ML18102A316

From kanterella
Jump to navigation Jump to search
Revised Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, Discussing Two Channels Being Installed
ML18102A316
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/13/1996
From:
Public Service Enterprise Group
To:
Shared Package
ML18102A315 List:
References
NUDOCS 9608220052
Download: ML18102A316 (5)


Text

WALL UNIT 1 UNIT 2 CONTROL EQUIPMENT ROOM CONTROL EQUIPMENT ROOM lRlB 2RlB RADIATION MONITOR RADIATION MONITOR MICROPROCESSOR MICROPROCESSOR CH 1 CH 2 CH 2 CH 1 1e RADIATION DETECTOR ITYP> ~

OUTSIDE Ji1 " OUTSIDE AIR ../ "I... AIR

  • r' "' ...

~

1CAA40 1CAA43 2CAA43 I

2CAA40 UNIT 1 UNIT 2i NORMAL INTAKE NORMAL INTAKE

TABLE 3.3-6 (Continued)

RADIATION MONITORING INSTRUMENTATION MINIMUM CHANNELS APPLICABLE ALARM/TRIP MEASUREMENT INSTRUMENT OPERABLE MODES SETPOINT RANGE ACTION

2. PROCESS MONITORS
b. Noble Gas Effluent Monitors l) Medium Range Auxiliary 1 1,2,3&4 s3.0xlo* 2 r,,ci/cm3 io-3 -10 1 µCi/cm 3 23 Building Exhaust System (Alarm only)

(Plant Vent)

2) High Range Auxiliary 1 1, 2, 3&4 ~1.ox10 2 r11ci/cm3 lo*l -10 5 µCi /cm 3 23 Building Exhaust System (Alarm only)

(Plant Vent)

3) Main Steamline 1/ 1,2,3&4 slO rnR/hr 1 _10 4 mR/hr 23 Discharge (Safety MS Line (Alarm only)

Valves and Atmospheric Steam Dumps

4) Condenser Exhaust 1 1,;., 3&4 sl. 27xl0 4 cpm 1-10 6 cpm 23 System (Alarm only) le ' - /0 ., c;;..i
3. CaS({lo\... f<oCP\ Jo ct. Pnr T~-t°'he -f'i:tJ~J-1~

}eve.I

'* COJ\{.o\ R.oo-. ~~ r- ll\~1.1bs shGtrJ. befwe~ Ur.:f I ~

  • Jf AII MaJ es. .d J._rl*J q 't o{ i rr11-J.. ;.:tkJ -£..,/

NJJeA-e..

2..

QbSe" bkes J J.,,id c,;e_ J/er.,4,',,,.5 3/4 3-36a Amendment No. f5 f SALEM UNIT 1

NS'"'."R':...;.lENT;.. 7 :::GN 3;..s:::s 3' 4. 3. 3.::. RADIATION MONITORING =~*STR::..:MENl-ATION ,;continued)

CROSS REFERENCE - TABLES 3.3-6 AND 4.3-3 Fune Rad Mon Rad Mon Unit Number Function Area Monitors la 1RS/1R9 Fuel Storage Area lb 1R44 Containment Area Process Monitors 2al 1Rl2A Containment Purge & Pressure/Vacuum Relief Gaseous Activity

  1. iR41C Plant Vent Noble Gas Monitor may substitute for 1Rl2A when the Purge & Pressure/Vacuum Relief Valves are open.

2a2 lRllA Containment Purge & Pressure/Vacuum Relief Air Particulate Activity 2bl 1R45B Medium Range Auxiliary Building Exhaust System (Plant Vent)

Noble Gas Effluent 2b2 1R45C High Range Auxiliary Building ~xhaust System (Plant Vent)

Noble Gas Effluent 2b3 1R46 Main Steamline Discharge (Safety Valves and Atmospheric Dump Valves) Noble Gas Effluent 2b4 1Rl5 Condenser Exhaust System Noble Gas Effluent INCORE DETECTORS The OPERABILITY of the movable incore detectors with the specified minimum complement of equipment ensures that the measure~ents obtained from use of this system accurately represent the spatial neutron flux distribution of the reactor core. The OPERABILITY of this system is demonstrated by irradiating each detector used and normalizing its respective output.

3/4.3.3.3 THIS SECTION DELETED 3/4.3.3.4 THIS SECTION DELETED

~-

Unit 1 Control Room Intake Channel 1 (to Unit 1 Monitor " "

3o...j lRlB-1 2R1B-2 Unit 1 Control Room Intake Channel 2 (to Unit 2 Monitor) 2R1B-1 Unit 2 Control Room Intake Channel 1 (to Unit 2 Monitor) lRlB-2 Unit 2 Control Room Intake Channel 2 (to Unit 1 Monitor)

SALEM - UNIT 1 8 3/4 3-2 Arnendmen t No . : C. 7

TABLE l-l-6 (Continued I RADIATION MQNITQRINQ INSTRYMENTATIQN MINIMUM CHANNELS APPLICABLE ALARM/TRIP MEASUREMENT INSTRUMENT OPERABLE MODES SETPOINT RANGE ACTION

2. PROCESS MONITORS
b. Noble Gas Effluent Monitors
1) Medium Range Auxiliary 1 1, ,2, 3 &4 s3.0xio- 2 µCi/cm 3 lo- 3 -10 1 µci/cm3 26 Building Exhaust System (Alarm only)

(Plant Vent)

2) High Range Auxiliary 1 1, 2, 3&4 d .ox10 2 µCi/cm3 l0- 1 -10 5*µci/cm 3 26 Building Exhaust System (Alarm only)

(Plant Vent)

3) Main Steadlline 1/ 1,2,3&4 10 mR/hr 1-10°' mR/hr 26 Discharge (Safety MS Line (Alarm only)

Valves and Atmospheric Steam Dumps)

4) Condenser Exhaust l 1, 2, 3&4 s7.12xl0 4 cpm 1-10 6 cpm 26 System (Alarm only)
3. ~ (lro./\ :qif a.' A*~ :r~+o..k - RttJ1ct~:lM. L. /;ll4-o.k ')G-ile-

~ J ..tf 8~JO~ Cfl~

I 10 - 10 1

e-r Z.7 lQ.11el Cor.~o\ ~ ttlr- ("~ttl:es -skn~J be--fweeCI\ l/_"';t I J 2.

ff/ I Maks 11..J J~r: 'j ""'"e""e.-.t o.jj 1.-ra.J:.NeJ 4e 1QS!e... b/ie.s. al J..ri(J 6lJI> ~k'noJ5.

i '

SAl . UNIT 2 3/" ~-398 Amendment No. 1JQ L

  • ~-' ' _;

~ .

3ASC:S 3' ... 3 . 3 . ::.

RADIAT:CN MONITORING :~ISTRL~E~f:'ATICN

, :ont::.nued)

ROSS REFERENCE - TABLES 3.3-6 and 4.3-3 Fune Rad Mon Rad Mon Unit Number Function Area Monitors la 2R5/2R9 Fuel Storage Area lb 2R44 Containment Area Process Monitors 2al 2Rl2A Containment Purge & Pressure/Vacuum Relief Gaseous Activity
  1. 2R41C Plant Vent Noble Gas Monitor may substitute for 2Rl2A when the Purge & Pressure Vacuum Relief Valves are open.

2a2 2RllA Containment Purge & Pressure/Vacuum Relief Air Particulate Activity 2bl 2R45B Medium Range Auxiliary Building Exhaust System (Plant Vent)

Noble Gas Effluent 2b2 2R45C High Range Auxiliary Building Exhaust System (Plant Vent)

Noble Gas Effluent 2b3 2R46 Main Steamline Discharge (Safety Valves and Atmospheric Dump Valves) Noble Gas Effluent 2b4 2Rl5 Condenser Exhaust System Noble Gas Effluent

_,,-r / htJ sen* BJ IA~ ]f4. 3. 3. 2 MOVABLE INCORE DETECTORS The OPERABILITY of the movable incore detectors with the specified minimum complement of equipment ensures that the measurements obtained from use of this system accurately represent the spatial neutron flux distribution of the reactor core. The OPERABILITY of this system is demonstrated by irradiating each detector used and normalizing its respective output.

For the purpose of measuring FQ(Z) or FM~H' a full incore flux map is used.

Quarter-core flux maps, as defined in WCAP-8648, June 1976, may be used in recalibration of the excore neutron flux detection system, and full incore flux maps or symmetric incore thimbles may be used for monitoring the QUADRANT POWER TILT RATIO when one Power Range Channel is inoperable.

3/4.3.3.3 THIS SECTION DELETED 3/4.3.3.4 SECTION DELETED 3 ... ~-:-;

~RlB-2 Unit 2 Control Room Intake Channel 1 (to Unit 2 Monitor)

Unit 2 Control Room Intake Channel 2 (to Unit 1 Monitor)

RlB-1 Unit 1 Control Room Intake Channel 1 (to Unit 1 RlB-2 Unit 1 Control Room Intake Channel 2 (to Unit 2 SALEM UNIT 2 B 3/4 3-2 Amendment No.149