ML19282B923

From kanterella
Revision as of 17:26, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Reconsideration of Amends 46 & 47 Issued to Util Re Replacement of Steam Generators.Environ Impact Must Be Analyzed Based Upon Actual Release & Pathway Analysis. Complete Review Should Be Made of Potential Dangers
ML19282B923
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/20/1979
From: Alvarez B, Berick D
ENVIRONMENTAL POLICY INSTITUTE
To: Hendrie J
NRC COMMISSION (OCM)
References
NUDOCS 7903190034
Download: ML19282B923 (2)


Text

a.nw=a go .ato28I e

s.

ma wat .

,, Environmental Policy Institute 317 Pennsylvania Ave. S.E. Washington, D.C. 20003 pgLIC 202 m m S;4 -

DogU3IEg frcd 3 February 20, 1979 / tb Hon. Joseph Hendrie, Chairman m 3 3

U.S. Nuclear Regulatory Co= mission T kg "

1717 H Street, N.W.

Washington, D.C. 20555 O

tr g

N.f m.

g0 /gb i ,

Dear Comissioner Hendrie:

g 8

The Environmental Policy Institute requests that the Comission reconsider the issuance of Amendment Nos. 46 and 47 to Facility Operating License Nos, DPR-32 and DPR-37 issued to Virginia Electric and Power Com-pany (VEPCO) for replacement of the steam generators at Surry Power Station Unit Noe. 1 and 2.

We request review of the procedures by which the amendments were granted and the convening of a public hearing on the amendments. Notice of the proposed issuance of the amendments (44 FR 4057, January 19, 1979) was published only one day prior to the actual issuance of the amendments which were effective i= mediately upon issuance. Notice of issuance, which took place on January 20, 1979, was not published until January 29, 1979 (44 FR 5735) .

We request review of the negative declaration made in the Environ-mental l= pact Appraisal issued January 20, 1979 concerning the steam generator replacement and request the completion of a full environmental impact statement. The Appraisal rejected analysis of the radiologic impact made by Battelle Northwest Laboratories published as NUREG/CR-0199 " Radio-logic Assessment of Steam Generator Removal and Replacement." The Appraisal found that differences between VEPCO's analysis and NUREG/CR-0199 of =an/

rem occupational exposures could be easily reconciled. NUREG/CR-0199 clearly notes that it considered both the VEPCO and Florida Power and Light analyses of steam generator replacement and that the substantial differences remained in the analysis. The Commission accepted without qualification VEPCO's estimate of 2,070 man / rem per unit while NUREG/CR-0199 showed potential exposures to be between 3,380 man / rem and 5,840 man / rem per unit. Furthermore, the Commission compared the occupational exposure to exposures encountered with repair and maintenance of defective steam genera-tors, rather than with normal maintenance exposures,to justify high exposures.

Finally, the Comission in its negative declaration found that releases to the environment were expected to be less than those resulting from normal operation and therefore they were without significant i= pact. The Com-mission must analyze the environmental impact based upon actual release and pathway analysis and not by comparison to normal operation.

We request that no steam generator replacement activities be ap-proved until the pending transient worker exposure regulations are promulgated (43 FR 4865, February 6,1978, Proposed Rule) . The 3,380 man / rem to 5,840

=an/ rem per unit occupat1onal exposure estimates made in NUREG/CR-0199 represent extremely high exposure rates. These estimates, extended over the tf 79031900M emn,,a en rec.ci,a g g.,

7 Surry units and Florida Power and Light's Turkey Point plant and Consun s Power's blisades plant, which have applications pending for steam geners-tor replacenent, represent a very large number of transient worker exposures.

Finally, we request a complete review of the Commission's treat-ment of steam generator repair and replacement activities at pressurized water reactors. This review should be exrended to include expected steam generator repair and replacement exposures over the lifetime of these units and design requirements to reduce steam generator maintenance exposures.

Sincerely, ','

3 .- , /

,[. C '. - < , . _ ; r [~

David Berick

/

Bob Alvarez DB:ejw cc: Hon. Gary Hart Hon. Morris K. 5dall>-