Rev 14, Balance of Plant Temp Monitoring Sys
ML20207G582
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/24/1987
From: Lake B
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20207G494 List:
References
SI-606, NUDOCS 8808240166
Download: ML20207G582 (14)


Text

_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _

. I TENNESSEE VAL. LEY AUTHORITY .l 3EQUOYAH i:UCLEAR PLANT  ;

, i t

i SURVEILLANCE INSTRUCTION SI-606 3ALANCE OF DLANT TEMPERATURE MONITCRING SYSTEM Units 1 and 2  !

t Revisten 14  ;

PREPARED BY: Ben Lake t RESPONSIBl.E SECTION: Operations  ;

I REVISED BY: Rick O' Rear SUSHITTED 8 : .k,/A ~ u for pensible Sectioh Supervisor j PORC REV! DATE: AUG 2 4.@7, . , 7,. - l APPROVED BY: I Pla'nt Manager DATE APPROVED: E0 l A W - ,

Reason for revision (include all Instruction Change Form Nos.):

r Revised in accordance with ICF 87-1286, PORC reviewed and approved 08/03/87.

l The last page of this instruction is number: 9  :

f Atch,m at b6..).? L et t. I. $.I f

$ Sp$$0ck fQs; Lcw fo'H=n';!*

1 - ' *';*.y;- - -)

_ l PW.

l e en _ . -

  • SEQUOYAH NUCLEAR PLANT -

PLANT INSTRUCTION REVISION LOG SURVEILLANCE INSTRUCTION SI-606 REVISION Oate Pages REASON FOR REVISION (INCLUDE CCMMIT-LEVEL Aoproved A'fected MENTS AND ALL ICF FORM NUMBERS) 0 10/17/79 All 1,2,5, .

1 08/26/80 Add 2A 2 10/29/80 3.4.5 3 01/13/81 5 -

4 08/11/81 All 5 11/16/81 1,5 6 12/30/8 5,6 7 05/26/82 3,6 8 07/29/82 6 -

All,iltle l' < "

9 09/22/82 Change 10 12/03/82 3,6 ,

  • 11 01/25/83 6 Revised to correct data package cover sheet to comply with SI-1, Appendix F, requirements. Rearranged and redesigned data sheet for clarity. The Appendix F 12 05/11/87 All. constitutes a biennial review. '

Revised to add data sheet to take dis-charge press'Jre readings frcm MCR and 1,2,7, Elec. Bd. Rm. AHU A & b. TACF 0-87-0010-13 07/20/87 Added 9 67. WP 12509 Revised in accordance with ICF 87-1286, 14 p(y 3' d) (t jC[{f.2,9 PORC reviewed and approved 08/03/87.

Ano:hment N1.3 0 Sheet of _ f.,

Lwp #/l&ntifier / - 4 5- 8? - 4 /

0024:/ SAT /ttr

SQil SI-606 Page 1 Revision 13 3ALANCE OF PLAtli TEMPERATURE MONITORING PRCCRAM 1.0 SCC 3E 1.1 This test consists of verifying the temperature of specific areas in aurillary building, diesel generator building, ERCH Oumoing sta: a. and main control room and to record condenser disenarge pressure on the operating MCR and EBR cn111er packages.

1.2 Recuirements 1.2.1 . Purpose - To verify the temperature at specific areas by visually reading and recording dry bulb air temoeratures are within limits as indicated on the data sheets. This is'to collect data for history of area temperatures where ESF equipment is located.

1.2.2 Purpose - To record condenser discharge pressure on the operating MCR and EBR chiller packages once a shift.

1.2.3 Tech Specs - None 1.2.4 Mode operability requirement - N/A 1.2.5 Performance Mode (s) - All 1.2.6 Scheduling - No concurrent SI's 1.2.7- Frequency - Once per shift.

1.2.8 Additional Manpower Requirements - 1 AVO (= 11/2 hrs per shift) ' '"

2.0 PRECAUTIONS 2.1 AVO should wait at each location until the temperature Indication has stabilized before recording the' temper'ature.

3.0 REFERENCES

3.1 Memo from R. H. Dunham to H. S. Fox dated April 20, 1979 (MEB 790423 383).

3.2 Memo from H. N. Sprouse to .1. R. Calhcun dated July 9, 1980 (NEB 800709 264).

3.3 Lettet from H. Seano of Westinghouse to D. R. Patterson on UHI system dated June 20, 1978. -

3.4 Westinghouse scoping document TVA/ TEN SU 5.6.2 dated August 1978, Rev. 1.

3.5 Hero frem H. N. Sprouse to H. J. Green dated May 19, 1982 (NEB 820519 277).

3.6 TACF 0-87-0010-67 and HP 12509. ^"C:h** NO - Sheet 1 of 6 Loop #/ldentifier I- M' 9'1' % I 0159z/dar A

,s,

\

j

, SON ,

SI-606 -

Page 2 -

Revision 14 4.0 INSTRUCTIONS 4.1 Record on data sheet 1 the temperature at the locations listed on loca'eton sheet-1. Use a digital temperature indicator or thermometer to measure temperatures.

4.2 If any local temperature exceeds its limit as listed on data sheet -1, page 1, record out of Ilmit temperature every hour on data sheet -1, page 2 until temperatures are within limits.

Record time and temperature reading each hour. Notify the Shift Engineer the first time the reading is determined to be out of -

limits and notify the SE again when the temperature is determined to be withtr. limits.

NOTE: Should any local temperature exceed its limit, attempt a to restore temperature to normal. High temperature may be indication of failed venttiation and cooling systems.

4.3 Inspect the Main Control Room and Electrical Board Room Cht11er packages once per shift. Log compressor condenser discharge pressure and adjust this pressure to 160 psig to 240 plig by adjustment of the ERCW manual discharge TCVs at each chiller package. Opening the TCV will decrease pressure; closing the TCV will increase pressure. These TCVs will normally be  :

throttled according to operating pressure requirements of the chiller package. I,*

Notify the Unit one SRO If any chiller package cannot be adjusted to within ilmits.

0-TCV-67-197 HCR Chiller Package "A" manual TCV .

0-TCV-67-201 HCR Chiller Package "B" manual TCV -

0 TCV-67-195 EBR Chiller Package "A" manual TCV 0-TCV-67-199 EBR Chiller Package "B" manual TCV

~

Atterhment No...F _ Sheet ,ofI

l. cap f/ identifier .. /*'+~ d'11 0159z/tir

SON

- SI-606 Page 4 Revision 12 LOCATION Of TEMPEAATURE IN0!CATOR Page 2 of 3 Location Numeer L0catien Aux Bldg, Elevation 749 Unit 2 side next to 6.9KV 480V TI-15 shutdCwn transformer 2A2.A Aux 111ary Butiding, Elevation 749, Unit 2 side next to T!-16 6.9KV 480V shutdown transfor er 2b2-8 Aux 111ary Building, Elevation 749 Unit 2 north end 480V Rx TI-17

' rov. bd. 232-8 Auxillary Building, Elevation 734, Unit 2 side behind stairs TI 18 col. S-A13 Auxiliary Butiding, Elevation 763, Unit 18 Mech. Equipt. Room T!-19 Auxillary Building, Elevation 763, Unit 2 8 Mech, Equipt. Room T!-20 -

Main Centrol - across from panel 1-M-9 T1-21 D.G. Room, next to 480V transfer switch TI-22 0/G Sullding 722, 28-8 for 125V DC 0 G. batt charger 28-8 0/G Building 7a0, south end 480V diesel aus, bd 281-8 TI-23 U1 Additional equipment b1dg Elevation 706 on column between 71-24 ,

U2 Additional Equipment Bldg. Elev. 706 on column between UH TI-25 accumulatort ERCW pumping station. Elev. 704, column between IA-A ERCW-MCC

'l-26 i

transformer and board train ERCW pumping station, Elev. 704, column between "8" T!-27 ERCW MCC transformers and boards ERCW pu W.ng station. Elev. 704, column between 2A-A ERCW-M 71-28 n .' transfor'.ers and board Process Computer Room, elevation 685, center of room near T1-29 column Attcchment No._10

_ shn,_ fer,,g_,

Loop #/ldentifier _ /- A 6- F1 */

0159H/ SAT /mit

$0W 5!-606 Page 7 Revision 13 .

Data Sheet 1

. Page 1 of 2 8ALANCE OF PLANT TEMPERATURE MONITO#1NG PROGRAM Oate

~ ~'

2300 0700 1500 REF. INSTRU. No. NOTE LIMITS 0700 1500 2300 REMARKS 4.1 TI-1 1 aloa'F __

TI-2 1 5104*r ~

  • TI-3 1 8104'F +

TI-4 1 5'04*F ~ ~ ~

T!-5 1 1104'F T!-6 1 5104'F ~ '~ ~ ~ " ~

T!-7 1 5104'F TI-8 1 3104'F '

.~

' ~ - ~

~ ~~

TI-9 1 1104*F " ^~ '

~ ~ ~ '

71-10 1 8104'F ~ " ' ' ~ ' -

TI-11 3104'F 1

TI-12 1 5104*r .

~

71-13 1 5104'F ._ ~~

T!-14 1 8104*F - -

~

T!-15 1 1104'F _

T!-16 1 5104'F " ~ ~

TI-17 1 5104'F TI-18 1 5104'T ~~~

TI-19 1 5104'F

. TI-20 1 8104*F ,

T!-21 1 8104'F '

T!-22 1 3120*F .J T! 23 1 8120*F T!-24 1, 3 >75'F(85'F T!-25 1. 3 >75'F<85'F q TI-26 1 1120'F _

TI-27 ,' 1 5120'F 1 TI-28 1 5120'F -

9 TI-29 2 265'F87 5'F f TI-30 4,5 380'F 8120'F 4,5 180*F3120'F

~

I T!-31 -~

i TI-32 '- 4,5 1 80'F 5120*F ~

TI-33 TI-34 4,5 2 80*F3120*F 4,5 380'F 5120'F ~

$ {$

TI-35 4.5 380*F3120'F TI-36 4,5 1 80*F8120'F

~~

~~~

S *.1 TI-37 4.5 3 80'F3120'F ,

h Operator's Initials: g

- - - - g Acceptance Criteria: Temperatures are within limits as indir.ated. < _!

IF not notify the S/E.

. 01592/dar ,

}

,* D2 VISION OF NUCLEAR rifGI*MhRINO (DN{ } ' SECITON zig '

M')UOYAH ENGIN.MRING cdCJe G * (5Q6P> JEQUOYAH CNGUiEER2NG PROCEDURE Pfd'ECT MNiUAL SqEP-09. REVISION 3 l

i j ,

ATTACHMENT 1 i

% PACE 1 0F 5 )

C!fMiGE REVIEW CHECKLIST FOR FLECTRICAL CALCULATIONS SECTION I O C R.

Change Document No. (ECN/DCN/FCR/PMP/ Drawing and Ro )254c. _, Unit Q Change Description $2 % $c5 _ EX i S TW6 LEyEL stof7CHEJ lJ- LS tt,22 pL1,

'2. A- ?DiTH S*<3 2. MoORL # /0 3 IIS - AB50 2= AIX - JITY x 4 Ocon this change involve a safety-related system? Yes /d<,/ No / /

- , Calculations Required Yes M No / /

. (Mark yes if any item in section II is marked "A") -

Revision 0: .

Change Review Preparer (CRP) NOVIf1 k Date 4/tt/U Change Review Checker (CRC) MN /4 *-

Date N k?-

f Project Principal Electrical Engince (PPEE) err: Te Tr m Date _ /2./88 F

Electrical Calculations Manager (ECM)- Date R1 R2 R3 R4 R5 R6 R7 FCR NO.:

CRP' 1 ..

CRC _

PPEE ,

ECM Justification for no Calculation Involvertent (If Applicable): __ '

f f/[. ',

~

,, .5 [ $_1, !7]JustificationPreparer Date

' - /-_ (S - lip 7- 2/

I -.. . .- . w l Justification Preparer Date 7

2920F

-m m e,? : t t essurpro

DIVISICF OF NUCLEAR ClGINEERING (DNE)

SECTION III SEQUOYAH ENGINEERING PROJECT (SQEP) SEQUOYAH UlGINEERING PROCEDURE SQEP-09, REV!SION 3 PROJECT t'.ANUAL 1

ATTACHMENT i PAGE 2 0F 5 C I ECN/DCN/FCR/PHP/Drr. wing and Aev. 3 d g. 2. f M6 Unit / , 2-SECTION II

)

Answer all questions in the checklist: N/A (Mark "N/A") indicates the question does not apply to an electrical change requiring corresponding calculations to support the design change; APPLICABLE (Mark "A") indicates question applies to an electrical change that requires.a corresponding

  • calculation to support the design change. References to~the FSAR, technical specifications, and/or design criteria should be written after each APPLICABLE item. If information is obtained from another discipline, indicate initials .

of the individual providing the input in the coordination colum:6. Detailed explanations should be provided on attachments as determined by the Change

. ,' Review Preparer. -

ELECTRICAL POWER EVALUATION

- COORDINATION / '

. APPLICABLE p'/6 __ REFERENCE

1. cable involvement? v ~'
a. Cable (s) added and/or deleted? v
b. Cable (s) size changed? V i

(- -

c. Cable (s) length changed? y
2. Electrical load involvement? v . . ,

~

a. Load (s) added and/or deleted?

size changed?

E u l b. Load (s)' demand changed? ~7

c. Lead (s) ~
d. Load efficiency (as related ..

to heat lu s! , *- g.

I Circuit protection involvement? v

3. ~

I a. Circuit breaker (s) setting changed' (long time, short time, l

! or instantaneous)? -

u

b. Overload heater (s) size u changed? _
c. Fuse size (s) changed? _

'C

d. Manufacturer (s) or type (a) -

4-changed?

U

e. Other: __

4 Electrical containment penetration ,

involved? E Electrical paran:eter(s) involved? v-5.

a. Nominal, maximum or minimum equipment rating (s) changed? g s

0 Attcchmxt No -. F Sheet 7 of I Lcco 'rilO :i!;ct /- LS 87 21 w-.cos 93:pt egst/g /r0

5 DIVISION OF NUCLEAtt ulGINEth1Nu (bH).) SECTION III* l e sEQUOYAH gxoINEEAING Ph0Jrc (:iyEP) HEQUOYAN ENGINEERING PROCEDURE PROJECT MANUAL SQEP-09, 'AEVI$ ION 3 ATTACEMENT 1 C PAGE O 0F 5 ECN/DCN/FCR/PHP/ Drawing and Rev. M 2.5k5 - Unit. f '2.

SECTION II (Continued) .

C00EDINATION/

AFFLICABLE 5/.A _ REFERENCE _

6. Operating modo (s) involved? ,V ----
a. Lead SI actuatedf y

=

b. Load process controlled? __ y
c. Load leanually operatedt zu
d. Time delay setting changet _
e. Will load auto reset after l

.. . loss of offsite povert V

7. Submerged equipment involved! E
8. Electrical separation involvesent? _ , y __
  • a. Are non-1E cables routed with >

1E eableef _

. . _V"

b. 'Is circuit power supply .

located in a harsh environment?

~

P

(. . c. Non-15 loe'd(s) supplied from 13 boards? - W

~

9. Appendix P. circun involved? .V _
10. . Vendor-supplied dataCreviseDor required? V _
, INSTRUMENTATION AND CONTROL EVALUATION ,

. s, : .

11. Is any instrument in the loop being replaced with an instrument of dif f erent aianutacturer or inodal numbert P
12. Is any instrument being added to the loopf P _ _
13. Is the loop beins reconfigured either electrically or mechanically?

In~cludingt

a. Instrument relocation ,\ttect.. n; ' . 3/

> . . 3 J f ..

(Prier.ary elements and sensors only, w g, :,,.,. .i:i:, _p t .7._ty. 21... ..

3 transmitters, AfDs, etc. This does not include' AUX INST RM.

( MCR or ACR devices.)

(1) Has room locaeion changedt _ y __

(2) Has instrument elevation changed? g

. 9 2820F

.. . - ..- -.a Dr13-d3CS 92 Pt 896T 4!'/PO TOTfL P.11

(

5 DIVISION OF NUCLEAR ENGINEERING (DNE) - ' -

SECTION III '

SEQUOYAH ENGINEERING PROJECT (SQEP) SEQUOYAH ENGINEERING PROCEDURE PROJECT MANUAL SQEP-09, REVISION 3 ATTACHMENT 1 C PAGE 4 0F 5 ECN/DCN/FCR/PMP/ Drawing and Rev. 2) d /R 2.54 5 Unit / , 7._

SECTION II (Continued) ~-

COORDINATION /

APPLICABLE N/A

_ REFERENCE

b. Sense lines .

- (1) Has sense line routing changed? _V (2) Have tao elevations changed? V (3) Has fill fluid changed? _

, c. . Cables (1) If device is inside con- .

tainmerrt, has cable length been changed? _V .-

  • 14. Has set point changed? g

~

15. Does the change affect p'rocess -

parameters including safety or .

operating limits, temperature, I pressure. flow, level, etc.? _V

16. Does the change affect environmental ,,

drawings? E

17. Has loop furiction, category or operating time changed? _V -
18. has seismic spectrum cha'nged? g
19. Other than listed above, will the I ,4 3.c -

5L._ .4 /

.cf 5 ..

change affe'et output of any  !,.,_, _ L. z g . g._2 /

l instrument in the loop? L_ ._. .. .....------.--.-.--J (Includes calibration procedures,

. rescaling of instruments, etc.) V '

20. Other Remarks .

LEVal

. At F. C M R. SeQP R')ld 04 . Tke PAuepr .S,c- Stu17 e.Hg.c Afx Bn lp & RetN.neco BY Ssk. MscEt # to 3 /M-88502-NX-J J T7"X A ( Ghn n 3[T M UT of 8' 7~ l fu H, o t S.l (NibO)

/ EdN- L 43S4 .

10 2820F y ..

, DIVISION OF NUCLE *3 ENGINEERING (ONE) SECTION III SEQUOYAll ENGINEE'iING PROJECT (SqE?) SEQUOYAH ENGINEERING PROCEDURE PROJECT F.ANUAL SQEP-09 REVISION 3

. ATTACHMENT 1 PAGE 5 0F 5 ECN/0CN/FCR/PMP/Crawing and P.sv. .D c A 2545 Unit I,'2-SECTION II (Continued)

21. List design documents that will be affected by this change:

4784s/- 8? S siti c .t W

. (0 1/EI N G- f

$ c H 2 M 4 7"ic. Duk$

_49W 6 co -19 b

22. List any new design documents that will be created as a result of this change. .

t W e k

O n' n- ,

i h t t C

  • hi n .'.i . - $- ' 5- -

Lc:p si %:.1;I;M l'- AL* W* '2I*

l .-

( 2820F

' --. -,-- - - - 3m-oos a:n essue m k

ELEVATIONS FOR UHI (WATER ACCUf1ULATOR & 1-LS-97-21,22 23 8 29) . ,

Disyancebeh' "

. set ficer & condensate pots is 29'.

& bottom tap elevations is 75".

Elevations for 1-LS-87-21,22,23,8 29 can b'e seen below:

(distances are between the floor and center line of LS)

LS DISTANCE 21 52" 22 61" 23 96" 29 58" Ficor elevation is 706'.  !

~

PREPAREDBYY?!s.A- y slcl88 ~

-CHECXED BY z No9tn' NL flfl#. ' -

l I

)j:

1 s

l l

\

Y A;: :: .m:c: i : _ 52 She:; / nf /

i L.:p 9/i: .,;;r J. is- e7 2/ .

O I 8 g

l

,,,o p -M m#-M*=* "

y

. . . . ~ .; v. ,. u w.., . w w .,,e ,, ;- y a p.-~~:.o T. . . . . : s: ..a* ..

n . w. . ' ' ' n.:...a 5 d 5 . ,A? .N: V;: ;hb

?

.c .  ?.W>

.2 .f. ' l.d.!&2'%.,'i;i.R.

~ np ..s .W .%. .. .M... . <

..Q&&,W.

. W ' E ~ . -n ..ENW.%. .@.4.i2.'sn, . 2.?.W:.. . il,: ,Hj.G n.

a- . M:.W:

< + .

q-(:*:q';>.g., Q; ;'{'? ,; : . . Y];fq.'j ;1.- v'- . s '#'c " .

.;. .;,r. ,,c. ' (. . ~;; ' .'o..

.s V').j; iQ,Q1l:.v

n .

t

. . , .. u.  ;,..m. ;.e..u. . -

. :h. , - . :,0 rq.y

. g. , :. i.r:;.r .~ . , . . w ... . . .: , a. . .. , ,

. ., . ..y-l'~._

c.,

n

. ,.n, .,. .g3;

.c

. '-: ..;.e

. ' -~... . ..:. .

. , .::p, w. g ~;v .~ %. 9. ~

,m; m ? n..>e .

.e a . .:: .,,.-. .. . ;, .;. .,v!

c p..

. . .,e. . .. ;i't,*

. , Z .;. . .*- .- .;g, .., ,. .,. . 4.

. y n:

a. <,v,;n

. Q.

y ,..g; .

. Q.

.. n  ;

. k.

+pg n.~ ; ;- s . . :.< ;.. e,r.. .

, . ..< i. .

, g .

, ,_ g :. . ;;. . e. , .J,

. ,. , .g

.~.

e :. . . .

, . ',', .. [t. ,[g 1, j.t ' '. C*,ME *u, . .t. 1.y. , .; .[*., ; -

' s s. ..s T. ,.s.s -n. .s.

.' ) ;j>.,;g,h. p.1=46h- ]';N. g,;.g.$ g,;0.,; M

.. s. ,y g & .Q,e ,, ..Q' '. '.\.  : . . ..t,. * ..

, . '-1. :'/.a.p.l,)

. . 5.i.,i; .c,,,

c.e4.

,G,:;.,  ; .' . . , ' ' , g s,Q... 'g.y; yp,p.;

, .. s

.yq  ;:,. ;g .l.;Q ..;<: . 4.y!,;;'.;&. (.,g; .j, ., Q:,y,(,,,-

z

'

  • t . c .A.. ty, yWG,' V.. n .

, . ,.f ly~w;f; .

.n.c
;s.. .~ ".
. ie a .

Myr 3. . .. .J .. . .

  • n ;;, r **. '. + , %'* . e

. 1l ; . .

?. .

. /.>.b,,s.: :v, ' 4'e

- s n  ;;M.y;

r. , : . n. - s .,, 1  ! ' < .::

~.;:., .. . 9 :m< n . Yt,.pQ: i,J.1. .~ .

, .[, f:7.f,wr'2 . ..'?. '; r . 'x;f ..+

-. *'3 .

  • Q.;
  • s;4* Gf l.:i1 w a h:.Lg.

. .J

  • t;p{yn g.ma
Q-)l .yl
?w, .,. .', . lI ;Q.
  • ?.'} . Yg w ',ll:' .: -

,. w ? ..

' j :3 ,i ,A 9,,

h.* .+ .~6.;.:. .,,f.

s .

' ,'.lf. y A, , . . y. . *, ' .

  • rv. C *f.6f '

a , .e 4 W,M,'&,&*01/s ..' . , ';.'. .

3 2-

.%, b y ?. J.y.;Y.:;.. , b. .Q' *cl* ll*l;f

.r f .. / .. .p.-.- h

?' ' 9,Q:u.*'**<j-ltg*k y 3y

. *] lg*

e.,N!.f,y,?.f;

. .Qg .;- . s . . .. .s ..r,.st -

.. e

]1

.~ m.*(($e4 )~,e M. %,'

. E5"f5D.,. tlll.h.;?

p3.,

' l<5'

  • w.,.g. <.g<

f.r:m;;;e,.}.hh,.,lW

~

. . p.

vcr  ;. '%g'j..+ 9 . y';,.. ,g(.,,;.

sM.m.:'.v n1. ., %' 3;,,.,&:

\,,.- M. -, :.,

Y','.

.,.*.t,&, . , ....'-.eV.. ..
. . .:, . m. . .
s. .' .,.. i.. wf 1. %.:-..b. gm >f.c t,*y__i;k ;t.. e.. .. ..

. .*~  ? "

f. m .v%..,:,.Qv.  : : .w :m, .c.9.b; n .p.v,yg v.i,'. ; ;f.,$x,,pt 4.; i.Q;.  ; a :':.. :::h ~ . : '.' ;'W' .. *w ..,.,.u-

,.n. .m:..;.; 2

. a"..M.s. c;;;. .;s.gQ;r.(<L

., ,w . . *

.! t.i -.. .:.'.L ;:;Y ,~s;;<.9. >*:..*.  ;% :, s.,3;,

_.y  ? 1 -y ^g m".
v. ,gm.. . ,c r.v,.t.a.q. *ww?;,cn,.r>M&;y; o w .t&,r.qp .<

y.Mwm,

  • ac.g1
7 p.,.g.t:9.,,n.3.

..<;.., W; .v.q...  :

,..;,.; p:

ag.

,, ;,1.%.

,;. .y '

.l,

,. .. . s. .e,. .

w .. . .. .p p T,,.,. - , . %y4,.dA

.,.g-fy,J.3:,4.&.. '; . - @. 'y ..

. . m. . . .. .

r:.a;.'i.'*5'Y.t15A.i4ll{}4..,4N'fa:

w..,, w y 9':. r; 'p ^' .;.m

+

n.:,.
.. s Qlg, .5't'-5 h..iy ..;;"m.s

. m?,,W;m&%:&,;tl&'('"g$.'d

+$ , , . c.;.t.4,s... :9 . . ..

5lA .,....,.g es'M5 ar. m vs.o u. , ,.;q@g .f.;,,:p:'q.;VC.qe ,y: {)s a ;; - . .

, 9 1- .

U " .

.N.
i

, ' ". h

. ; c ,; ,, . - . . , s s. . .' m y . * ;v. . .

. .- ri m;.gjrr

+ f g y:,.,,,.,,y

. . .'?ACCUM,.,wg;C/poQ:g..,.

y.:

3, gs,. *,..<.r-

, q Q,,

n.

7. ;. .:.

. . .f. .

y s. .

..  :.  ;;:,y~ A

.: m. .. g :. .y,.m. . . u . . ~ u: .

.v

. ,..si o. p w.c.w.7..t. . . ;,

. . .. , ,s x. .+ .,

.,.,:~. _,

'....,'.y.,. .

t

.-~..., . - ip;<f. . . . ..i>..t.p

w. .a :. z. s . . . . . < .. ; , 'n.c' u.~ .,p . M. . .,1,.

. . *1d @'s .' . . .

.r

. A, L u. : . ;,i.:.:

e r:

._ 9..1V. 4>::+

'j ; .* *y.. .g'. g.q .. . . . :):. 2 ; !

f.

y . q).1,?.;. .5&..c

< .j,4;i; . .

.l 'y,'}. '

'~

. :i '.: :,y *:. \.n :" .s. . . ' !. u:. &' g.:f;} .l_, j y ._. . ., .;.,. . ,,..y;;,.

g;.r pp.s O. .>*. W.~f (< , .

p < c.. .,Msy; . m g A.,is

. ggt;)6

\

Q'.:' '. .m.

e.

. .. .*. . ."..l.':.::..W[;y'."A.,gy<u.

s .

  • d'.1

. i h;.

> . . .> ..p..

.l(: ."v;,

~

'.., ,-p . w ..

b;

. .. s .

s.p . ;fl',.:y'1.rs.y%p.;

s f.&1 a . w.,.

w.

.&. p"Q;:.pg.:..,p%%yr$

d-U;*g; '*:

.z. , A .: >. :?. '

, , .. v .

n.:

, e. ..

C . , .$.h.' .

^

. . w v. ;.,. .. .< . 9'W/8.,,;i.~. .y. . . .a.. g., 5,.u. ..:;, n,$.,;#*) .4h.

G, .?,p.

$.r d.4.:.!.,..4 f. . . .'.

..' q?;Fn,%h.M Y,W:. 3M ,. . .y.i.-

. . ".  ;..q w g.:.:. .. : .s; u .. w.

BOTT..OM Et;.ORM$E'.#'..yer:. T. 2. . '.5. ,: ' 'N. .

S.

..m'.

.' f.

M'" # * ~- *tF' W P "q"'/. 'b. <'.I.6.3 P.G, 2. .:Id o

.f.s.v .
  • "l, .u . . - f.&. s 3 s"* :.*
,. *,l ' .

( .. ..<C,n'

  • Y

'- .' ': $;%6. 'i..i, i

. :s u. .l d. d .' ',. y'ln , , l -D !a .;.'. .. .;  %.;, ;.' . . ... , ',,.[T , d **

. . ..b 'f . .

. }. a.W.r ,. 2 1. . ;t. . 4 e.q;&:- - -

~ ,

~hq .y y. *-

..w. , . . i.w. . :.

n ~. sp;, e *. .:?: <f iG

u;.wc.m' :i rl.:, ..:,,. /,.:.. i m':.a::w$m%

. ww. s . .., m.u.-.w.::.=:u.4.:.y?.,s,: ry;*l-tfx. y0 Q,;. .;., . ,s.'..$ p ',Q:

, );.A'.s >-

?.. .',e- @ Q,.f,z; 4, y., W v: ..p. ;.te.  ;. . t.' M.4 .

,[;,:.'s.g.yf a

. . .s. .m m. %:*. u..m;.,W. cs r.pp,.m..

  • 9. Q n. .
g. . .

sww. y. q.3 ...c;f.y :Q. k' .y s

':. ,n .y.w,M&; .n .y.q.. 2:, m~p.,9 . .r.

, e .

.; < . , <\ .. . ..s. . ....

~

< ~ .c4..c::>3; . .:.. n.7.  :::: . .~%. . .nw._ .  ;:$.w.

. .4; :2.syy G, .

s...  :~.m,< ... s : . &u. -.$ . , . ..,g. . ,. n. r,p m. ,,.,z.:. v.cJ

. w .v s ,n.m. n.;.

a ...

a

.e.. w.:,. :.. w w.

.. ,. n c .. .v. . .~. ~ ,..m.n y% ud

. ..,;.s. r3;. u..%%.m. a.g.. . . . .

. z.. m . <.. m.

. :v. . ..:.. ..,,..J.e.O m.

v. .-..,.. mp

.a,1.. we,.;..: a. u..i .x.:0.:a a;;gjly+;.,g. c. ,pg - . , , -. . .

. ,1 y, . r .

.. . 1.o. - < ..' ~. . m. . , ps, y.:.y,.g.a . .s.

3- .

. .G. w[:;rts. ;g,.:yQ.)

.,.. a.. y_ . . .:

.e ,. . e., ::: ,, ..,.

. . . s,.

...s.. ;.y:: ~. 1. .m .v . :. .. . .>

. . ~ .. , .

.<5

+t y. . 3.c w

.. ..;r.7.1

... n:.

ri,

,,;..e.w. ..

.qw. y. .. ..

g. 9.* 3. . .I ..
w. r: ,.;\ . ..t.,, <' .:*

~..&,, .,r y.a,.s ,s.w* . o. .a.s;. .,.,;.i

.~ , ..y. .:....3;.. .;... ;g . o ;.. v.:.

m..'

.vq. . :c.%e.,&.

. i 9, .Y.r) - . . . ; c:.1t. c. .. ..'

.4n ..

.e v:, g. . A . .. s c . ., s .-

.e.,. . l,. m ' s. ,

. . . .: . . , ,  %.. . ,;.d. '. .

  • r.,

..r *y;!.:. ;s'.*. .. . 4.; , ,*4..c,... . x . .i  :. , . . + . . . . . . -

N .  ; *

..c;,v. - ;' . . . M. %s.. b..1. i u .-.., v. . J"6 g . ' . e .. . . .e  ; , y;,;,dY ,

, . . ..- . . . . v*. -T . v.,e. T q.; ,

. , s; v .,".

. g.P.*. ' . .

t

'r'W.-

. ; .', . j,'1. : n.. ,,. . ....=,' .q.:.;..s..h.g. .,a,.S.\..g.:..s.L. w .4 , . . y, ..,.

d s

.. . . 1 7- . . .,..-, .

. ;. .;;<;d: *. ,

4

,h'lg:. '. ((M :.[ M y,. " '*),*2 J.j/ ' W.. i . ;'i', - 'IW.,,,(#-}

. : .g . - -

..Q. .

'J 1*.'.' * . . ,. 7; -f . . ;

% 'r T';v. /,U;.',*,y'j.9:

.. pp . c.q .?..,,.K., (.' ' $,y' .l;} ., .

.- ... .. ..,t

.).

c, a.. v -

. e.: ...

, .>.. . < ..:.a , .). ;

. . . ..c . .. . .,. . .. ..

.c i. .

,,. ..- ..~...n-

. . .. s. . ., .;

.; ; ..'. n .?

O.5$bi.W.s:.:;:.L'. ~ . . . .e,m.m.h;.z;Y.;,h..U:.,';l

.0 ' .. .

4 '$ mU &.. U^% g g3 *..' ' .4" W;. . .
. ...5 n.v;>p .. ~ .c waL

.c:su.c ,,. .s .;; e ..

Y 0;.f.?W:@.N;W',:W:ffb&ilAQEMQ@ n .'., ..y... . ': '.~. O L

.:([iAQ;'.ik'

. c:wr,k.h: ~0%'.e. .:W. . :p,:.y..u..g  ; p ;;f;;.y. g ;:. : q ; y g .;lf(';:~,

l

. ; f y;. _

..c. /,.  : M A.m*. Wv

. . a.;>.e c.;!9Y'N.:~7.lv.;e.dW~:aQ.:

P i  : . - -

. c.

a .. k . ye
.r l:; Jr:nefii.5:n:7 rr.-g.y;n;.c'

,w,, W/n:.,.;  : <d.~.

.?:%.  :. : :<. .-%;

. 7. p .m .

-c,,c.

.:ew.. g w.::.;':. hlg'  :':l' ' . ~::a

.tr .weq * '.c,q.f.gy&:'

m .n . . u..L. ,

n rrA.H 33, M ./ Of I 'pgm w rwypay pwp FU 57- 2.1 n/&tsj3 u(

'" W ""

  • 3 w:r#'t ===wstS

A,& & 4e 1

+

ENCLOSURE 3 PROPOSED TECHNICAL SPECIFICATION CHANGE SEQUOYAH NUCLEAR PLANT UNIT 1 DOCKET NO. 50-327 (TVA-SQN-TS-88-20)

DETERMINATION OF NO SICHIFICANT HAZARDS CONSIDERATIONS O

e 1

i

l ENCLOSURE 3 I Significant Hazards Evaluation TVA has evaluated the proposed technical specification change and has determined that it does not represent a significant hazards considecation based on criteria established in 10 CFR 50.92(c). Operation of SQN in accordance with the proposed amendment will not:

(1) Involve a significant increase in the probability or consequences of an accident previously evaluated. The UHI system is designed to 1 supply additional inventory to the reactor core during the blowdown' phase of a LOCA. UHI flow to the core is terminated by automatic hydraulic isolation valves. These valves are actuated by level switches on the UHI water accumulator. The proposed change reflects a new actuation setpoint and the associated instrument tolerances for the level switches. As such, the change does not increase the probability of a previously evaluated accident. The new setpoint and tolerances were calculated based on a new level switch accuracy characteristic and a broadened UHI-delivered water volume band.

Broadening the delivered water volume band did result in increased PCTs for the limiting

  • cases. In all cases, however, the PCT remained below the 10 CFR 50.46 limit of 2,200 degeces F. This in turn ensures that offsite doses remain bounded by the analyses of FSAR section 15.5. Because the proposed setpoint ensures that the delivered water volume remains bounded by the new analytical limits, the proposed change does not increase the consequences of any previously evaluated accident.

(2) Create the possibility of a new or different kind of accident from any previously analyzed. The proposed change to the actuation setpoint and tolerances represents no modification to the UHI deslen

or operrilon, which could create a new accident. The change only affects the performance of UHI for accident scenarios in which it is alrea/> assumed to function.

(3) Involve a significant reduction in a margin of safety. The proposed change to SR 4.5.1.2.c.1 represents a new setpoint and accuracies for the combination of new level switches and a broadened delivered water volume band. The setpoint ensures U.at the delivered water volume remains between 850 and 1,130.5 cubic feet. Westinghouse analyses have indicated that delivered water volumes between those limits ensure that PCT remains below 2,200 degrees F. Therefore, the margin

safety is not reduced by this proposed change.

l l

l l

^ -

-- _-