Forwards Updates to Crdr Repts, Addenda 1,4 & 5, Program Plan, Human Engineering Discrepancy Resolution Rept & Executive Summary, Respectively,Reflecting Status of Plant Crdr Program as of Dec 1989
ML20005E028
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/28/1989
From: Mcburnett M
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20005E029 List:
References
ST-HL-AE-3319, NUDOCS 9001030142
Download: ML20005E028 (5)


Text

,

tJ n:>;-

'Th'e Light company- P.O. Box 1700 Houston, Texas 77001 (713) 228 9211 ilouston Lightingk Power .

December 28, 1989 l ST HL AE-3319 .

File No.: G9.17, J34, G9.14 10CFR50 i i

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Electric Generating Station Units 1 and 2 1 Docket Nos. STN 50 498, STN 50 499 4 Control Room Desien Review Status )

[

l Control Room Design Review Status; M. A. McDurnett, HL&P,

Reference:

A.

Letter to the NRC; ST-HL AE-2793; dated October 18, 1988.

1 B. Reforecast of Category C Human Engineering Deficiencies (HEDs) l Originally Scheduled for Unit 1 Refueling; M. A. McBurnott, l HL&P, Letter to the NRC; ST HL AE 3074;' dated May 11, 1989.

Enclosed are updates to the Control Room Design Review (CRDR) reports (

for the South Texas Project Electric Generating Station (STPEGS) as follows: 1 e Executive Summary - Addendum 5 e Human Engineering Discrepancy Resolution Report - Addendum 4 e Program Plan - Addendum 1 These reports reflect the status of the STPEGS CRDR program as of g

December 1, 1989. Revision bars are used in the llED Resolution Report Addendum to denote changes from the previous submittal (Reference A), where applicable. For Human Engineering Discrepancies (HEDs) which have been

!- resolved, a specific completion statement is included for each Unit, as i -appropriate. Where no completion statement is included, corrective action for that HED is still in process. Since the Executive Summary and Program Plan Addenda consist of new material, no revision bars are used. Refer to Attachment 2, Section 5.0 (Executive Summary - Addendum 5) for the current implementation schedule.

L b l

9001030142 891228 i PDR ADOCK 05000498 P PDC i N A1/018.N10 A Subsidiary of flouston Industries Incorporated

I 'lloustnh Lighting & Power Company ST-HL AE 3319 File No.: G9.17, J34, G9.14 Page 2 Most of the HEDs concerning the Qualified Display Processing System (QDPS) have been corrected through firmware modifications prepared by Westinghouse. These modifications were implemented during the first refueling outage for Unit 1 and prior to Commercial Operation for Unit 2.

Implementation of the remaining minor graphics changes remains scheduled for the third refueling outage for each Unit (Reference A). QDPS items are discussed further in Attachment 3 (HED Resolution Report - Addendum 4, Note CPT-1, Page 2 3).

HL&P remains committed to the Control Room Design Review Program as an ongoing program. The CRDR Program Plan describes the process used during the STP construction phase. Addendum 1 to the Program Plan has been prepared to address CRDR activities, now that both Units are operational, and is included as Attachment 4.

Attachment 1 contains a current list of CRDR reports for your information. If you should have any questions on this matter, please contact Mr. A. W. Harrison at (512) 972-7298. ,

. A. McBurnett Manager Support Licensing MAM/SDP/eg Attachments: (1) List of Current Control Room Design Review Reports -

(2) Executive Summary - Addendum 5 (3) Human Engineering Discrepancy Resolution Report -

Addendum 4 (4) Program Plan - Addendum 1 A1/018.N10

z.

i' ST-HL AEo 3319 Houston Lighting & Power Company File No.: G9.17, J34, G9.14 South Texas Project Electric Generating Stat. ion p,g, 3 cc:

Regional Administrator, Region IV Rufus S. Scott Nuclear Regulatory Commission Associate 1Ceneral Counsel 611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company Arlington,-TX_ 76011 P. O. Box 61867 Houston, TX 77208-Ceorge Lick, Project Manager U.S. Nuclear Regulatory Commission INPO

-Washington, DC 20555 Records Center j.

1100 circle 75 Parkway J. I. Tapia Atlanta, CA 30339-3064 Senior Resident Inspector c/o U, S. Nuclear Regulatory Dr. Joseph M. Hendrie Commission 50 Be11 port Lane-P. C. Box 910 Be11 port, NY 11713 Bay City, TX 77414 D. K. Lacker

~J. R. Newman, Esquire Bureau of Radiation Control liewman & Holtzinger, P.C. Texas Department of Health l 1615 L Street, N.W. 1100 West 49th Street j Washington, DC 20036 Austin, TX 78704  !

D.-E. Ward /R. P. Verret l Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 j J. C. Lanier j l Director of Generation 1 l City of Austin Electric Utility

!- 721'Barton Springs Road  !

l Austin, TX 78704 i l

l R. J. Costello/M. T. Hardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296 1

Revised 12/15/R9 L4/NRC/

a

n r

.c '. *-

Attachment 1 I' ST-llL AE 3319 Page 1 of 2 CONTROL ROOM DESIGN REVIEW REPORTS Current Volume Revision Date

1. Program Plan 1 03/31/83 Addendum 1 -

12/01/89

2. Criteria Report 2 03/27/84 Addendum 1 -

06/03/85 Change 1 -

12/22/86 3, Operating Experience Review Report 0 03/25/83

4. . System Function & Task Analysis Report 0 03/25/83 5, Control Room Survey (CRS) Report Volume I Original (3/30/84)

Volume II O 03/30/84 Volume III O 03/30/84 Volume IV- Original (3/30/84)

6. Annunciator Study Report 0 03/29/84

-7. Special Studies Report 0 03/30/84

8. Implementation Plan Report 0 03/28/83
9. ' System Function & Task Analysis Validation Report 0 03/19/84 10, Operating Experience Review Validation Report 0 03/07/84
11. Control Room Survey Validation Report 0 03/07/84

() -

Indicates submittal, although no revision or date appears on document A1/018,N10

W' L

h

[; ~ Oj % Attachment 1 ST-llL AE 3319 Page 2 of 2 CONTROL ROOM DESIGN REVIEW REPORTS Current Volume Revision Date

12. Executive Summary 0 02/27/84

. Addendum 1 -

04/15/85 Addendum 2' -

12/22/86 Addendum 3 -

11/23/87 Addendum 4 -

09/30/88 Addendum 5 -

12/01/89

13. : lluman Engineering Deficiency Resolution Report 0 04/15/86 i Revised Pages 1 08/12/85 Addendum 1 -

12/22/86 Addendum 2 -

11/23/87 l Addendum 3 -

09/30/88 Addendum 4 -

12/01/89 i i

14. Emergency Operating Procedures l Validation Report 0 12/22/86 l i

() -

Indicates submittal, although no revision or date appears on document

'A1/018,N10

)