Revised Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, Discussing Two Channels Being InstalledML18102A316 |
Person / Time |
---|
Site: |
Salem |
---|
Issue date: |
08/13/1996 |
---|
From: |
Public Service Enterprise Group |
---|
To: |
|
---|
Shared Package |
---|
ML18102A315 |
List: |
---|
References |
---|
NUDOCS 9608220052 |
Download: ML18102A316 (5) |
|
Similar Documents at Salem |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 ML18102B6081997-10-0606 October 1997 Proposed Tech Specs Revising LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys. ML18102B5571997-08-27027 August 1997 Proposed Tech Specs,Providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, Which States That Three CCW Pumps Required to Meet LCO ML18102B5301997-08-19019 August 1997 Proposed Tech Specs,Providing Addl Operational Flexibility to Allow Orderly Resumption of Startup & Preclude Unwarranted Power Transients at Salem Unit 2 ML18102B5341997-08-18018 August 1997 Proposed Tech Specs,Incorporating Plant Computer (P-250) Into TS Bases for Movable Control Assemblies ML18102B4891997-08-0101 August 1997 Proposed Tech Specs Section 4.2.1 Rewording Section to State Util Will Adhere to Section 7,Incidental Take Statement Approved by Natl Maring Fisheries Svc ML18102B3911997-06-12012 June 1997 Proposed Tech Specs,Representing Addition of New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B3061997-05-14014 May 1997 Proposed Tech Specs,Revising SR 4.7.6.1.d.1,to Indicate That Specified Acceptable Filter Dp Is to Be Measured Across Filter Housing & Reflecting Filter Dp Acceptance Value Greater than 2.70 Water Gauge ML18102B2631997-05-0101 May 1997 Proposed Tech Specs,Adding New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B2601997-05-0101 May 1997 Proposed Tech Specs 3/4.7.7 Revising Certain Allowed Outage Times & Creating 3/4.7.11 to Address Switchgear & Penetration Area Ventilation Sys ML18102B0341997-04-25025 April 1997 Proposed Tech Specs 3.5.2 Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 1999-08-25
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 1999-09-10
[Table view] |
Text
WALL UNIT 1 UNIT 2 CONTROL EQUIPMENT ROOM CONTROL EQUIPMENT ROOM lRlB 2RlB RADIATION MONITOR RADIATION MONITOR MICROPROCESSOR MICROPROCESSOR CH 1 CH 2 CH 2 CH 1 1e RADIATION DETECTOR ITYP> ~
OUTSIDE Ji1 " OUTSIDE AIR ../ "I... AIR
~
1CAA40 1CAA43 2CAA43 I
2CAA40 UNIT 1 UNIT 2i NORMAL INTAKE NORMAL INTAKE
TABLE 3.3-6 (Continued)
RADIATION MONITORING INSTRUMENTATION MINIMUM CHANNELS APPLICABLE ALARM/TRIP MEASUREMENT INSTRUMENT OPERABLE MODES SETPOINT RANGE ACTION
- 2. PROCESS MONITORS
- b. Noble Gas Effluent Monitors l) Medium Range Auxiliary 1 1,2,3&4 s3.0xlo* 2 r,,ci/cm3 io-3 -10 1 µCi/cm 3 23 Building Exhaust System (Alarm only)
(Plant Vent)
- 2) High Range Auxiliary 1 1, 2, 3&4 ~1.ox10 2 r11ci/cm3 lo*l -10 5 µCi /cm 3 23 Building Exhaust System (Alarm only)
(Plant Vent)
- 3) Main Steamline 1/ 1,2,3&4 slO rnR/hr 1 _10 4 mR/hr 23 Discharge (Safety MS Line (Alarm only)
Valves and Atmospheric Steam Dumps
- 4) Condenser Exhaust 1 1,;., 3&4 sl. 27xl0 4 cpm 1-10 6 cpm 23 System (Alarm only) le ' - /0 ., c;;..i
- 3. CaS({lo\... f<oCP\ Jo ct. Pnr T~-t°'he -f'i:tJ~J-1~
}eve.I
'* COJ\{.o\ R.oo-. ~~ r- ll\~1.1bs shGtrJ. befwe~ Ur.:f I ~
- Jf AII MaJ es. .d J._rl*J q 't o{ i rr11-J.. ;.:tkJ -£..,/
NJJeA-e..
2..
QbSe" bkes J J.,,id c,;e_ J/er.,4,',,,.5 3/4 3-36a Amendment No. f5 f SALEM UNIT 1
- NS'"'."R':...;.lENT;.. 7 :::GN 3;..s:::s 3' 4. 3. 3.::. RADIATION MONITORING =~*STR::..:MENl-ATION ,;continued)
CROSS REFERENCE - TABLES 3.3-6 AND 4.3-3 Fune Rad Mon Rad Mon Unit Number Function Area Monitors la 1RS/1R9 Fuel Storage Area lb 1R44 Containment Area Process Monitors 2al 1Rl2A Containment Purge & Pressure/Vacuum Relief Gaseous Activity
- iR41C Plant Vent Noble Gas Monitor may substitute for 1Rl2A when the Purge & Pressure/Vacuum Relief Valves are open.
2a2 lRllA Containment Purge & Pressure/Vacuum Relief Air Particulate Activity 2bl 1R45B Medium Range Auxiliary Building Exhaust System (Plant Vent)
Noble Gas Effluent 2b2 1R45C High Range Auxiliary Building ~xhaust System (Plant Vent)
Noble Gas Effluent 2b3 1R46 Main Steamline Discharge (Safety Valves and Atmospheric Dump Valves) Noble Gas Effluent 2b4 1Rl5 Condenser Exhaust System Noble Gas Effluent INCORE DETECTORS The OPERABILITY of the movable incore detectors with the specified minimum complement of equipment ensures that the measure~ents obtained from use of this system accurately represent the spatial neutron flux distribution of the reactor core. The OPERABILITY of this system is demonstrated by irradiating each detector used and normalizing its respective output.
3/4.3.3.3 THIS SECTION DELETED 3/4.3.3.4 THIS SECTION DELETED
~-
Unit 1 Control Room Intake Channel 1 (to Unit 1 Monitor " "
3o...j lRlB-1 2R1B-2 Unit 1 Control Room Intake Channel 2 (to Unit 2 Monitor) 2R1B-1 Unit 2 Control Room Intake Channel 1 (to Unit 2 Monitor) lRlB-2 Unit 2 Control Room Intake Channel 2 (to Unit 1 Monitor)
SALEM - UNIT 1 8 3/4 3-2 Arnendmen t No . : C. 7
TABLE l-l-6 (Continued I RADIATION MQNITQRINQ INSTRYMENTATIQN MINIMUM CHANNELS APPLICABLE ALARM/TRIP MEASUREMENT INSTRUMENT OPERABLE MODES SETPOINT RANGE ACTION
- 2. PROCESS MONITORS
- b. Noble Gas Effluent Monitors
- 1) Medium Range Auxiliary 1 1, ,2, 3 &4 s3.0xio- 2 µCi/cm 3 lo- 3 -10 1 µci/cm3 26 Building Exhaust System (Alarm only)
(Plant Vent)
- 2) High Range Auxiliary 1 1, 2, 3&4 d .ox10 2 µCi/cm3 l0- 1 -10 5*µci/cm 3 26 Building Exhaust System (Alarm only)
(Plant Vent)
- 3) Main Steadlline 1/ 1,2,3&4 10 mR/hr 1-10°' mR/hr 26 Discharge (Safety MS Line (Alarm only)
Valves and Atmospheric Steam Dumps)
- 4) Condenser Exhaust l 1, 2, 3&4 s7.12xl0 4 cpm 1-10 6 cpm 26 System (Alarm only)
- 3. ~ (lro./\ :qif a.' A*~ :r~+o..k - RttJ1ct~:lM. L. /;ll4-o.k ')G-ile-
~ J ..tf 8~JO~ Cfl~
I 10 - 10 1
e-r Z.7 lQ.11el Cor.~o\ ~ ttlr- ("~ttl:es -skn~J be--fweeCI\ l/_"';t I J 2.
ff/ I Maks 11..J J~r: 'j ""'"e""e.-.t o.jj 1.-ra.J:.NeJ 4e 1QS!e... b/ie.s. al J..ri(J 6lJI> ~k'noJ5.
i '
SAl . UNIT 2 3/" ~-398 Amendment No. 1JQ L
~ .
3ASC:S 3' ... 3 . 3 . ::.
RADIAT:CN MONITORING :~ISTRL~E~f:'ATICN
, :ont::.nued)
- ROSS REFERENCE - TABLES 3.3-6 and 4.3-3 Fune Rad Mon Rad Mon Unit Number Function Area Monitors la 2R5/2R9 Fuel Storage Area lb 2R44 Containment Area Process Monitors 2al 2Rl2A Containment Purge & Pressure/Vacuum Relief Gaseous Activity
- 2R41C Plant Vent Noble Gas Monitor may substitute for 2Rl2A when the Purge & Pressure Vacuum Relief Valves are open.
2a2 2RllA Containment Purge & Pressure/Vacuum Relief Air Particulate Activity 2bl 2R45B Medium Range Auxiliary Building Exhaust System (Plant Vent)
Noble Gas Effluent 2b2 2R45C High Range Auxiliary Building Exhaust System (Plant Vent)
Noble Gas Effluent 2b3 2R46 Main Steamline Discharge (Safety Valves and Atmospheric Dump Valves) Noble Gas Effluent 2b4 2Rl5 Condenser Exhaust System Noble Gas Effluent
_,,-r / htJ sen* BJ IA~ ]f4. 3. 3. 2 MOVABLE INCORE DETECTORS The OPERABILITY of the movable incore detectors with the specified minimum complement of equipment ensures that the measurements obtained from use of this system accurately represent the spatial neutron flux distribution of the reactor core. The OPERABILITY of this system is demonstrated by irradiating each detector used and normalizing its respective output.
For the purpose of measuring FQ(Z) or FM~H' a full incore flux map is used.
Quarter-core flux maps, as defined in WCAP-8648, June 1976, may be used in recalibration of the excore neutron flux detection system, and full incore flux maps or symmetric incore thimbles may be used for monitoring the QUADRANT POWER TILT RATIO when one Power Range Channel is inoperable.
3/4.3.3.3 THIS SECTION DELETED 3/4.3.3.4 SECTION DELETED 3 ... ~-:-;
~RlB-2 Unit 2 Control Room Intake Channel 1 (to Unit 2 Monitor)
Unit 2 Control Room Intake Channel 2 (to Unit 1 Monitor)
RlB-1 Unit 1 Control Room Intake Channel 1 (to Unit 1 RlB-2 Unit 1 Control Room Intake Channel 2 (to Unit 2 SALEM UNIT 2 B 3/4 3-2 Amendment No.149