY EVALUATION FOR THE ADVANCED POWER REACTOR 1400 GENERIC REPORT, PRESSURE-TEMPERATURE LIMITS METHODOLOGY FOR RCS HEATUP AND COOLDOWN, dated August 23, 2018 The purpose of this letter is to confirm that the safety evaluation report for the APR1400 generic report, Pressure-Temperature Limits Methodology (PTLM) for RCS heat up and Cooldown does not contain any proprietary information or factual errors.
If additional information or clarification is required, please contact Daegeun Ahn, General Manager of KHNP Washington DC Center at ahn.daegeun@khnp.co.kr or 703-388-0592.
Sincerely, Yun-ho Kim Project Manager Advanced Reactors Development Laboratory Korea Hydro & Nuclear Power Co., Ltd.