ML20202J760
| ML20202J760 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 02/13/1998 |
| From: | TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20202J745 | List: |
| References | |
| NUDOCS 9802230214 | |
| Download: ML20202J760 (45) | |
Text
___._
ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY SEQUOYAH PLANT (SQN)
UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATION (TS) CHANGE TS-97-04 MARKED PAGES I.
AFFECTED PAGE LIST Unit 1 Index Page IX Index Page XIV Operating License Page 8 3/4 7-21 3/4 7-21a 3/4 7-21b 3/4 7-22 3/4 7-23 3/4 7-24 3/4 7-25 B 3/4 7-5 B 3/4 7-6 8 3/4 7-7 6-23 Unit 2 Index Page IX Inc.ek Page XIV 3/4 7-21 3/4 7-21a 3/4 7-21b 3/4 7-22 3/4 7-23 3/4 7-24 l
3/4 7-25 B 3/4 7-5 B 3/4 7-6 B 3/4 7-6a 6-24 i
l II.
MARKED PAGES l
See attached.
~1 9802230214 900213 PDR ADOCK 05000327 P
ppy
INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAgg 3/4.7.5 ULTIMATE HEAT SINK 3/4 7 14 3/4.7.6 FLOOD PROTECTION....................
J/4 7-15 s65 3/4.7.7 CONTROL ROOM EMERGENCY VENTILATION SYSTEM.
3/4 7-17 3/4.7.8 AUXILIARY BUILDING _ GAS TREATMENT SYSTEM 3/4 7-19 3/4.7.9 SNUBBERS (DQ. Eh n.
.A.
3/4.7.10 SEALED SOURCE CONTAMINATION 3/4 7-29 3/4.7.11 FIRE SUPPRESSION SYSTEMS (DELETED) 3/4 7-31 R231 3/4.7.12 FIRE BARRIER PENETRATIONS (DELETED) 3/4 7-41 3/4.8 ELECTRICAL POWER SYSTEMS Rf5 l
3/4.8.1 A.C. SOURCES OPERATING 3/4 8-1 SHUTDOWN 3/4 88 3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS A.C. DISTRIBUTION - OPERATING 3/4 8-9 A.C. DISTRIBUTION - SHUTDOWN 3/4 8-10
.D.C.
DISTRIBUTION - OPERATING 3/4 8-11 D.C.
DISTRIBUTION - SHUTDOWN 3/4 8-14 3/4.0.3 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES 3/4 8-15 l
l August 12, 1997 SEQUOYAH - UNIT 1 IX Amendment No. 61, 227
j BASES l
l SECTION PAGE 1
3/1.7.4 ESSENTIAL RAW COOLING WATER SYSTEM B 3/4 7-3 3/4.7.5 ULTIMATE HEAT SINK (UHS)
............... B 3/4 7-4 3/4.7.6 FLOOD PROTECTION B 3/4 7-4 3/4.7.7 CONTROL ROOM EMERGENCY VENTILATION SYSTEM B 3/4 7-4 3/4 7.8 AUXILIARY _ BUILDING GAS TREATMENT SYSTEM B 3/4 7-5 v
3/4.7.9 SNUBBERS hk.
B 3/4 7-5 A
s v
3/4.7.10 SEALED SOURCE CONTAMINATION B 3/4 7-7 3/4.7.11 FIRE SUPPRESSION SYSTEMS (DELETED)
B 3/4 7-7 R231 3/4.7.12 FIRE BARRIER PENETRATIONS 'SELETED)
B 3/4 7-8 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 and 3/4.8.2 A.C.
SOURCES A*.J ONSITE POWER DISTRIBUTION SYSTEMS B 3/4 6-1 3/4.8.3 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES B 3/4 8-2 3 /4. 9 REFUELING OPERATION _g, 3/4.9.1 BORON CONCENTRATION B 3/4 9-1 3/4.9.2 INSTRUMENTATION B 3/4 9-1 3/4.9.3 DECAY TIME B 3/4 9-1 3/4.9.4 CONIAINMENT BUILDING PENETRATIONS B 3/4 9-1 3/4.9.5 COMMUNICATIONS B 3/4 9-1 3/4.9.6 MANIPULATOR CRANE B 3/4 9-2 3 / 4. 'd. 7 CRANE TRAVEL - SPENT FUEL PIT AREA (DELETED)
B 3/4 9-2 lR208 3/4.9.8 RESIDUAL HEAT REMOVAL AND COOLANT CIRC'JLATION B 3/4 9-2 g
3/4.9.9 CONTAINMENT VENTILATION SYSTEM B 3/4 9-3 August 12, 1997 SEQUOYAH - UNIT 1 XIV Amendment No. 157, 204, 227
-I (19)MechanicalSnubbers V-uith % 12 month: after the 10:e n:: cf the licen::, TV^. :h:11 provid: : TecPical Spec!!! ation li: ting _of ;cch;nic;l :nubetes r-In th: interim, TVA wil' conduct ; :: prehen;f ve mechanical
- nubb:r h:pection pr03r:: implemented by plant 'n:tmetion:.
bC1 GTED.A llll$ (oNDITl0D.Ts K
A..
~
(20) Low Temperature Overpressure Protection (Section 5.2.2)-
.s At the first outage of sufficient duration but no 3ater than -
startup following the second refueling outage, TVA shall install an overpressute mitigation system which meets NRC requirements.
R27 (21) Control Rod Guide Thimble (Section 4.2)
Prior to startup after first refueling, TVA shall submit the details of the inspection program-for control rod Suide thimble tube wall wear for NRC approval.
(22) TMI Action Plan Full Power Conditions Each'of the following conditions shall be completed to the satisfaction of the NRC by the times indicated:
A.
Safety Engineering Group (Section 22.2.1.B.l.2)
Prior to exceeding five percent power, TVA is required to have an onsite Safety Engineering Group. hRC will verify the adequacy of the Safety Engineering Group and its independence.
B.
Short-Term Accident Analysis and Procedure Revision (Section 22.2.I.C.1)
Within thirty effective full-power days, TVA shall revise Emergency Operating Procedures and brief the operators on the revision.
C.
Control Room Design (Section 22.2.I.D.1)
TVA shall consider the benefits of installing data recording and logging equipment in the control room to correct the deficiencies associated with the trending of important R27 parameters on strip chart recorders used in the control room as part of the Detailed Control Room Design Review.
Impl emen-tation shall be carried out in accordance with SECY 82-111B.
December 27, 1982 Amendment 23 L,'
-PLANT SYSTEMS 3/4.7.9 SNUBBERS LIMITING CONDITION FOR OPERATION v-Tass SPmnthToca.Ls hetE7En 3.7.9.
All ;;f;ty 7:l:ted :=thr :hil h 0^E"*EE.
R43
_+
~A W CABILITY. "00CS 1, 2, 3 end 4.
("0005 : :nd 0 fer eachre locatedp system ial systems required OPERABLE in those MODES.)
ACTION:-
ct.EN With one or more snubbers e, within e lace or restore the-inoperable snub o OPERABLE status and perform an e ing evaluation z-l on th ed component or decla,.re the attached system inoperab e llow i
._____a...
. m nu.... - _.
.u..
l H
/
= vEILLe"'E "E00!REMENT5
'4.7.9.
ch safety-related snubber shall be demonstrated OPERABLE by performanc of the following augmented inservice inspection program a he R43 requirements Specification 4.0.5.
a.
Insoection Genuos R2,l?
The snubbers may categorized into two major groups sed on whether the I
snubbers t.re access e or inaccessible during reac operation. These major groups may be fu er subdivided into subgr ps based on design, environment, or other.fea ges which may.be ex cted to affect the OPERABILITY of the snub s within the s roup. Each subgroup may be tested independently in ecordance th 4.7.9.d through R157 4.7.9.h.
b.
Visual Insoection Schedule and Lot, z All of the safety-related snu ' rs shall be neluded in one population or they shall be categorized a accessible or ina essible for visual R157 inspection.
If used, th ccessible or inaccess le categories shall be considered separately r visual inspections.
When recombining S egories into one population, the sho er interval of the categories Kall be used.
The visual nspection interval for the population or each categ shall 3
be dets ned based upon the criteria provided in Table 4.7.9-1. a the first nspection interval detarmined using this critesla shall be ha upo the previous inspection interval as established by the requiremen affect-before the amendment which incorporated this change was issued t
by the NRC.
r October 4, 1995 SEQUOYAH - UNIT 1 3/4 7-21 Amendment No. 39, 153, 213
,