Cb..,..
Frederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Place* Newark. N.J. 07101 201/622-7000 Production February 7, 1977
-B,
,,'e I
, guJa*t
~
0
~ Y Docket File Mr. James P. O'Reilly Director of USNRC Off ice of Inspections and Enforcements Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Mr. O'Reilly:
LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 77-04/3L Pursuant to the requirements of Salem Generating Station Unit No. 1 Technical Specifications, Section 6.9.1, we are submitting Licensee Event Report for Reportable Occurrence 77-04/3L.
This report is required within thirty (30) days of the occurrence.
CC:
Director, Office of Inspection and Enforcement (30 copies)
Director, Office of Management Information and Program Control (3 copies)
Sincerely yours,
Report Number:
Report Date:
77.4/3L 1-11-77 Occurrence Date:
1-8-77 Facility:
Salem Generating Station
- Public Service Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:
- 13 Auxiliary Feed Pump fail to start.
CONDITIONS PRIOR TO OCCURRENCE:
Reactor Power:
30%
Turbine:
200 MWe Tave:
555°F Pressure:
2235 psig DESCRIPTION OF OCCURRENCE:
Reactor critical at 30% power when No. 12 Steam Generator Feed pump tripped due to low suction pressure.
Loss of No. 12 Stearn Generator Feedwater Pump resulted in low levels in Nos. 13 and 14 Stearn Generators causing a Reactor and Turbine trip.
Low levels in two of the four Steam Generators also initiated an automatic start signal to Nos. 11, 12 and 13 Auxiliary Feedwater Pumps.
No. 13 Auxiliary Feedwater Pump failed to start.
DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:
The cause of this occurrence was personnel error.
Investigation revealed that the Auxiliary Feed Pi..nnp Turbine was manually tripped.
A test was run simulating low level in two of the four Stearn Generators and No. 13 Auxiliary Feed Pump controls functioned correctly and the pump started as required.
Check-off sheet 4.1 of OI III-10.3.1 verifies the Auxiliary Feedwater System line-up after the system is secured when escalating power.
This check-off was overlooked and not run.
The manually tripped turbine was not identified.
The No. 13 Aux. Feed Pump was last demonstrated operable on 12-29-76 during surveillance 4. 7.1. 2 (a) (1).
~ -
~~port 77-04/3L
- 1-11-77 ANALYSIS OF OCCURRENCE:
Technical Specification 3.7.1.2 allows 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore an inoperable Auxiliary Feedwater Pump.
No. 13 Aux. Feed Ptimp was restored to operable status well within the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowance.
Nos. 11 and 12 Aux. Feedwater Pumps started normally and were available throughout this occurrence.
The limiting condition for operation was not violated.
At no time was there any danger to the general public or site personnel.
CORRECTIVE ACTION:
All operato~s will be reinstructed on the requirements of or III-10.3.l and the importance of verifying the Auxiliary Feedwater line-up.
FAILURE DATA:
Component failure is not applicable to this occurrence.
Prepared by T. L. Spencer Manager -
S~lem Generating Station SORC Meeting No.
13-77 I.
I
- .,/
CONTROL BLOCK LICENSEE NAME LICENSEE EVENt REPORT
' 6 LICENSE NUMBER LICENSE TYPE EVENT TYPE
@EJJNJJJS!G1s1~1 JsOIOl"'."""IOIOIOIOIOl--!OlqJ 14111 ll ll lJo ~
REPORT REPORT CATEGORY TYl'E SOURCE OOCKET NUMBER EVENT CATE REPORT CATE roTtl coN'TJ PI 0 I UJ
~ I 0 I 51 0 I -.! 0 I 2 I 71 2J I 0 I 11 0 I 8 I 7 I 7 I I 0 I 11 11 4 I 7 I 1J t-'li S7 58 S9 60 61 69 74 75 EVENT DESCRIPTION
@li] I Following a Reactor Trip, caused by low ievels in two (2) of the four I
7 89 60 tot3J~ (4) Steam Generators, the ~o. 13 Auxiliary Feedwater Pump failed to J
@El start as required.
No. 12 and No. 13 Auxiliary Feedwater Pumps did 7
8 d
'l 1 lfilfill start an were avai ab e throughout this occurrence.
Corrective 7
8 9
-f
- h.
11
@E] I action or t is occurrence wi be to reinstruct operators on the 7. 8 9 PRIME SYSTEM CAUSE COMPONENT cooe COCE COMPONENT COOE SUPPt..IER
. @TI] I cl Hf l.Al I Z I Z I Z I Z I Zl.Z.J lZJ 7
8 9 10 11 12 17 43 CAUSE DESCRIPTION COMPONENT MANUFACTURER I z I 9 I g I q I 44 47 VIO\\..ATION lNJ
- 48.
~I The cause of this occurrence was personnel error.
Investi gati an
@Er 1 9
revealed that the No. 13 Aux. Feedwat~r Pi*mp T11rhin e pas tripped 7
8 9 II@JI prior to the occurrence.
The Turbine was manually reset and a 1
a g FACILITY STATUS rilil Lru.
7 a
9 FORM OF
'lioPOWER 10 13 10 I 10 12 ACTIVITY CONTENT METHOOOF OTHER STATUS DISCOVERY DISCOVERY OESCRIPTION I._....__...,.N,,_,/A...._ _ ___.I LgJ 13 44 45 I NIA 46 I
I 80 I
aJ I
ao I
ao I
eo 80 RELEASED OF REl..EASC:
AMOUNT OF ACTIVITY LOCATION OF RELEASE Eli]
W
~
.I._ _..... N..._./A....__..._. _ _..,...I
..,I,__---:.1'4J /'--"A"---------.------::-:il 7
8 9
10 11 44 45 I
SO PERSONNEi. EXPOSURES NUMSE:R TYPE OESCRIPTION 1010101 ~ ~I ~~--=.:N~/A=-~,__~~~~~~~~~~---~~~J 7
9 II 12 13 00 PERSONNEi. INJURIES NUMe~R OESCRIPTION (IE]IOIOIOI
~I~-----~N~/~A-=-------~-----------::-:il 7
8 9 11 12 80 OFFSITE CONSEQUENCES
~l,,,_~~~~~~~--~~N~A~~~~~~~~~~~~~---~~~~~--~-r.:o1 l.OSS QA DAMAGE TO FACILITY TYPE DESCRIPTION
. (ili] 19Z I
- l. -------*=N"'-/A=-=----------------------,.,,11 1
a
\\0 td PUel.ICITY Gli.Jl.,:-~................................................................ -.J.:i,.~................................................ _,................................................................................................... ~
1 a 9 ADDITIONAL FACTORS Gli].,,,_~................................................................ ~N~/~A,.;;_........ ~
1 e 9 oo
[IID I EYPiT DESCRIPTION & CAUSF DESCRIPTION -(Continued on Pa~c 2) 7 8 9 I
so NAME: __ T_._L_._s_p'-e_n_c_e_r ________ _
PHONE: (609) 365-7000 Ext.Salem-52[
I
,'""/
Lfcense Event Report Page 2 EVENT DESCRIPTION (Continued) requirements of OI III-10.3.1 which requires the Aux. Feedwater System line-up to be checked after it is secured.
This is the first occurrence of this type (77-04/31).
CAUSE DESCRIPTION (Continued) test was performed simulating low water level in two Steam Generators.
All Turbine controls functioned properly and No. 13 Aux. Feedwater Pump started normally.
Check-off sheet 4.1 of 01 III-10.3.1 requires the Aux. Feedwater System line-up to be verified after Aux. Feedwater is secured.
Check-off 4.1 of OI III-10.3.1 was not run after securing the Aux. Feedwater System and the manually tripped Turbine was not identified.
The No. 13 Aux~
Feedwater Pump was last demonstrated operable on 12-29-76 during the performance of Surveillance Requirement 4.7.l.2(a)(l).