2015 Perry Nuclear Power Plant Initial License Examination Miscellaneous Correspondence
ML15114A476
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 02/02/2015
From: Walton R
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML15105a547 List:
References
Download: ML15114A476 (13)


Text

2015 PERRY NUCLEAR POWER PLANT INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINIOIS 60532-4352 January 29, 2015 Mr. Ernest Harkness Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. 0. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Harkness:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Perry Nuclear Power Plant.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Richard Strohl, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 9, Supplement 1 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," during the week of February 16, 2015.

The NRC staff will administer the operating tests during the weeks of February 2 and 9, 2015.

This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing the operators at your facility, do not administer the examination and contact me at 630-829-9707.

Please contact your Chief Examiner, Mr. Raymond Walton, at 630-829-9836, if you have any questions or identify any errors or changes in the license level reactor operator (RO) or senior reactor operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document

E. Harkness Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

_Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

~

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440

. cc: Distribution via LISTSERVD R. Strohl, Training Manager

E. Harkness Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via LISTSERv R. Strohl, Training Manager DISTRIBUTION:

Kimyata MorganButler RidsNrrPMPerry Resource RidsNrrDorllpl3-2 Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Eric Duncan Allan Barker Carole Ariano Linda Linn DRPlll DRSlll Jim Clay Carmen Olteanu Scott Sloan DOCUMENT NAME: Ltr 01xx15 Perry OL Exam Approval.docx IZI Publicly Available D Non-Publicly AvailableD Sensitive [gl Non-Sensitive To receive a co of this document, Indicate In the concurrence box "C" = C without aitch/encl "E" = Co with attach/encl "N" = No co OFFICE Rlll:DRS Rlll:DRS NAME DATE OFFICIAL RECORD COPY

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 1, 2011 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. 0. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

PERRY NUCLEAR POWER PLANT

Dear Mr. Bezilla:

In response to your letters dated July 8, 2010 (L-10-210), and July 22, 2010 (L-10-218) you requested dates for initial operator licensing examinations in 2013 and 2015. You also requested we cancel the initial operator license exam scheduled for January 9, 2012.

In response, we have scheduled an examination for the weeks of February 18 and 25, 2013, with an onsite validation date of January 28, 2013. This is a change from our letter to you dated July 30, 2010. Additionally, we have scheduled an examination for the weeks of February 9 and 16, 2015, with an onsite validation date of January 12, 2015. We have also canceled the initial operator license examination scheduled for January 9, 2012.

In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations. Please inform us at your earliest opportunity if you discover you need to change the scheduled examination date.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to review and conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.

In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document

M. Bezilla Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA by D. McNeil for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via ListServ

M. Bezilla Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA by D. McNeil for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via ListServ DISTRIBUTION:

Daniel Merzke RidsNrrPMPerry RidsNrrDorllpl3-2 RidsNrrDirslrib Resource Steven West Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPlll DRSlll Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRSlll\DRS\Work in Progress\OL Exam Confirmation Letters\PER 060111 DRS OL Exam Confirmation.docx D Publicly Available D Non-Publicly AvailableD Sensitive D Non-Sensitive To receive a copy of this document, Indicate In the concurrence box "C" =Copy without attach/encl "E" =Copy with attach/encl "N" =No copy OFFICE Riii I Riii I I I NAME RKWalton:co HPeterson OM for DATE 05/13/2011 06/01/2011 OFFICIAL RECORD COPY

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 30, 2010 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. 0. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

PERRY NUCLEAR POWER PLANT

Dear Mr. Bezilla:

In response to your letters dated July 8, 2010 (L-10-210), and July 22, 2010 (L-10-218) you requested dates for initial operator licensing examinations in 2013 and 2015. You also requested we cancel the initial operator license exam scheduled for January 9, 2012.

In response, we have scheduled an examination for the weeks of February 11 and 18, 2013, with an onsite validation date of January 7, 2013. Additionally, we have scheduled an examination for the weeks of February 9 and 16, 2015, with an onsite validation date of January 12, 2015. We have also canceled the initial operator license examination scheduled for January 9, 2012.

In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually accepta~le date.

We understand that your staff will develop the examinations. Please inform us at your earliest opportunity if you discover you need to change the scheduled examination date.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to review and conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.

M. Bezilla In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via ListServ

M. Bezilla In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via ListServ DISTRIBUTION:

Susan Bagley RidsNrrPMPerry RidsNrrDorllpl3-2 RidsNrrDirslrib Resource Steven Reynolds Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPlll DRSlll Patricia Buckley Tammy Tomczak Document Name: R:\Ltrs to licensees\FirstEnergy (FENOC) - Davi-Perr\PERR\PER 201 O\PER 073010 DRS OL Re Confirmation of License Exam.docx o Publicly Available o Non-Publicly Available o Sensitive o Non-Sensitive To receive a coov of this document. indicate in the box: "C" =Coov without attachmenUenclosure "E" =Coov with attachmenUenclosure "N" =No coov OFFICE Riii I Riii IN l I NAME RKWalton:co HPeterson DATE 07/20/10 07/30/10 OFFICIAL RECORD COPY

FENOC Perry Nuclear Power Station 10 Center Road RrstEnergy Nuclear Operating Company Perry, Ohio 44081 Mart< B. BezlHa 440-280-5382 Vice President Fax: 440-280-8029 July 8, 2010 L-10-210 ATTN: Mr. Hironori Peterson U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Scheduling of NRC Operator License Examinations The purpose of this letter is to request an initial operator license examination be administered the weeks of February 11 and 18, 2013, at the Perry Nuclear Power Plant.*

If you are unable to support an examination at that time, it is requested an examination be scheduled at the next, earliest opportunity. A second initial operator license examination is requested for NRC administration in February 2015. The license class for these examinations is expected to contain both Senior Reactor Operator and Reactor Operator (SRO/RO) candidates. Please contact us at your earliest convenience regarding whether the NRC can support this schedule request.

The examination scheduled to begin January 9, 2012, is no longer needed and may be deleted from the NRC's examination schedule for licensees.

If there are any questions, or if additional information is required, please contact Mr. Anthony Mueller Jr., Manager, Perry Training Section, at (440) 280-5535.

Sincerely,

~~/- M.~mffe Mark B. Bezilla cc: Ms. Janet Kweiser, Operator Licensing Section, NRC Region Ill Mr. Dell McNeil, Operator Licensing Section, NRC Region Ill NRC Project Manager NRC Resident Inspector NRG Document Control Desk JUL 1 5 2010

FENOC . '"*---. Perry l\Jcciear Povver S:ation 1O Center F!oao FirstEnergy /111.xlear Operatmg Company Perr'/ Ohio ,14081 Mark B. Bezilla 440-280-5~'82 I/ice Pres:dent Fax. 440-280-8029 July 22, 2010 L-10-218 10 CFR 55 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Voluntary Response to NRC Regulatory Issue Summary 2010-08 Preparation and Scheduling of Operator Licensing Examinations As requested in NRC Regulatory Issue Summary, 2010-08, Preparation and Scheduling of Operator Licensing Examinations, enclosed is the voluntary response concerning the estimated number of candidates to be examined during scheduled examination visits.

The proposed Operator Licensing Examination Schedule data, on the enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for fiscal years 2012 through 2015.

There are no regulatory commitments contained in this letter or its enclosure. If there are any questions concerning this matter, please contact Mr. Anthony E. Mueller Jr.,

Manager, Perry Training Section at (440) 280-5535.

Sincerely,

/!

/

~

. /

<J-.*t../

/

I I

Enclosure:

/

OPERATOR LICENSING EXAMINATION DATA, NRC Form S36 cc: Regional Administrator, NRC Region Ill NRC Resident Inspector Office NRC Project Manager Hironori Peterson, NRC Region Ill JUL 2 8 2010

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS NO 3150-J 131 EXPIRES. 1013112011

\ ~C-2008)

Est:ITlated curGer. per respor:se to ::c1""0ply 'N1th tr.is vc:u;itar1 !nformat*cn col!ecticn request* I hour TillS 1nformat1on collection 1s used to plan budgets and resources for opera~cr e:<am:nauons_ Ser.d .::Jrnrnents regar.J1r.g bur:'er.

estimate :o the R;,ccrds and FOIAiPrivacy Services Branch \T-5 F53), U.S OPERATOR LICENSING Nuclear Regulatory Commission. Washington, DC 2C555-CC01 or by !nter~et e-mail to 1nfccc:lects@nrcBcv, anc to the Cesk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs. NE 8-10202, (3150-0131). Office of Management and Budget. Washington. DC 20503 If a rne3ns used to 1m~ose an 1nfcrmat1cn collect1on does net display a currently vaild OMS control number, the NRC may net conduct or spcnsor. and a person 1s not required tc respond to the information collection F.~CILITY NRC REGION PERRY NLTLEAR POWER PLA."iT III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 NUMBER OF REACTOR 0 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR 4 0 4 0

OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DA TES PRIMARY DATE 02/11/2013 02/09/2015 AL TERNA TE DA TE 02/18/2013 02/16/2015

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED --- ---

NUMBER MARCH JUNE SEPTEMBER DECEMBER l\ilARCH JUNE SEPTEMBER DECEMBER ESTIMATED NU1\lBER IJF ' IO CANDIDA.TES PRINTED ON RECYCLED PAPER