MONTHYEARML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A1772021-10-28028 October 2021 Proposed SRO Admin JPM ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21361A1072021-10-28028 October 2021 2021-301 Byron NRC Exam Submittal Letter ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21361A1262021-10-28028 October 2021 ES-301-6 ML21361A1242021-10-28028 October 2021 ES-301-4 ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1572021-10-28028 October 2021 Proposed in Plant JPM ML21361A1162021-10-28028 October 2021 ES-301-3 BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A2732021-10-28028 October 2021 ES-201-2 BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A3322021-10-28028 October 2021 Written Exam ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A1352021-10-28028 October 2021 ES-401-6 ML21356B7322021-10-28028 October 2021 ES-201-1 ML21361A2752021-10-28028 October 2021 ES-301-5 2023-08-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21356B7322021-10-28028 October 2021 ES-201-1 BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1262021-10-28028 October 2021 ES-301-6 BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A1732021-10-28028 October 2021 Proposed Sim JPM ML21361A1772021-10-28028 October 2021 Proposed SRO Admin JPM ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A1162021-10-28028 October 2021 ES-301-3 ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21361A2452021-10-28028 October 2021 ES-301-1 ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21361A3252021-10-28028 October 2021 Scenarios ML21361A2752021-10-28028 October 2021 ES-301-5 ML21361A1242021-10-28028 October 2021 ES-301-4 ML21361A2732021-10-28028 October 2021 ES-201-2 2023-08-09
[Table view] |
Text
2017 BYRON STATION INITIAL LICENSE EXAMINATION OPERATING TEST OUTLINE REVIEW COMMENTS RO ES-301-1
- 1. KA 2.1.31 (Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup) - Some variation of the same surveillance test - Performing the Off-Site AC Power Availability - was used in 2010, 2012 and 2016.
- a. Discussed with facility representative and they will likely replace the surveillance test with a different activity related to the selected K/A
- 2. KA 2.2.41 (Ability to obtain and interpret station electrical and mechanical drawings) was selected on the 2012 and 2014 NRC Exams, as well as the 2016 Facility Audit Exam.
This appears to be too frequent for the selection process to be random.
- a. Discussed with facility representative and they will likely select a different K/A.
SRO ES-301-1
- 1. Radiation Control - How does the identified activity test KA 2.3.5 (Ability to use radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.) Additionally, it appears that this activity is from the 2012 NRC Exam and not the 2013 NRC Exam.
- a. Discussed with facility representative and K/A will be changed to KA 2.3.6 (Ability to approve release permits). Will update previous exam date to 2012.
ES-301-2
- 1. (f) Supply Non-ESF Bus from ESF Bus was used in 2016 not 2013.
- a. Discussed with facility representative and the previous exam date revised to 2016.
Scenario N17-1 ES-D-1
- 1. Events 8 and 9 (CV Pump trip and AFW start failure) do not appear to be separate creditable failures (no apparent verifiable actions). They appear to be precursors to a 2nd Major event (loss of heat sink/feed and bleed).
- a. Discussed with facility representative and they were not taking credit for the events as an instrument or component malfunction. They will likely combine the two events into a single Major event (e.g., Loss of Heat Sink).
Scenario N17-2 ES-D-1
- 1. Recommend adding another TS event. The same LCO is exercised in events 3 and 5; resulting in little diversity in the evaluation.
- a. Discussed with facility representative and they will evaluate adding an additional TS event or replace one of the events with an event affecting a different LCO.
Scenario N17-3 ES-D-1
- 1. If the crew changes recommended below are not made, remove one of the TS events.
Two of the 5 SROI candidates end up with 5 TS events otherwise. Eliminating one of the events will balance the TS exposure.
- a. Discussed with facility representative and they will evaluate making the crew change discussed below.
2017 BYRON STATION INITIAL LICENSE EXAMINATION OPERATING TEST OUTLINE REVIEW COMMENTS Scenario N17-4 ES-D-1
- 1. Scenarios in both 2014 and 2016 contained ATWS events which required manual control rod insertion with the only difference being the initiating event. The ATWS response in this scenario does not appear does not appear to be significantly different.
- a. Discussed with facility representative and no change will be made since the addition of the rod speed malfunction significantly alters the event response.
- 2. The same 2014 and 2016 scenarios contained a Failure of the Main Turbine Trip with the same response as in the scenario.
- a. Discussed with facility representative and they will evaluated changing the event response from initiating a turbine runback to an inability to runback the turbine requiring manual isolation of the Main Steam lines.
- 3. Events 6 & 7 (HD Pump Trips resulting in Turbine Runback) appear to be nearly identical to Scenario N14-4 Events 4 and 5.
- a. Discussed with facility representative and there is a delay between starting the standby pump and its subsequent failure. Considering moving the initial pump trip event to earlier in the scenario.
ES-301-5
- 1. Recommend swapping the RO applicant (R-1) on Crew A with the SROI applicant (I-3) from Crew C. This will reduce the TS exposure for the SROI candidate who is the SRO for both scenarios in 1 and 3. The realignment will also 4 of the 5 SROI applicants to be evaluated in all three positions (SRO, ATC, and BOP)
- a. Facility will evaluate making the recommended crew changes.