MONTHYEARML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 ML18102B6081997-10-0606 October 1997 Proposed Tech Specs Revising LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys. ML18102B5571997-08-27027 August 1997 Proposed Tech Specs,Providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, Which States That Three CCW Pumps Required to Meet LCO ML18102B5301997-08-19019 August 1997 Proposed Tech Specs,Providing Addl Operational Flexibility to Allow Orderly Resumption of Startup & Preclude Unwarranted Power Transients at Salem Unit 2 ML18102B5341997-08-18018 August 1997 Proposed Tech Specs,Incorporating Plant Computer (P-250) Into TS Bases for Movable Control Assemblies ML18102B4891997-08-0101 August 1997 Proposed Tech Specs Section 4.2.1 Rewording Section to State Util Will Adhere to Section 7,Incidental Take Statement Approved by Natl Maring Fisheries Svc ML18102B3911997-06-12012 June 1997 Proposed Tech Specs,Representing Addition of New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B3061997-05-14014 May 1997 Proposed Tech Specs,Revising SR 4.7.6.1.d.1,to Indicate That Specified Acceptable Filter Dp Is to Be Measured Across Filter Housing & Reflecting Filter Dp Acceptance Value Greater than 2.70 Water Gauge ML18102B2631997-05-0101 May 1997 Proposed Tech Specs,Adding New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B2601997-05-0101 May 1997 Proposed Tech Specs 3/4.7.7 Revising Certain Allowed Outage Times & Creating 3/4.7.11 to Address Switchgear & Penetration Area Ventilation Sys ML18102B0341997-04-25025 April 1997 Proposed Tech Specs 3.5.2 Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 1999-08-25
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 1999-09-10
[Table view] |
Text
I---- --
ATTACHMENT B NLR-N94003 LCR 93-06 REACTOR TRIP SYSTEM SURVEILLANCE REQUIREMENTS REVISIONS SALEM GENERATING STATION UNIT 1 FACILITY OPERATING LICENSE DPR-70 DOCKET NO. 50-272 The following Technical Specifications have been revised (pen and ink) to reflect the proposed changes:
Technical Specification Table 4.3-1 3/4 3-11 Table 4.3-1 3/4 3-12 Table 4.3-1 3/4 3-13 Table 4.3-1 3/4 3-13a 94 :!. 0040060 94-0920 - ~\
PDR ADOCK 05000272 p PDR
TABLE 4.3-1 REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS c:
z
-t CHANNEL CHANNEL HODES IN WHICH FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION REQUIRED
- 2. Power Range, Neutron Flux s 0(2), M(J) 1,2 and Q(6)
- 3. Power Range, Neutron Flux, N.A. R(6) 1,2 High Positive Rate
- 4. Power Range, Neutron Flux, N.A. R(6) 1,2
~ High Negative Rate
-w I 5. Intermediate Range, Neutron Flux s R(6) S/U(l) 1,2 and *
- 6. Source Range, Neutron Flux S(7) R(6) Q and S/U(l) 2,3,4,5 and *
- 7. overtemperature 4T s R 1,2
- 8. overpower 4T s R 1,2
- 9. Pr***uriz*r Pre**uro--Low s R 1,2 r=
I= 10. Pr***urizer Pr***ure--High s R 1,2
,." 11. Pre**urizer Water Level--High s R 1,2
- 12. Lo** of Flow - Single Loop S R Q 1
TABLE 4.3-1 <<Continued)
REACTOR TRIP SYSTEM INSTRUHENIATION SURVEILLANCE REQUIREMENTS c:
- z
-4 CHANNEL CHANNEL FUNCTIONAL MODES IN WHICH SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBBATION TEST REQUIRED
- 13. Losa of Flow - Two Loop* s R N.A. 1
- 14. Steam Generator Water Level-- s R Q 1,2 Low-Low
- 15. Steam/Feedwater Flow Mismatch ~ s R Q 1,2 Low Steam Generator Water Level
- 16. Undervoltage - Reactor coolant N.A. R Q 1 w Pump*
't' N
- 17. Underfrequency - Reactor Coolant Pumps N.A. R 1
- 18. Turbine Trip A. Low Autoatop Oil Pressure N.A. N.A. S/U(l) 1,2 B. Turbine Stop Valve Closure N.A. N.A. S/U(l) 1,2
- 19. safety Injection Input from ESF N.A. N.A. H(4)(5) 1,2
- 20. Reactor Coolant Pump Breaker N.A. N.A. R N.A.
Po*ition Trip
- 21. Reactor Trip Breaker N.A. N.A. S ---==::!{_Y ( 19) , ~"' 1, 2 and
~A(l2, 13) ~
and R(l4)
N.A. N.A. H(S) 1,2 and *
- 22. Automatic Trip Logic
ATTACHMENT B REVISED NOTATION FOR NLR-N94003 TABLE 4.3-1 LCR 93-06 INSERT (9) The CHANNEL FUNCTIONAL TEST shall independently verify the OPERABILITY of the Undervoltage and Shunt Trip mechanism for the Manual Reactor Trip Function.
The test shall also verify OPERABILITY of the Bypass Breaker Trip circuits.
(10) - DELETED (11) - The CHANNEL FUNCTIONAL TEST shall independently verify the OPERABILITY of the Reactor Trip Breaker Undervoltage and Shunt Trip mechanisms.
(12) - DELETED
NOTATION
( l ). If not performed in previous 31 days.
( 2) Heat balance only, above 15\ of RATED THERMAL POWER.
( 3) Compare incore to excore axial offset above 15\ of RATED THERMAL POWER. Recalibrate if absolute difference C!: 3 percent.
( 4) Manual SSPS functional input check every 18 months.
( 5) Each train or logic channel shall be tested at lea*t every 62 days on a STAGGERED TEST BASIS.
(6) Neutron detectors may be excluded from CHANNEL CALIBRATION.
( 7) Below P-6 (Block of Source Range Reactor Trip) setpoint.
(8) Deleted teat Trip SALEM - UNIT 1 3/4 3-13 Amendment No. 142
NOTATION (13) - Verify operation of Bypass Breakers Shunt Trip function from local pushbutton while breaker is in the test position prior to placing breaker in service.
( 14) - Perform a functional test of the Bypass Breakers U.V. Attachment via the SSPS.
SALEM - UNIT 1 3/4 3-l3a Amendment No. 97
- ATTACHMENT C NLR-N94003 LCR 93-06 REACTOR TRIP SYSTEM SURVEILLANCE REQUIREMENTS REVISIONS SALEM GENERATING STATION UNIT 2 FACILITY OPERATING LICENSE DPR-75 DOCKET NO. 50-311 The following Technical Specifications have been revised (pen and ink) to reflect the proposed changes:
Technical Specification Table 4.3-1 3/4 3-11 Table 4.3-1 3/4 3-12 Table 4.3-1 3/4 3-13 Table 4.3-1 3/4 3-13a
TABLE 4.3-1 RIACTQR TRIP SXSTEM INSTRUHINTATION SURVEILLANCE REOUIBEMENTS c:
....-4
- z CHANNEL HODES IN WHICH N CHAHNEL FUNCTIONAL SURVEILLANCE FUNctIQNAL UNIT CHECK CALIBRATION TEST REQUIRED
- 1. Manual Reactor Trlp Switch R
N.A. N.A. _,.-.sftrt 9 )
- 2. Power Range, **utron Flux s 0(2), M(J) Q 1,2 and Q(6)
- 3. Power Range, Neutron Flux, N.A. R(6) 1,2 High Poaitlve Rat*
w 4. ~ower Range, Neutron Flux, N.A. R(6) 1,2 High Negative Rate
-w I
- s. Intermediate Range, Neutron Flux s R(6)
R(6)
S/U(l)
Q and S/U(l) 1,2 and
- 6. source Range, Neutron Flux S(7) s R 1,2
- 8. overpower 4T s R 1,2
- 9. Pre**url&er Preaaure--Low s R 1,2 s R 1,2
- 10. Pre**url&er Preaaure--Hlgh s 1,2 I:I
- 11. Pr***url&er Water Level--High R I
- I z
0
- 12. Lo** of Plow - Single Loop s R 1
TABLE 4.3-1 <<Continued*
RIACTQR TRIP SYSTEM INSTRUffENTATION SURVEILLANCE REOUIR£MENTS
-c
FUNCTIONAL UNIT CHANNEL CHECK CALIBRATION CHANNEL FUNCTIONAL TEST MODES IN WHICH SURVEILLANCI REQUIRED
- 13. Lo** of flow - Two Loop* s R N.A. 1
- 14. Steam Gener*tor Water Level-- s R 1,2 Low-Low
- 15. Steam/feedwater Plow Mi*match ~ s R Q 1,2 Low steam Generator water Level w 16. Uodervoltage - Reactor COolant N.A. R 1
w N
I
- 17. Underfrequency - Reactor Coolant N.A. R 1 Pwap*
- 18. Turbin* Trip
- a. Low Auto*top Oil Pr***ure N.A. M.A. S/Up) N.A.
- b. Turbin* Stop Valve Clo*ure N.A. N.A. S/U(l) N.A.
- 19. Safety Injection Input from SSF N.A. N.A. M(4) (5) 1,2 M.A. N.A. R N.A.
- 20. Reactor Coolant PWlp Breaker Po*ition Trip I
- I 5 ~Y.1:14.,f1~91J-1)1-:,:--.J- 1,2 and
I
- I
- 21. Reactor Trip Breaker Mf'll, 13),
" SAC1~1 H)
.z 0 and 8(14)
N.A. N.A. M(S) 1,2 and *
- 22. Automatic Trip Logic I
ATTACHMENT C REVISED NOTATION FOR NLR-N94003 TABLE 4.3-1 LCR 93-06 INSERT (9) The CHANNEL FUNCTIONAL TEST shall independently verify the OPERABILITY of the Undervoltage and Shunt Trip mechanism for the Manual Reactor Trip Function.
The test shall also verify OPERABILITY of the Bypass Breaker Trip circuits.
(10) - DELETED (11) - The CHANNEL FUNCTIONAL TEST shall independently verify the OPERABILITY of the Reactor Trip Breaker Undervoltage and Shunt Trip mechanisms.
(12) - DELETED
NOTATION
( l) If not performed in previous 31 days.
(2) Heat balance only, above 15\ of RATED THERMAL POWER.
(3) Compare incore to excore axial offset above 15\ of RATED THERMAL POWER. Recalibrate if absolute difference ~ 3 percent.
(4) Manual SSPS functional input check every 18 months.
( 5) Each train or logic channel shall be tested at least every 62 daya on a STAGGERED TEST BASIS~
(6) Neutron detectors may be excluded from CHANNEL CALIBRATION.
(7) Below P-6 (Block of Source Range Reactor Trip) setpoint.
(8) Deleted
( 9)
SALEM - UNIT 2 3/4 3-13 Amendment No. 121
(13) - Verify operation of Bypass Breakers Shunt Trip function from local pushbutton while breaker is in the test position prior to placing breaker in service.
(14) - Perform a functional test of the Bypass Breakers U.V. Attachment via the SSPS.
-- I I
SALEH - UNIT 2 3/4 3-13& Amendment No. 74