ML18218A204

From kanterella
Jump to navigation Jump to search
Korea Hydro & Nuclear Power Co, Ltd., Revised Response to RAI 312-8343 for Question 19-16 (Rev. 3)
ML18218A204
Person / Time
Site: 05200046
Issue date: 08/06/2018
From: Yeon Kim
Korea Hydro & Nuclear Power Co, Ltd
To: William Ward
Office of New Reactors
Shared Package
ML18218A201 List:
References
KAW-18-0097, MKD/NW-18-0097L
Download: ML18218A204 (6)


Text

70-1312-gil, Yuseong-daero, Yuseong-gu, Daejeon, 34101, KOREA Tel: +82-42-870-5740 / Fax: +82-42-870-5779 http://www.khnp.co.kr August 6, 2018 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention: Mr. William Ward Docket No.52-046 Division of New Reactor Licensing MKD/NW-18-0097L

Subject:

Revised Response to RAI 312-8343 for Question 19-16 (Rev.3)

References:

1) NRC Request for Additional Information 312-8343, dated November 16, 2015
2) KHNP Letter MKD/NW-16-0824L, Response to RAI 312-8343 for Question 19-16, dated July 29, 2016
3) KHNP Letter MKD/NW-17-0014L, Revised Response to RAI 312-8343 for Question 19-16, dated January 13, 2017
4) KHNP Letter MKD/NW-17-0021L, Revised Response to RAI 312-8343 for Question 19-16 (Rev.2), dated January 20, 2017
5) KHNP Letter MKD/NW-17-0107L, Submittal of an Additional Technical Report for APR1400, dated May 8, 2017 KHNP is hereby submitting the response to RAI 312-8343, dated November 16, 2015. The revised response addresses Question 19-16 relating to the RCP seal LOCA probability. contains a copy of the associated affidavit. Enclosure 2 provides the revised response to RAI 312-8343 for Question 19-16 (Rev.3) (Proprietary). Enclosure 3 provides the revised response to RAI 312-8343 for Question 19-16 (Rev.3) (Non-Proprietary). Also, please note that Reference 64 referred to in Enclosures 1 and 2 had been submitted to the NRC by Reference 5.

If additional information or clarification is required, please contact Daegeun Ahn, Director of KHNP Washington DC Center at ahn.daegeun@khnp.co.kr or 703-388-0592.

Sincerely, Yun-ho Kim Project Manager Advanced Reactors Development Laboratory Korea Hydro & Nuclear Power Co., Ltd.

Enclosures:

1. Affidavit KAW-18-0097
2. Revised Response to RAI 312-8343 for Question 19-16 (Rev.3) (Proprietary)
3. Revised Response to RAI 312-8343 for Question 19-16 (Rev.3) (Non-Proprietary)

Enclosure 1 Affidavit KAW-18-0097 I, Jeong-kwan Suh, state the following:

1. I am the General Manager of Korea Hydro & Nuclear Power Co., Ltd. (KHNP), and as such I am authorized to request withholding the information transmitted with this letter from public disclosure and to execute this affidavit.
2. I am familiar with the criteria applied by KHNP to determine whether certain information is proprietary, and with the policies established by KHNP to ensure the proper application of these criteria.
3. The information, Revised Response to RAI 312-8343 for Question 19-16 (Rev.3)

(Proprietary), transmitted with this letter has been classified by KHNP as proprietary in accordance with the policies for the control and protection of proprietary and confidential information. The information regarded as proprietary is identified and marked consistent with the requirements of 10 CFR 2.390, § (b)(1)(i). Accordingly, the proprietary information is enclosed within brackets and the right-hand bracket carries a notation of TS to indicate that the trade secret nature of the information claimed to be proprietary is the basis for proposing that the information so identified be withheld from public disclosure.

4. Pursuant to the considerations set forth in 10 CFR Section 2.390(a), KHNP considers the information classified as proprietary to be trade secret information since it is design, analysis, or test information that would be difficult for a competitor to reproduce and hence provides an economic and competitive advantage to KHNP.
5. The need for designating the information as proprietary has been raised within KHNP.

The information is being treated proprietary and confidential and has not been disclosed by KHNP to the public.

6. Nondisclosure of the proprietary information transmitted with this letter is vital to the competitiveness held by KHNP and, hence, disclosure of the proprietary information transmitted in with this letter would have negative commercial impacts on the competitive position of KHNP in the U.S. nuclear market.
7. In accordance with KHNP policy, proprietary information contained in this document may be, or may have been, made available on a limited basis to regulatory bodies, customers, potential customers, and their agents, suppliers, and licensees, and others under suitable agreements providing for nondisclosure and limited use of the information.

I declare that the foregoing statements are true and correct to the best of my knowledge, information and belief.

Executed on August 1, 2018.

Jeong-kwan Suh General Manager APR1400 Licensing Team Central Research Institute Korea Hydro and Nuclear Power Co., Ltd

Enclosure 2 Revised Response to RAI 312-8343 for Question 19-16 (Rev.3)

(Proprietary)

August 6, 2018

Enclosure 3 Revised Response to RAI 312-8343 for Question 19-16 (Rev.3)

(Non-Proprietary)

August 6, 2018