L-10-218, Voluntary Response to NRC Regulatory Issue Summary 2010-08 Preparation and Scheduling of Operator Licensing Examinations

From kanterella
(Redirected from L-10-218)
Jump to navigation Jump to search
Voluntary Response to NRC Regulatory Issue Summary 2010-08 Preparation and Scheduling of Operator Licensing Examinations
ML102100190
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/22/2010
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-10-218
Download: ML102100190 (2)


Text

-FENOC Perry Nuclear Power Station 10 Center Road FirstEnergyNuclear OperatingCompany Perry,Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President Fax: 440-280-8029 July 22, 2010 L-10-218 10 CFR 55 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Voluntary Response to NRC Regulatory Issue Summary 2010-08 Preparation and Scheduling of Operator Licensing Examinations As requested in NRC Regulatory Issue Summary, 2010-08, Preparation and Scheduling of Operator Licensing Examinations, enclosed is the voluntary response concerning the estimated number of candidates to be examined during scheduled examination visits.

The proposed Operator Licensing Examination Schedule data, on the enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for fiscal years 2012 through 2015.

There are no regulatory commitments contained in this letter or its enclosure. If there are any questions concerning this matter, please contact Mr. Anthony E. Mueller Jr.,

Manager, Perry Training Section at (440) 280-5535.

Sincerely,

/ /x

Enclosure:

OPERATOR LICENSING EXAMINATION DATA, NRC Form 536 cc: Regional Administrator, NRC Region III NRC Resident Inspector Office NRC Project Manager Hironori Peterson, NRC Region Ill

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION PERRY NUCLEAR POWER PLANT IlI A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 Cy 2013 Cy 2014 Cy 2015 ESTIMATED.NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS 20 PROPOSED NUMBER CY 2012 Cy 20 3 1 Cy 201 4 CY 15 NUMBER OF REACTOR 0 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 4 0 4 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 02/11/2013 02/09/2015 ALTERNATE DATE 02/18/2013 02/16/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 CANDI DATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER