ML20003B663

From kanterella
Revision as of 09:34, 30 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Deficiency Rept Re Inadequate Qa/Qc Procedures for Cable Installation,Initially Reported on 810116.Thirty-two Hatfield Electric Procedures Have Been Revised Re Installation of Class IE safety-related Cable
ML20003B663
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/17/1981
From: Tramm T
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8102250115
Download: ML20003B663 (3)


Text

e 4

. . . E' '

s. v> C:mm:nwarlth Edis:n  !

7-

- } Pj ons F rst Neona Pi'za. C5cac3. luirsois

2. . t 5 Address Reciy to Post Othce Box 767

.' Q CNeago, lihnois 60690 l

- l 4

E February 17, 1981 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Byron Station Units 1 and 2 i Cable Installation Oeficiency Report  ;

NRC Docket Nos. 50-454 and 50-455

Dear Mr. Keppler:

On January 16, 1981, Commonwealth Edison Company notifi'ed Mr. J. E. Konklin of your of fice tnat certain electrica1 installation activities at Byron appeared to involve deficiencies

~

reportable pursuant to 10 CFR 50.55(e). This letter fulfills the thirty-day reporting requirement of 50.55(e) regarding that item.

Description of the Deficiency NRC Region III inspectors have pointed out that the QA/QC procedures, checklists, and surveillances presently used at Byron by Hatfield Electric and Commonwealth Edison are not adequate to assure proper cab _a installation.

Analysis of Safety Implications Installation of cables according to those proceoures did not provide acequate assurance that Class IE caules were installed according to the established cesign criteria.

Corrective Action Thirty-two Hatfield Electric procedures have been revised to include and Clarify items within those procedures that are required to ensure that Class IE safety-related cable installation will be done .in accoroance with established QA and engineering criteria. A list of the procedures that were revised is includeo g/p here as Attachment 1.

3

/[

8102250h6 5

1 M These revised Hatfield Electric procedures were reviewed by NRC Region III inspectors on January 29, 1981, and were found to be adequate. In addition, Commonwealth Edison QA procedure QP 15-1 has been revised and was found to be adequate by Region III inspectors.

Please address any questions that you have regarding this matter to my office.

Very truly yours, Y{2, fA&c^=

T. R. Tramm Nuclear Licensing Administrator Pressurized Water Reactors Attachment cc: Director of Inspection and Enforcement .

""q_

4

,... 04n0Q

Attachment 1 Revised Hatfield Electric Company Procedures Procedure Rev. Issue Title 1 4 2 6 1 Method of Preparing Procedures 1

3 5 1 Installation of Class I Embedded Conduit Installation of Class I Underground Duct Runs 4 6 1 Orawing Control 5 4 1 Class I Material and Equipment Receiving and Inspection 6 4 1 Reporting of Damaged or Nonconforming 7

Material or Equipment 7 2 9A 9 Electrical Design Change 98 6 1

1 Class I Cable Pan Hanger Installation 9E 6 1 Class I Cable Pan Installation 10 8 Class I Cable Pan Identification 11 6 1

1 Class I Cable Installation 12 5 1 Class I Cable Termination and Splicing 12A 2 Installation of Class IE Equipment 128 2 1

1 Modification of Class IE Equipment Installation of Diesel Generater 1200A 13C 2 Class IE Non-segregated Pnase Bus 1

13AA- 2 1 Class I Cadweld Procedures Class I Shielded Metal Arc Field Welding 13AB-(AWS Prequalified) 2 1 Class I Shielded Metal Arc Field Welding 13AC 1 (Qualified by. Test)-

13AD 2 1

Qualification of Welders 13AE 2 1 Arc Welding Electrode Control 1

14 5: 1 Class I Visual Weld Examination Procedure Handling and Storage of Safety Related

16 5 Material and Equipment 1 Cable Storage and Handling 19 4 1 20 5 Equipment Turnover Reporting 1

23 8 1 Class I. Exposed Conduit System Installation 25 1 1 Concrete Expansion Anchor Installation 26 3 .1 Class I Installation of A 325 Bolts 27'

' Steel Stud Welding 2 1 Replacement of Gaskets on NAMCo EA-180 28 1 Limit Switches 1

Removal of Heat Shrink Tubing on Conax 29 3 1 Penetration Assemblies-30 3 Field Initiated Request for Design Changes 1 Class I Cable Exposed to Construction Activities

.