Special Report 03-002 Re Condenser Off Gas Monitor Being Inoperable for Greater than Seven Days
ML033360668
Person / Time
Site: Salem PSEG icon.png
Issue date: 11/24/2003
From:
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
03-002, LRN-03-0477
Download: ML033360668 (2)


Text

t Y- PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 LRN-03-0477 PSEG NuclearLLC United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Special Report 311/03-002 Salem Unit 2 Facility Operating License DPR-75 Docket No. 50-311 This special report is being submitted pursuant to the requirements of Salem Unit 2 Technical Specification (TS) 3.3.3.1 Radiation Monitoring Instrumentation" Action b, due to the condenser off gas monitor (2R15) being inoperable for greater than 7 days.

On November 10, 2003 at 0810 hours0.00938 days <br />0.225 hours <br />0.00134 weeks <br />3.08205e-4 months <br />, TS 3.3.3.1 was entered when Salem Unit 2 entered Mode 4 from its thirteenth (2R13) refueling outage. TS 3.3.3.1, Action b requires that With one or more radiation monitoring channels inoperable, take the ACTION shown in Table 3.3-6." Action 26 of Table 3.3-6 requires that within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> the preplanned alternate method of monitoring the appropriate parameter(s) be initiated, and (a) the inoperable channel be restored to operable within 7 days, or (b) to prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.

As stated above, the channel became inoperable when Unit 2 entered Mode 4 and condenser vacuum could not be established. Condenser vacuum could not be established due to delays during the generator shaft and exciter alignment. Condenser vacuum was established on November 18, 2003 and the 2R15 action statement was terminated.

Should there be any questions regarding this matter please contact E.H. Villar at 856-339-5456.

Sincerely a ager - Salem 952168 REV. 7/99

NOV 2 4 2003 Document Control Desk LRN-03-0477 C Administrator- Region I United States Nuclear Regulatory Commission 474 Allendale Road King of Prussia, PA 19406

/EHV