Proposed Tech Specs Requesting Discretionary Enforcement for 48 Hours Which Is in Addition to 72 Hours Allowed Outage Time Provided by TS Action 3.8.1.1.b
ML20134P863
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/14/1997
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20134P306 List:
References
NUDOCS 9702260149
Download: ML20134P863 (2)


Text

. _ _ . _ _ __ . - _ . _ . __

. 3/4.8 ELECTRICAL POWER SYSTEMS

[, 3/4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE: J

a. Two physically independent circuits between the offsite transmission i network and the onsite Class IE distribution system, and
b. Four separate and independent diesel generator sets each with:

1

1. Two diesels driving a common generator
2. Two engine-mounted fuel tanks containing a minimum volume of 250 gallons of fuel, per tank A . separate fuel storage system containing a minimum volume cf 62,000 gallons of: fuel, 1 i

j 4. A separate fuel transfer pump, and

5. A separate 125-volt D.CJ distribution panel,125-volt D.C.

battery bank and associated charger. I APPLICABILITY: MODES 1,;2, 3 and 4.

, GJTLE:

a. With one offsite' A.C. circuit of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remain- R209 g

g ing offsite A.C. circuit by performing Surveillance Requirement - 4.8.1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

yM Restore at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in

@, tp COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

'9 b.# With diesel generator set (s) 1A-A and/or 2A-A or 1B-B and/or 2B-B of R209 l

kg F the above required A.C. electrical power sources inoperable, demon-strate the OPERABILITY of the remaining A.C. sources by performing 1

bt Surveillance Requirement 4.8.1.1.1.a within one hour and at least b

f once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and determining OPERABLE diesel genera- R209 NQ 9

tor sets are not inoperable due to common cause failure or performing Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; restore at

') % l.sDr least four diesel generator sets to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

  • gi41 9 or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

,{

t

  • The 72-hour action statement may be extended for an additional 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for w
1 supply must be connected to the diesel generator set that is having the associated fuel tanks cleaned.

-k 5 # Required actions, to verify OPERABLE diesel generator sets are not inoperable R209 due to common cause failure or perform SR 4.8.1.1.2.a.4, :ihall be completed if this action is entered.

W 9702260149 970214 ADOCK 0500 7 June 29, 1995 Amendment No. 100, 132, 137,

[SEQUOYAH-UNIT 1 {DR

3 /4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES

, ^ OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be  !

OPERABLE:

1

a. Two physically independent circuits between the offsite transmission network and the onsite Class IE distribution system, and
b. Four separate and independent diesel generator sets each with:
1. Two diesels driving a common generator
2. Two engine-mounted fuel tanks containing a minimum volume of 250 gallons of fuel, per tank
3. A separate fuel storage system containing a minimum volume of 62,000 gallons of fuel,
4. A separate fuel transfer pump, and
5. A separate 125-volt D.C. distribution panel,125-volt D.C.

battery bank and associated charger.

APPLICABILITY: MODES 1, 2, 3 and 4.

> ACTION:

e R195 S a. With one offsite A.C. circuit of the above required A.C. electrical kD power sources inoperable, demonstrate the OPERABILITY of the remain-ing offsite A.C. circuit by performing Surveillance Requirement Q& 4.8.1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, k

s Restore at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in

% COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

R195 K 34 b.# With diesel generator set (s) 1A-A and/or 2A-A or IB-B and/or 28-B of l

{ 3 the above required A.C. electrical power sources inoperable, g{ demonstrate the OPERABILITY of the remaining A.C. sources by R195 9 performing Surveillance Requirement 4.8.1.1.1.a within one hour and 4 at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and determining OPERABLE diesel R

k' generator sets are not inoperable due to common cause failure or performing Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; y i restore at least four diesel generator sets to OPERABLE status within k 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

  • or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

R123

-a

{4E b *The 72-hour action statement may be extended for an additional 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for i3 \ one train of diesel generators (either IA-A and 2A-A, or IB-B and 28-B) during W the performance of Surveillance Requirement 4.8.1.1.2.f.1. A temporary fuel supply must be connected to the diesel generator set that is having the R195

.N(

k 0-associated fuel tanks cleaned.

  1. Required actions, to verify 0PERABLE diesel generator sets are not inoperable due to common cause failure or perform SR 4.8.1.1.2.a.4, shall be completed if this action is entered. June 29, 1995

, I 3/4 8-1 Amendment No. 89, 119, 123, SEQUOYAH - UNIT 2 195  :