MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152A4741999-05-19019 May 1999 Forwards Completed Registration Form for Renewal of ASTs at Surry Nuclear Power Station,Iaw Section 9VAC 25-91-100.F ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML20217D6621999-05-14014 May 1999 Forwards NRC Operator Licensing Exams 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15.Nine Candidates Passed (& One Failed) Exam ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr ML18153A3421999-03-26026 March 1999 Provides Updated Medical Status Rept for Wb Gross in Accordance with License SOP-20476-02,Docket 55-5228,as Amended by 980320 License Amend.Informs That Gross Exhibits No Performance Problems & Will Continue on Current Medicine ML20204H0331999-03-17017 March 1999 Forwards Rev 5 to PSP for Surry & North Anna Power Stations & Associated Isfsis.Description & Justification for Changes Included with Plan Rev.Rev 5 to PSP Withheld Per 10CFR73.21 ML18153A3411999-03-15015 March 1999 Forwards Signed Applications & Medical Certificates for Initial License at Surry Power Station Units 1 & 2 for Listed Individuals.Without Encls 1999-09-08
[Table view] |
Text
_;
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRCHNIA 23261 February 3, 1997 U.S. Nuclear Regulatory Commission Serial No.97-077 Attention: Document Control Desk NL&OS/GDM RO Washington, D.C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGE DELETION OF SPECIFIC ASME SECTION XI CODE REFERENCE Pursuant to 10 CFR 50.90, Virginia Electric and Power Company requests amendments, in the form of changes to the Technical Specifications, to Facility Operating License Numbers DPR-32 and 37 for Surry Power Station Units 1 and 2.
Consistent with the requirements of 10 CFR 50.55a(g)(5)(ii), the proposed change will delete a specific reference to the 1972 Winter Addenda of the ASME Section XI Code in the Technical Specifications and replace it- with a generic reference to the ASME Section XI Code for Class 2 welds (IWC).
A discussion of the proposed Technical Specifications change is provided in Attachment 1. The proposed Technical Specifications change is provided in Attachment 2. It has been determined that the proposed Technical Specifications change does not involve an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92. The basis for our determination that the changes do not involve a significant hazards consideration is provided in Attachment 3. The proposed Technical Specifications change has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Management Safety Review Committee.
Should you have any questions or require additional information, please contact us.
Very truly yours, James P. O'Hanlon Senior Vice President - Nuclear Attachments r----- 9702200241 970203 PDR ADOCK 05000280.
1 p *poR
cc:
- U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.
Suite 2900 Atlanta, Georgia 30323 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station Commissioner Department of Radiological Health Room 104A 1500 East Main Street Richmond, VA 23219
e-COMMONWEALTH OF VIRGINIA )
)
COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by J. P. O'Hanlon, who is Senior Vice President - Nuclear, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized t9 execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this 3 t'd day of J L~ 4-h , 19 CJ 7.
My Commission Expires: March 31, 2000.
u iJ/off ?'ft U>>:J 11.1) 0 Notary ublic
) .- {' , __
ATTACHMENT 1 DISCUSSION OF CHANGE SURRY POWER STATION UNITS 1 AND 2 VIRGINIA ELECTRIC AND POWER COMPANY
e INTRODUCTION Paragraph 50.55a(g)(5)(ii) in 10 CFR 50 states that, "If a revised inservice inspection program for a facility conflicts with the technical specification for the facility, the licensee shall apply to the Commission for amendment of the technical specifications to conform the technical specification to the revised program. The licensee shall submit this application, as specified in Section 50.4, at least six months before the start of the period during which the provisions become applicable, as determined by paragraph (g)(4) of this section." Surry Power Station Units 1 and 2 Technical Specification 4.15, "Augmented
- lnservice Inspection Program for High Energy *Lines
- Outside of Containment," references an edition of the ASME Section XI Code (hereto after referred to as the Code) that conflicts with the edition that is NRC approved and currently applicable for the station's lnservice .Inspection (ISl)_Program. Consequently, a change to Technical Specification 4.15 is proposed to resolve the difference between Code edition references.
To eliminate this inconsistency between the current approved ISi Program and Code (1989 Edition) and the Technical Specifications, Virginia Electric and Power Company is proposing to eliminate the reference to a specific Code edition in the Technical Specifications. The proposed Technical Specifications change does not detrimentally affect the augmented inservice inspection program currently conducted on high energy main steam and feedwater piping located in the main steam valve house as described in Technical Specifications Section 4.15. This augmented inspection program was imposed by the NRC Staff to address the issues associated with design adequacy of certain safety-related components needed for safe shutdown which could be adversely impacted by a postulated high energy pipe break. The proposed change to Technical Specification 4.15.B.1 is administrative in nature in that it includes a general reference to the ASME Section XI Code rather than a specific reference. This change provides uniformity within the lnservice Inspection Program, which includes our augmented inspection program, by ensuring that all weld inspections are performed to the current NRG-approved version of the ASME Section XI Code approved for use at Surry Power Station. This change is also consistent with the wording of Technical Specifications 4.15.A and C which invoke ASME Section XI requirements in a more general fashion.
The proposed change ensures the type of examination, extent of examination and frequency of examination on the affected components will be conducted consistent with the current NRG-approved version of the ASME Section XI Code as required by 10 CFR 50.55a. The proposed change does not alter any break analysis provided in the UFSAR for high energy line breaks. The proposed change is administrative in nature and ensures consistency within the ISi program, which includes the augmented inspection program. Consequently, the proposed change does not pose a significant safety hazard, nor does it represent an unreviewed safety question.
e.
BACKGROUND Paragraph 4.15.B.1 states that, "Welds in the main steam lines and in the feedwater lines in the main steam valve house shall be examined in accordance with the requirements of subsection ISC 100 through 600 of the 1972 Winter Addenda of ASME Section XI Code." These examinations are considered augmented examinations in the Surry Units 1 and 2 lnservice Inspection (ISi) Program and are described in the third ten-year interval ISi Program Plans submitted to the NRC.
Surry Power Station has received NRC safety evaluations for ISi Program Plans, Unit 1 and Unit 2. The technical evaluation that is included with the NRC safety evaluation describes the augmented examination commitments in Section 2.2.4. As part of these commitments, paragraph (c) states for Unit 1.that we committed to the, "Examination of the portions of the high energy lines specified in Technical Specification 4.15. For Surry, Unit 1, this specification applies to welds in the Main Steam and Main Feedwater lines in the Main Steam Valve House;" The technical evaluation for Unit 2 has the same reference.
Therefore, as described in the third ten year interval ISi program plans for Surry Units 1 and 2, and as approved by the NRC, the proper Code edition for the welds described in Technical Specification 4.15.B.1 is the 1989 Edition of ASME Section XI. As required by 10 CFR 50.SSa(g)(S)(ii), paragraph 4.15.B.1 should have been amended to conform to the revised ISi program to ensure consistency. The proposed change to Technical Specification 4.15.B.1 provides a general reference to the ASME Section XI Code without specific reference to a Code edition. The use of a general Code reference is consistent with the wording in Technical Specifications 4.15.A and C, and ensures that weld examinations are being consistently performed to the currently approved edition of the ASME Section XI Code approved for use at Surry Power Station.
LICENSING BASIS In a December 18, 1972 letter to Virginia Electric and Power Company, the NRG staff required the performance of an analysis and the associated documentation of the consequences of postulated pipe failures outside the containment structure, including the rupture of a main steam or feedwater line. On June 22, 1973 (Serial No. 01973), Virginia Electric and Power Company provided the NRC with the results of an analysis of the consequences of postulated pipe failures outside the containment structure, including the rupture of a main steam or feedwater line. Subsequent to this submittal, several telephone conversations between the AEC and Virginia Electric and Power Company transpired regarding the specifics of the evaluation and our commitment to perform an augmented inspection program. In our letter dated July 16, 1973 (Serial No. 03873), we discussed the details of a non-destructive testing program for the twenty major stress points for each unit's high energy pipe in the Main Steam Valve House and noted that the stress points would be examined in accordance with ASME Section XI requirements. We further documented two additional NRG comments and our corresponding responses in our letter dated July 27, 1973 (Serial No. 05473). In that letter, the NRG required the
examination of all other welds in the Main Steam Valve House in accordance with ASME Section XI requirements. We specified that the examination of the other welds in the main steam and feedwater lines would be performed in accordance with Paragraph ISC-242 of the Winter 1972 Addenda of the ASME Section XI Code. This specific reference to a Code edition likely occurred because it was the first edition to include examination requirements for Class 2 pipe.
The NRC specified a change to the Surry Technical Specifications on September 21, 1973 that approved our augmented inspection program. In this Technical Specifications change, the NRG expanded the previous reference to examine other welds in the main steam and feedwater lines in the Main Steam Valve House in accordance with Paragraph ISC-242 of the Winter 1972 Addenda of the ASME Section XI Code noted above. The NRC issued Technical Specification 4.15 with the following, more specific wording for the ASME Section XI Code requirements for weld examinations in 4.15.B.1:
"1 . Welds in the main steam lines including the safety valve headers and in the feedwater lines in the main steam valve house shall be examined in accordance with the requirements of subsection ISC 100 through 600 of the 1972 Winter Addenda of the ASME Section XI Code."
Again, we believe this specific reference to the ISC subsections of the 1972 Winter Addenda was because that Code edition was the first to include examination requirements for Class 2 pipe and these requirements were to be applied to the non-code pipe in the augmented inspection program. Paragraphs 4.15.A and 4.15.C included only general references to the ASME Section XI Code.
Since original incorporation into the Technical Specifications, we have submitted ISi Programs for the second and third ten-year inspection intervals to the NRC for their approval. These submittals updated our ASME Section XI Code of record to the 1980 edition and the 1989 edition, respectively. Surry Power Station last received NRC safety evaluations for our third ten-year interval ISi Program Plans for Unit 1 and Unit 2 in the Staff's letters dated July 19, 1995 and August 30, 1995, respectively. The technical evaluations that are included with the NRC safety evaluations describe the augmented examination commitments in Section 2.2.4. As part of these commitments, paragraph (c) states for Unit 1 that we have committed to the "Examination of the portions of the high energy lines specified in Technical Specification 4.15. For Surry, Unit 1, this specification applies to welds in the Main Steam and Main Feedwater lines in the Main Steam Valve House;" The technical evaluation for Unit 2 has the same reference.
Therefore, as described in the third ten-year interval ISi program plans for Surry Units 1 and 2, and as confirmed by the NRC safety evaluations, the proper Code edition for the welds described in Technical Specification 4.15.B.1 is the 1989 Edition of ASME Section XI. As required by 10 CFR 50.55a(g)(5)(ii), paragraph 4.15.B.1 requires revision to be consistent with the revised ISi program.
CURRENT DESIGN BASIS The current requirements for high energy line breaks are based upon Criterion No. 4 of the Commission's General Design Criteria, listed in Appendix A of 10 CFR Part 50 which requires that, "Structures, systems, and components important to safety shall be designed to accommodate the effects of and to be compatible with the environmental conditions associated with normal operation, maintenance, testing and postulated accidents, including loss-of-coolant accidents. These structures, systems and components shall be appropriately protected against dynamic effects, including the effects of missiles, pipe whipping, and discharging fluids, that may result. from
_ . _equipment failures and from events and conditions outside the nuclear power unit."
Virginia Electric and Power Company's analysis of the consequences of postulated pipe failures outside the containment structure, including the rupture of a main steam or feedwater line was submitted to the NRC in our letter dated June 22, 1973 (Serial No.
01973). This analysis has been incorporated into the Surry UFSAR as Appendix 148. As a result, an augmented inspection program was placed in Surry Technical Specifications Section 4.15.
DISCUSSION OF CHANGE The proposed change will eliminate any specific reference to a Code edition and addenda in Technical Specification 4.15.B.1 by generically referencing the periodically updated Code edition used for the ASME Section XI program. This change would eliminate the inconsistency between Code editions. The proposed change is administrative in nature.
Technical issues concerning the Code were resolved previously through the NRC endorsement process which updates 10 CFR 50.55a(b)(2). The integrity of the pipe examined by the augmented inspection program will be assured through the use of the current NRC and industry approved version of the ASME Section XI approved for use at Surry Power Station.
SPECIFIC CHANGES Surry Technical Specification 4.15.B.1 is revised to delete the specific reference to Subsection ISC 100 through 600 of the 1972 Winter Addenda of the ASME Section XI Code. The specific reference is replaced with a general reference to the ASME Section XI Code, Subsection IWC, without specific reference to Code edition.
SAFETY SIGNIFICANCE The proposed change administratively updates the Code reference to a generic, periodically updated reference to ASME Section XI as approved for use at Surry Power
Station. Examinations will continue on the applicable piping using an approved NRC and industry recognized Code and will assure piping integrity. The administrative change to Technical Specification 4.15.B.1 has no impact on safety and therefore does not result in an unreviewed safety question.