ENCLOSURE 2 TENNESSEE VALLEY AUTfDRITY SEQUOYAH PLANT (SQN)
UNITS 1 and 2 PROPOSED TECHNICAL SPEC'IFICATION (TS) CHANGE TS 97-07 MARKED PAGES I.
AFFECTED PAGE LIST Unit 1 4 7-10 Unit 2 k 7-10 II.
MARKED PAGES See attached.
i 9802230194 980213 PDR ADOCK 05000327 P
PDR E2-1 J
PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.7.1.51 ve5shall be OPERABLE.
APPLICABILITY:
MODES 1, 2 and 3.
ACTION:
MODE 1 - With one main steam line icolation valve inoperable, POWER OPERATION may continue provided the inoperable valve is cithcr restored to OPERABLE status er cle;;d within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; M6DE 2.
Otherwise, be in6t is;t ll0T STff:98V-within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.=d ',
GUT _00MI' wj thi_r. th5 f elp ir.;; j 5=r:p MODES 2-Withonekainsteamlineisolationvalve5 inoperable, subsequent and 3 operation in MODES 2 or 3 may proceed provided:
Ril Ruisero To CPERASLE STMS OA The isolation valve isknint ird closedy Wmus '{ Houtsj a.
6.
Tu.kotcnnsLE Isotnnes) yntn.Ts Ygxinm CLDS@ QMG $$ l OQ}
CV.
The provisions of Specification 3.0.4 are not applicable, d.
Sear..en Ewny ku Tans Acroon1s At.t.ouro for hw kty,oy ygwg.,
Otherw'., be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT 0;iOTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
j n
s SURVEILLANCE REQUIREMENTS 4.7.1.5.1 ach main steam line isolation valva shall be demonstrated OPERABLE by veri ying full closure within 5 seconds when tested purcuant to Specification 4.0.5.
m H'l.1.5.2 Ar LEnsr Cae Ax IIMonrHs, I'cxif)' Ency Mniit) Stenn Isoigrioit:
fALVC OLo3ES Div /lU AC724AL OR S/MULMIED }lU7DMM77C / Ch/ATion) SIC,".stfL-.
w v
SEQUOYAH - UNIT 1 3/4 7-10 Amendment No.114 May 5, 1989 a
4 PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES 6
LIMITING CONDITION FOR OPERATION Tout i
3.7.1.5 M main steam line isolation valvedshall be OPERABLE.
APPLICABILITY:
Modes 1, 2 and 3.
ACTION:
Modes 1 - With one main steam line isolation valve inoperable, POWER OPERATION may continue provided the inoperable valve is eith;r restored to OPERABLE status ;r ci;;;d within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; Otherwise,beinbiST OCY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.;r.d ir s' JJi OC=
it'ir, the f;11; ir.; C
^
on most w
-=
MODES 2 - With one Imain steam line isolation valve 5 inoperable, subsequent and 3 cperation in MODES 2 or 3 may proceed provided:
R10L The isolation valve is m+Rgsrongo7e OPER.86LE STys ca.
l a.
mt::=d closedx khTHIN 4 Houts' "THs IN0PEM6LE 150 Leon hvs ~[s VER.lFiro Ct.oSEt> ONcc Pat. 7 Days #
b.
c )/.
The provisions of Sp_ecification 3.0.4 are not applicable *,
d.
SetAurr Eynty.TNTD ints AcmdIs ALLOWED RR EAct.TsoL4now yncyr, Otherwise, be in ROT STANDBY withir, the next 6 nours and in HOT the followin
~
SURVEILLANCE REQUIREMENTS 4
ach main steam line isolation valve shall be demonstrated 0FERABLE
~
by %riTying full closure within 5 seconds when tested pursuant to Specification 4 0.5.
Lt.1.1. 5. 2 ArIotsr Onkc h @ A"'
T N" h" pt,pg (loses ON AN /ICTUML OA M ULA O
- A#
A w
e h
SEQUOYAH - UNIT 2 3/4 7-10 Amendment No. 104 May 5, 1989 J
4 ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)
UNITS 1 and 2 PROPC$ SED TECHNICAL SPECIFICATION (TE) CHANGE TS 97-07 REVISED PAGES I.
AFFECTED PAGE LIST Unit I h 7-10 Unit 2 k 7-10 i
II.
REVISED PAGES See attached.
E3-1 n
<r
-- J
.e e-
' PLMIT SYSTEMS 1
l MAIN STEAM LINE ISOLATION VALVES
~ LIMITING CONDITION FOR OPERATION 3.7.1.5 Four main steam line isolation valves shall be OPERABLE.
l
&EPLICABILITY: MODES 1 2, and 3 7
GSE E t
MODE 1 - With one main steam line isolation valve inoperable, POWER OPERATION may continue provided the inoperable valve is restored to OPEP.ABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; Otherwise, be in MODE 2 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
MODES 2 - With one or more main steam line isolation valves inoperable, l
and 3 subsequent operation in MODES -2 or 3 may roceed provided lR118 a.
The isolation valve is restored to OPERABLE status or closed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; b.
The inoperable isolation valve is verified closed once per 7 days; c.
The provisions of Specification 3.0.4 are not applicable; d.
Separate entry into this action is allowed for each isolation valve.
Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> cad in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.7.1.S.1 -Each main steam line isolation valve shall be demonstrated OPERABLE l
by verifying full closure within 5 seconds when tested pursuant to Specification 4.0.5.
4.7.1.5,2 At least once per 18 monthe, verify each main steam isolation valve closes on an actual or simulated' automatic actuation signal.
SEQUOYAH - UNIT 1 3/4 7-10 Amendment 114, L
PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.7.1.5 Four main steam line i.alation valves shall be OPERABLE.
l APPLICABILITY: MODE 1, 1,
and 3 ACTION:
MODE 1 With one main steam line isolation valve inoperable, POWER OPERATION may continue provided the inoperable valve is restored to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; Otherwise, be it. MODE 2 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
MODES 2 - With one or more main steam line isolation valves inoperable, l
and 3 subsequent operation in MODES 2 or 3 may proceed provided:
lR104 The isolation valve is restored to OPERABLE status or closed a.
within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; b.
The inoperable isolation valve is verified closed once per 7 days, c.
The provisions of Specification 3.0.4 are not applicable; d.
Separate entry into this action is allowed for each isolation valve.
Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
i I
SURVE7.LLANCE REQUIREMENTS
= = -
4.7.A.5.1 Each main steam line isolation valve shall be demonstrated OPERABLE
{
by verifying full closure within 5 ceconds when tested pursuant to Tpecification 4.0.5.
4.7.1.5.2 At least once per 18 months, verify each main steam isolation valve closes on an actual or simulated automatic actuation signal.
I SEQUOYAH - UNIT 2 3/4 7-10 Amendment 104, 5