MONTHYEARML20217F9701999-10-14014 October 1999 Proposed Tech Specs,Incorporating ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plate Intersections ML20217E4301999-10-12012 October 1999 Proposed Tech Specs,Revising Requirements for Containment Penetrations During Refueling Operations ML20211M7341999-08-30030 August 1999 Marked-up & Revised TS Pages,Providing Alternative to Requirement of Actually Measuring Response Times ML20211K1721999-08-30030 August 1999 Proposed Tech Specs,Providing Clarification to Current TS Requirements for Containment Isolation Valves ML20209B7731999-06-30030 June 1999 Proposed Tech Specs Updating Requirmements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196F2211999-06-24024 June 1999 Proposed Tech Specs Pages for Amend to Licenses DPR-77 & DPR-79,allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20196G4701999-06-24024 June 1999 Proposed Tech Specs Pages Re Amends to Licenses DPR-77 & DPR-79,revising TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20196G7961999-06-22022 June 1999 Proposed Tech Specs Bases,Clarifying Proper Application of TS Requirements for Power Distribution Systems & Functions That Inverters Provide to Maintain Operability & Providing Updated Info on Cold Leg Injection Accumulators ML20196G8071999-06-22022 June 1999 Revs to Technical Requirements Manual ML20195E9841999-06-0707 June 1999 Proposed Tech Specs,Increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20206E1611999-04-29029 April 1999 Proposed Tech Spec Change 99-04, Auxiliary Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20206E1391999-04-29029 April 1999 Proposed Tech Spec Change 99-03, Main Control Room Emergency Ventilation Sys Versus Radiation Monitors. Changes Add LCOs 3.3.3.1 & 3.7.7 to Address Inoperability of Radiation Monitoring CREVS & NUREG-1431 Recommendations ML20204E8501999-03-21021 March 1999 Plant,Four Yr Simulator Test Rept for Period Ending 990321 ML20204H4081999-03-19019 March 1999 Proposed Tech Specs,Relocating TS 3.8.3.1,3.8.3.2,3.8.3.3 & Associated Bases Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20207D6331999-02-26026 February 1999 Proposed Tech Specs Providing for Consistency When Exiting Action Statements Associated with EDG Sets ML20207D6011999-02-26026 February 1999 Proposed Tech Specs Relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20206S0131999-01-15015 January 1999 Proposed Tech Specs 3.3.3.3, Seismic Instrumentation & Associated Bases,Relocated to Plant Technical Requirements Manual ML20199K6001999-01-15015 January 1999 Proposed Tech Specs Adding New Action Statement to 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Appropriate Overall Level of Protection ML20195H6111998-11-16016 November 1998 Proposed Tech Specs Revising EDG SRs by Adding Note That Allows SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Certain Lockout Features Prevent EDG Starting ML20154H7251998-10-0808 October 1998 Proposed Tech Specs Pages,Supplementing Proposed TS Change 96-08,rev 1 to Add CRMP to Administrative Controls Section & Bases of TS ML20238F1091998-08-27027 August 1998 Proposed Tech Specs Providing for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20238F3001998-08-27027 August 1998 Proposed Tech Specs Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of EDGs ML20209J1631998-08-0707 August 1998 Rev 41 to Sequoyah Nuclear Plant Odcm ML20236G5961998-06-29029 June 1998 Proposed Tech Specs Typed Pages for TS Change 95-19, Section 6 - Administrative Controls Deletions ML20249C6371998-06-26026 June 1998 Proposed Tech Specs Lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248F0051998-05-28028 May 1998 Proposed Tech Specs for Section 6, Administrative Controls Deletions ML20217N3511998-04-30030 April 1998 Proposed Tech Specs Pages,Modifying Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1681998-02-25025 February 1998 Proposed Tech Specs Pages,Revising EDG Surveillance Requirements to Delete Requirement for 18-month Insp IAW Procedures Prepared in Conjunction W/Vendor Recommendations & Modify SRs Associated W/Verifying Capability of DGs ML20202J7651998-02-13013 February 1998 Technical Requirements Manual ML20202J7141998-02-13013 February 1998 Proposed Tech Specs Adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20202J6961998-02-13013 February 1998 Proposed Tech Specs Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20202J7601998-02-13013 February 1998 Proposed Tech Specs Section 3.7.9 Re Relocation of Snubber Requirements ML20198T4311998-01-21021 January 1998 Proposed Tech Specs Re New Position Title & Update of Description of Nuclear Organization ML20199F8231997-11-30030 November 1997 Cycle 9 Restart Physics Test Summary, for 971011-971130 ML20199K4571997-11-21021 November 1997 Proposed Tech Specs Adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20211A3191997-09-17017 September 1997 Proposed Tech Specs Re Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20203B9731997-08-0505 August 1997 Rev 1 to RD-466, Test & Calculated Results Pressure Locking ML20217J5581997-07-31031 July 1997 Cycle Restart Physics Test Summary, for Jul 1997 ML20210J1671997-04-30030 April 1997 Snp Unit 1 Cycle 8 Refueling Outage Mar-Apr 1997,Results of SG Tube ISI as Required by TS Section 4.4.5.5.b & Results of Alternate Plugging Criteria Implementation as Required by Commitment from TS License Condition 2C(9)(d) ML20137T0871997-04-0909 April 1997 Proposed Tech Specs Re Elimination of Cycle 8 Limitation for SG Alternate Plugging Criteria ML20137M8581997-04-0101 April 1997 Proposed Tech Specs 2.1 Re Safety Limits & TS 3/4.2 Re Power Distribution Limits ML20137C8421997-03-19019 March 1997 Proposed Tech Specs Re Conversion from Westinghouse Electric Corp Fuel to Framatome Cogema Fuel ML20136J0381997-03-13013 March 1997 Proposed Tech Specs Section 5.6.1.2,revising Enrichment of Fuel for New Fuel Pit Storage Racks ML20134P8631997-02-14014 February 1997 Proposed Tech Specs Requesting Discretionary Enforcement for 48 Hours Which Is in Addition to 72 Hours Allowed Outage Time Provided by TS Action 3.8.1.1.b ML20134K9981997-02-0707 February 1997 Proposed Tech Specs Revising TS Change Request 96-01, Conversion from W Electric Corp Fuel to Framatome Cogema Fuel (MARK-BW-17), to Ensure That Core Analysis Computer Code Output Actions Are Consistent W/Hot Channel Factor SRs ML20138F2581997-01-17017 January 1997 Rev 39 to Sequoyah Nuclear Plant Odcm ML20134L9261996-11-0808 November 1996 Proposed Tech Specs Re Placing of Channel in Trip for Reactor Trip & Engineered Safety Feature Instrumentation Sys Solely to Perform Testing as Not Requiring Channel to Be Declared Inoperable ML20129D2661996-10-18018 October 1996 Proposed Tech Specs,Removing Existing Footnotes That Limit Application of Apc for Plant S/G Tubes to Cycle 8 Operation for Both Units ML20129G7301996-09-26026 September 1996 Proposed Tech Specs 3/4.3.3 Re Fire Detection instrumentation,3/4.7.11 Re Fire Suppression Systems & 3/4.7.12 Re Fire Protection Penetrations ML20134J9991996-09-23023 September 1996 Fuel Assembly Insp Program 1999-08-30
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20196G8071999-06-22022 June 1999 Revs to Technical Requirements Manual ML20209J1631998-08-0707 August 1998 Rev 41 to Sequoyah Nuclear Plant Odcm ML20202J7651998-02-13013 February 1998 Technical Requirements Manual ML20138F2581997-01-17017 January 1997 Rev 39 to Sequoyah Nuclear Plant Odcm ML20134J9991996-09-23023 September 1996 Fuel Assembly Insp Program ML20138F2531996-02-23023 February 1996 Rev 38 to Sequoyah Nuclear Plant Odcm ML20108B4121995-11-0303 November 1995 Rev 37 to Sequoyah Nuclear Plant Odcm ML20094Q2301995-10-30030 October 1995 ASME ISI Valve Testing Program Basis Document, Rev 0 ML20094Q1931995-10-30030 October 1995 Rev 1 to ASME Sys Pressure Testing Program Basis Document ML20094Q1971995-10-30030 October 1995 Rev 1 to SG Tubing ISI & Augmented Insps, Rev 1 to 0-SI-SXI-068-114.2 ML20094Q2111995-10-30030 October 1995 Rev 1 to ASME ISI Pump Testing Program Basis Document ML20094Q1761995-10-13013 October 1995 ASME Section XI Isi/Nde & Augmented Nondestructive Exam Programs, SSP-6.10,rev 2 ML20094Q1841995-10-13013 October 1995 ASME Section XI Isi/Nde Program Units 1 & 2, Rev 0 to 0-SI-DXI-000-114.2 ML20149L6811994-09-30030 September 1994 Concerns Resolution Program - Sequoyah Nuclear Plant ML20063D6691994-01-24024 January 1994 Rev 4 to Sequoyah Nuclear Plant Restart Plan ML20065Q6251993-10-13013 October 1993 Rev 31 to Sequoyah Nuclear Plant Odcm ML20056F3181993-08-20020 August 1993 Rev 0 of Post-Restart Plan ML20056G1841993-08-10010 August 1993 Rev 2 to Sequoyah Nuclear Plant Restart Plan ML20044F3081993-05-20020 May 1993 Rev 0 to Sequoyah Nuclear Plant Restart Plan. ML18036B1961993-01-27027 January 1993 Rev 2 to Nuclear Power Training Procedure TRN-31, Fire Brigade Training. ML20127P5461992-12-16016 December 1992 Rev 20 to Surveillance Instruction SI-114.1, ASME Section XI ISI Program,Unit 1 ML20127P6361992-12-16016 December 1992 Rev 19 to Surveillance Instruction SI-114.2, ASME Section XI ISI Program,Unit 2 ML20114C8131992-04-17017 April 1992 Rev 27 to Odcm ML20101F2081992-02-0808 February 1992 Rev 16 to Surveillance Instruction SI-114.2, ASME Section XI ISI Program Unit 2 ML20101F2011992-02-0808 February 1992 Rev 17 to Surveillance Instruction SI-114.1, ASME Section XI ISI Program Unit 1 ML19332D2241989-09-22022 September 1989 Rev 23 to Odcm. ML20245H1421989-08-15015 August 1989 Rev 22 to Offsite Dose Calculation Manual Changes ML20246H4861989-05-16016 May 1989 Rev 1 to Technical Instruction TI-115, Instructions for Sewage Mgt ML20244E2521989-04-28028 April 1989 Rev 14 to Surveillance Instruction SI-114.2, ASME Section XI Inservice Insp Program ML20246E7771989-04-25025 April 1989 Rev 14 to Surveillance Instruction SI-114.1, ASME Section XI Inservice Insp Program ML20206D3421988-10-15015 October 1988 Rev 13 to Surveillance Instruction SI-114.2, Inservice Insp Program ML20154J3221988-09-0909 September 1988 Procedure EA-OR-003-S, Sequoyah Nuclear Plant - Unit 1 Design Baseline & Verification Program,Supplemental Engineering Assurance Oversight Review Rept ML20150F9291988-06-17017 June 1988 Diesel Generator Voltage Response Improvement Plan ML20154L1421988-05-0909 May 1988 Rev 3 to Revised Sequoyah Nuclear Performance Plan ML20153H3891988-03-30030 March 1988 Rev 19 to Sequoyah Nuclear Plant Offsite Dose Calculation Manual ML20196G3301988-02-24024 February 1988 Limited Test Program for Determining Axial Load Capacity of Cast One-Hole Conduit Clamps ML20147E9511988-01-21021 January 1988 Revised, Procedures Generation Package ML20153H3851988-01-0505 January 1988 Rev 18 to Sequoyah Nuclear Plant Offsite Dose Calculation Manual ML20147E5691987-12-17017 December 1987 Rev 4 to Special Maint Instruction SMI-0-317-61, Instrumentation Features Walkdown,Rework & Insp Instructions for CAR 87-014 ML20237C5451987-10-28028 October 1987 Rev 17 to Offsite Dose Calculation Manual ML20236E6931987-10-17017 October 1987 Rev 2 to Engineering Organization & Operating Procedures, TVA Employee Concerns Special Program ML20235X0551987-10-10010 October 1987 Rev 0 to Sys Operating Instruction SOI-74.2, Removal of RHR for Repair of 2-FCV-74-2 ML20235X0651987-10-10010 October 1987 Rev 0 to Special Maint Instruction SMI-2-74-1, Repair of 2-FCV-74-2 ML20237H2051987-08-28028 August 1987 Rev 0 to Civil Engineering Branch Instruction CEB-CI 21.89, Mod Priorities for Pipe Supports on Rigorously Analyzed Category I Piping - Sequoyah Unit 2 ML20207G5821987-08-24024 August 1987 Rev 14, Balance of Plant Temp Monitoring Sys ML20237L3651987-08-21021 August 1987 Unit 2,Regeneration of Support Design Calculations on Rigorously Analyzed Piping,Program Plan ML20236Q1771987-08-0707 August 1987 Rev 9 to Surveillance Instruction SI-114.1, ASME Section XI Inservice Insp Program. Rev Corrects Deficiencies Shown in Caqr CH5870006 & CH5870010,adds Punchlist & Incorporates Icf 87-708 ML20236N7601987-08-0606 August 1987 Revised Radiological Emergency Plan Implementing Procedures, Including Rev 13 to IP-8, Personnel Accountability & Evaluation & Rev 6 to IP-15, Emergency Exposure Guidelines ML20236M7181987-07-28028 July 1987 Rev 1 to WP-17-SQN, Vendor Weld Quality, Welding Project, TVA Employee Concerns Special Program ML20236M7351987-07-24024 July 1987 Rev 5 to 80503-SQN, Document Distribution Control, Element Rept,Tva Employee Concerns Special Program 1999-06-22
[Table view] |
Text
a
- ENCLOSURE
- - Sequoyah Nuclear Plant DISTRIBUTION
. . IC Plant Master File
[ Plant Superintendent ts Assistant Plant Supt. (Oper.)
SURVEILLANCE INSTRUCTION Assistant Plant Supt. (Maint.)
Assistant Plant Supt. (H&S) f SI-114 1C Administrative Supervisor Maintenance Supervisor (M)
_ IC Assistant Maintenance Supervisor (M)
Maintenance Supervisor (E)
Assistant Maintenance Supervisor (E)
PRESERVICE BASELINE INSPECTION FOR Maintenance Supervisor (I)
TENNESSEE VALLEY AUTHORITY IU Results Supervisor SEQUOYAH NUCLEAR PLANT IC Operations Supervisor
\c- Quality Assurance Supervisor d Health Physics Supervisor i
Public Safety Services Supv.
Chief Storekeeper Preop Test Program Coordinator
[ Units 1 & 2 IC Outage Director
- l Chemical Engineer (Resul'ts)
Radiochem Laboratory Instrument Shop Reactor Engineer (Results)
Instrument Engineer (Maint. I)
_) C Mechanical Engineer (Results)
IU Plant Services Supervisor IC Training Center Coordinator i, Prpared By:
Belew/Daniels Public Safety Services SNP Shift Engineer's Office L Revised By: Dan Gorman 1C Unit Control Room Health Physics Laboratory Submitted By: v0 ^#l&,1 lu Nuc1r Document Control unit-C
- q. -Supervisor IU Pwr Plant Superintendent, WBNP Pwr Plant Superintendent, BFNP PORC Review: 4, g j/a j Pwr Plant Superintendent, BENP Batt IU NEB-K NRC-IE:II Approved By: ,m ( N Resident NRC Inspector SNP Plant Manager 1C NSRS-K
" Technical Support Center Date Approved: d[//8j/8/ IC Unit Control Room #2
/ '
IU Compliance Section Staff Supervisor IU QCRU - CONST SNP 1U Project Manager, Seq.
IU _ Supv. Codes and Standards Sect.-C IU Stup, Metalurgy & NDT Section, 505 EB-C Rev. No. Date Revised Pages Rev. No. Date Revised Pages 11 4/21/81 ALL 12 6////B/
/ I 3,5,27 4
The.last page of this instruction is Number 221
~
.~ 8107280527 010721 PDR ADOCK 05000327 G PDR _
'j . .
.J
SI-114 7 Page 1 of 32 j Rev.-12 s
1.0 STATEMENT OF APPLICABILITY This program outlines details for performing the preservice nondestructive examinations of the Sequoyah Nuclear Plant ASME Code Class 1, 2, and 3 com- -
j i-1.,nents (and their supports). The program has been organized .to fulfill
.) .
prese.vice examination requirements of the Sequoyah Operational Quality Assurance Manual, Part II, Section 5.1 and comply as practical with the ,
[ ,
requirements of Section XI of the ASME Boiler and Pressure Vessel Code.
" In accordance with 10 CFR Part 50, 50.55a(g)(1), a preservice inspection is r.o t. required for Sequoyah. However, the areas outlined in this program to receive a preservice inspection will be examined. The requirements of.
ASME Section XI are in effect when the requirements of the applicable con-struction code have been satisfied.
e j The requirements of this program are in effect until unit commercibi operation. -
y4 -Beginning with unit commercial operation, the requirements of the Inservice Inspection Program are applicable in accordance with 10 CFR 50 section 50.55
- s. a (g) (4) (i) and section 50.55 a (g) (4) (iv). .
A Specifics concerning performance of. nondestructive examinations are not a part of this program, but are included in nondestructive examination
) procedures (DPM N80E3 and SNP TI-51). .
2.0 PURPOSE
]
' 'J The Preservice Inspection Program (hereinafter PSI) is preliminary in nature and is employed to obtain detailed information for inclusion. in the Inservice Inspection Program. The examinations required by.this
'l program will establish acceptance of components for service. .In addition,
- l. -
this program partially satisfies the preservice requirements of SR 4.0.5, 4.4.5, and 4.4.10.
The PSI Program serves as a means of determining built-in limitations caused by original plant design, geometry, materials of construction of the components, and the current technology or state-of-art -of nondestructive
.! testing. The PSI Program will also permit verification of the examination methods selected, finalization of detailed procedures, and will establish preservice examination data to be used as a reference for later-inservice-j examinations.
2 3.0 CODES OF RECORD 1
This program w^as prepared to meet the requiremei..s of the 1974 Edition, Summer Criteria 1975 Addenda of Section XI of ASME Boiler and Pressure Vessel Code.
3 for determining Class 2 pressure retaining bolting subject to
'y . examination is in accordance with the 1977 Edition, Summer 1978 Addenda of Section XI. Criteria for determining components subject to system pressure tests following repair by welding is in accordance with the
}
9
~
Summer 1978 Addenda of Section XI. Procedures-for Eddy Current Examination of heat exchanger tubing, which the Summer 1975 Addenda of ASME Section XI has no provisions for, meets the requirements of the 1974 Edition, Summer 1976 Addenda of ASME'Section XI. Steam generator tubing examination require-
}] . ments'are in accordance with Regulatory Guide 1.83, Rev. 1.
G
.- - - - _ - - ._ _ , .,. - . -. . - , - - _ , . a..-..- _ . . .-
( . .
L SQNP
- SI-ll4 Page 3 of 32 Rev. 12 Certain examinations performed in shop and/or by CONST will be identified by the Metallurgy and Standards Group and employed to serve for the ASME Section XI PSI. In these instances, a member of the NCO QA Staff may perform a random sample review of CONST data packages and/or may obtain shop records to assure that examinations have been performed. CONST g
~
- c. . ..._-' ~ nrocedures may be obtained by the NCO QA Staf f for reference.
~
[ Whenever inspection requirements are being accomplished under the juris-t diction of NUC PR, a NCO QA Staff representative shall be onsite to coord-inate activities. He will be the designated TVA representative to ensure g
contract compliance and to ensure proper disposition of needed procedure changes to both TVA and/or contractor procedures in accordance with approved vendor QA program and Section 6.3, Part II of the 0QAM.
Additionally, the NCO QA Staff representative will be responsible for) ,
L notifying the Plant Manager of all unacceptable indications as soon a's
' practical. Whenever an unacceptable indication is discovered, the procedure and form in Appendix D shall be utilized. In those cases where an outside contractor is furnishing preservice examination services, it will be the responsibility of the contractor to initiate the form in Appendix D under the supervision of the NCO QA Staff representative. See section 16.0 of this program,
- i. As examinations are completed, the NC0 QA Staff representathe shall sign for completion the appropr' ate sections of Data Sheet 2 in Appendix C of m
this program. When all examinations of this progran have been completed, Data Sheet 2 shall be signed for completion by the NCO QA Staff represen-tative and reviewed by the Supervisor, Baseline and Inservice Inspection
(
[
Section, QA Staff. In the event system or component alterations or repairs are made which require component reexamination, or components are re-examined for other reasons, following signoff of Data Sheet 2,- the appropriate sections of Data Sheet 3 in Appendix C shall be completed and signed by the NCO QA Staff representative. (The requirements of this paragraph pertain to unit 2 only.)
1 All preservice examinations should-be completed prior to initial plant start 2p (Operational Mode 2) . Prior to initial plant startup, Data Sheet 3, in addition to Data Sheet 2, in Appendix C shall be signed by the NCO QA Staff representative and reviewed by the Supervisor, Baseline and Inservice i
Inspection Section, QA Staff and the Supervisor, Codes and Standards Section of the Metallurgy and Standards Group. The Plant Manager shall approve the data package (Data Sheets 1, 2, and 3) by signing Data Sheet 1. These data sheets shall be filed at the plant site with PSI examination data and final reports discussed in Section 15.0 of this program. (The requirements of this
, Paragraph pertain to unit 2 only.)
m PSI program preparation is the responsibility of Metallurgy and Standards l Group of the Controls and Test Branch. Any revisions initiated by other
" groups shall be submitted to the Metallurgy and Standards Group for informal approval prior to incorporating the revisions into this program.
j m l
,. . .. , s l
SQNP
. .. - SI-ll4 Page 25 of 32 Rev. 12
~
11.5 Volumetric Examination (Ultrasonic) ,
1 l Ultrasonic examination shall be conducted in accordance with the provisions of Appendix I of Section XI of the ASME Code. Where t-Appendix I (I-1200) is not applicable, the provisions of Article 5 of Section V of the ASME Code shall apply.
11.6 Volumetric Examination (Eddy Current)
Eddy current examination of heat exchanger tubing shall be conducted 4 in accordance with the provisions of Appendix IV of Section XI of the 1
ASME Boiler and Pressure Vessel Code (Summer 1976 Addenda).
12.0 QUALIFICATIONS OF NONDESTRUCTIVE EXAMINATION PERSONNEL i
(:) I f Personnel performing nondestructive examination operations shall bei qualified in accordance with IWA-2300 of ASME Section XI (DPM N75C01).
CONST personnel which perform visual examinations in accordance with this program need not bc gualified in accordance with IWA-2300.
13.0 ACCEPTANCE CRITERIA All acceptance standards for Class A, B, C, and D components shall 1
i_
be in accordance with IWA-3000 of ASME Section XI.
L 14.0 REPAIRS AND REPLACEMENTS 7 Repairs shall be made in accordance with ASME Section XI or in accordance with
-t the Design Specification and Construction Code of the component or system.
y Later editions of the Construct...n Code or Section III, either in its y extirety, or portions thereof, may be used.
After repairs by welding on the pressure-retaining boundary of components, a pressure test shall be performed in accordance with IWA-5000 and IWB-5000, IWC-5000, or IWD-5000 as applicable of ASME
, Section XI. The following may be exempted from these pressure tests exclusive of those repairs employing a temper bead technique:
(1) Cladding repairs (2) Heat e:: changer tube plugging (3) Piping, pump, and valve repairs that do not penetrate through the pressure boundary h*
pg .
>=