ML19031A918

From kanterella
Revision as of 13:23, 2 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
LER 1976-021-01 for Salem, Unit 1, Boron Injection Tank Inoperable
ML19031A918
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/07/1976
From: Schneider F
Public Service Electric & Gas Co
To: O'Reilly J
NRC/IE, NRC Region 1
References
LER 1976-021-01
Download: ML19031A918 (4)


Text

r=

I Frederick W. Schneider 80 Park Place Newark, N.J. 07101 201/622-7000 Vice President Production January 7, 1976

Dear Mr. O'Reilly:

LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 76-21/3L Pursuant to the requirements of Salem Generating Station Unit No. 1 Technical Specifications, Section 6.9.1, we are submitting Licensee Event Report for Reportable Occurrence 76-21/3L. This

  • report is required within thirty*(30) days of tJ;ie occurrence.

Sincerely yours, p~

CC: Director, Office of Inspection and Enforcement (30 copies)

Director, Office of Management Information and Program Control (3 copies)

Report Number: 76~il/3L Report Date: 1.6/76 Occurrence Date: 12/10/76

!tacility -Salem Generating Station Public Service Electric & Gas Company .

Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Boron Injection Tank. Inoperable.

CONPITIONS PRIOR TO OCCURRENCE: .

  • Mode 3 operation, Plant pressure 2235 psig, Plant temperature 547°F.

pESCRIPTION OF OCCURRENCE:

On 12/10/76; at 5:45 AM, the Chemistry Technician reported the Boron Injection Tank sample analysis for boron concentration was 19~899 ppm.

This value*is below the minimum concentration of .20,100 ppm as specified in Tech Spec L.C.O. paragraph 3.5.4.l(b). The Shift Supervisor imple-mented Technical Specification Action Statement for L.C.O. paragraph 3.5.4.1 and requested additional samples be taken and analyzed. At 10:00 AM,* on 12/10/76, the Chemistry Technician reported the re-analysis indicated the Boron Injection Tank boron concentration was 20,540 ppm.

Technical Specification Action Statement was cancelled.

DESIGNATION OF APPARENT-CAUSE OF OCCURRENCE:

Personnel error in analyzing the boron concentration of the Boron Injec-tion Tank. . The Chemistry Technician did not run a duplicate analysis as stated in the procedur~ to verify the first sample analysis.

ANALYSIS OF OCCURRENCE:

Improper sampling analytical techniques declared the Boron Injection Tank inoperable. SuQsequent sample analysis verifieq proper boron concentra-

. tion in the Boron Injection Tank. At no time was there any hazard to the general public or site personnel.

CORRECTIVE ACTION:

The Chemistry Technician was re-instructed on sample analytical tech-niques and procedural instructions which requires duplicate analysis to be performed. ...

FAILURE DATA:

This is the second failure of this type.

Equipment Identification: .Not Applicable B. Canfield Manager - Station SORC. Meeting No. 122-76


~~~~~~~

CONTROL BLOCK L.ICENSEE I

. Ll&SEE EVENT REPORT 6

L.ICENSE

  • I EVENT i ....

... -~

NAME L.ICENSE NUMBER TYPE TYPE:

@ITJ4N1J-1s1G1s1~1 ts°101--1010101010-1-101qJ 141111111 lJo WJ.14.

REPORT REPORT CATEGORY TY~ SOURCE OOC:KET NUMBER EVENT CATE REPORT CATE roJ11 coN"TtRJ..Qj

~ 57 58 IL I 59

~

60 I 0 I 51 0 I -I 0 I 21 71 2J 61 111 2 111 0 17 I 6 I 69 74 11121 1 I 6 I 7 I

. 75 6J EVENT DESCRIPTION

@li] I On 12/10/76, at 5:45 AM, the Chemistry Technician reported the Boron In-1 7 8 9 so

@:ill j ec tion Tank sample analysis for boron concentration was 19,899 ppm.

7 89

.@El This value is below .the minimum concentration of 20, 100 ppm as specified 7 8 .

liifill in Technical Specification L.C.O. paragraph 3.5.4.l(b). The Shift Super7 7 89 eo

~ [ visor implemented Tech Spec Action Statement for L.C.O. paragraph 3.5.4.lj 1 a 9 SYSTEM CAUSE PRIME COMPONENT COMPONENT eo COOE cooe: COMPONENT cooe SUPflt.IER MANUFACTURER VIOLATION

@]]IS IF I lA.1 IX I X I X I X I X-1.X.] l!J I Z I 919I91 lliJ 7 8 9 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION

@]fil I Personnel error in analyzing the boron concentration of the Boron Injec-1

~9 * . so l.!Ll!ll tion Tank. Manufacturer's nameplate data not applicable. The Technician I 7 B 9 SO

[@]I was re-instructed on sample analytical techniques and procedural I 1 89 eo FACIL.ITV METHOOOF r.r.1 STATUS ** ~POWER OTHER STATUS DISCOVERY OISC:OVERY OESCRIPTION l!-l.!..I . . Lill . 10 lo 10 I l~,__~Nul~A,,___.;;.__.I @J I* Chemistry Analysis 1 a 9 10 12 13 44 45 46 80

  • FORM OF ACTIVITY CONTENT REl..EASEO OF REI.EASE AMOUNT OF ACTIVl*Tv LOCATION OF RELEASE

.7 GE8 LkJ 9

l!J 10 I

11 N/A

~

I '~-----N~/A

~

_________~I 80 PERSc;lNNEL. EXPOSURES

  • r.r.;'J NUMBER TYPE OESCRIPTION t!.2.J\010101  !].JI~---~~~N~/=A~~--.-~--.----~~~--.-~-----.-~~~~--,,.,!I 7 8 9 11 12 13 80 PERSONNEL. INJURIES
  • NUMBER. OESCRIPTION G:EJto 101011I 7 a§ N A

~12:r--------------..;;;....l,---'--------------------------------------------------ao~

~ .*

OFFSITE CONSEQUENCSS

~~ ... N/A LOSS OR OAMAG& TO FACILITY TYPE CESCAIPTION l"a! t;J ~~a.----------_.,.....N. ./=A'--------.,..---------~-.'"""'J PUSL.ICITY GIB0~9------..,..-------------------=~:i...---------------..,..---------------------------------!so 1

AOOITIONAL. FACTORS III!JI EVENT DESCRIPTION AND CAUSE DESCRIPTION (Continued on Page 2) I 7 8 9 eo ITEJ'c;"-~----------~~------~----------------~----~-------------..._.i 1 ai ao NAME=-------=B:;...;..**_. .;:;;E~*;__C~a~n_f_:i.._*e_l~d_ _ __ PHONE: (609) 365-7000 Ext.Salem-525: i

-l- 12/16/76

~

EVEN! DESCRIPTION (Continued)

~

  • l and requested additional samples be taken and analyzed. At 10:00 AM, on 12/10/76, the* Chemistry Technician reported the re-analysis indicated that the Boron Injection Tank boron concentration was 20,540 ppm. Technical Specification Action Statement was cancelled.

The Boron Injection Tank is a passive component common to both ECCS subsystems and therefore, no redundant component exists. This is the second occurrence of this type. (76~21/3L).

CAUSE DESCRIPTION (Continued) instructions to perform duplicate analysis.