ML23325A049

From kanterella
Jump to navigation Jump to search
Letter 2023-0062 - Post Exam Submittal
ML23325A049
Person / Time
Site: Byron  Constellation icon.png
Issue date: 11/09/2023
From: Welt H
Constellation Energy Generation
To: April Nguyen
NRC/RGN-III
Travis Iskierka-Boggs
Shared Package
22122A031 List:
References
2023-0062, 50-454/23-301, 50-455/23-301 50-454/OL-23, 50-455/OL-23
Download: ML23325A049 (1)


Text

Constellation C Constellation Energy Generation, LLC (CEG)

Byron Station 4450 N. German Church Road Byron, IL 61010-9794 www.constellationenergy.com November 9, 2023 BYRON Letter: 2023-0062 FILE: 1D.101 April M. Nguyen, Chief Operations Branch Division of Reactor Safety- Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Byron Station, Units 1 and 2 Renewed Facility Operating License No. NPF-37 and NPF-66 NRC Docket No. STN 50-454 and STN 50-455

SUBJECT:

Submittal of 2023-301 Byron Initial License Examination Post-Examination Comments Enclosed are the post-examination materials Byron Generating Station is submitting for initial license exam 2023-301 administered October 16 to October 25, 2023.

In accordance with NUREG-1021, ES 4.4 Section B.7, the following enclosures are being submitted:

  • Graded written examinations including each applicant's original answer and examination cover sheets plus a clean copy of each applicant's answer sheet prior to grading
  • The master answer key(s), annotated to indicate any changes made while administering and grading the examination(s)
  • Any questions asked by the applicants and the answers given to the applicants during the written examination
  • All examination administration and post-examination review comments made by the facility licensee and the applicants after the written examination and operating tests
  • Written examination seating chart
  • Form 1.3-1, Examination Security Agreement, with Pre- and Post- examination signatures current as of November 9, 2023
  • The results of any performance analysis that was performed for the written examination, with recommended substantive changes

LTR: BYRON 2023-0062 November 9, 2023 April M. Nguyen, Chief Page 2 Per our discussion with Travis lskierka-Boggs, we request the NRC withhold public disclosure of the exam in ADAMS for 2 years so we can have the exam available for internal use. In accordance with NU REG 1021, Section 4.4, and discussion with Travis lskierka-Boggs, Completed Form 1.3-1 will be forwarded to the NRC Chief Examiner separately no later than December 8, 2023.

Should you have any questions concerning this letter, please contact Ms. Zoe Cox, Regulatory Assurance Manager, at (815) 406-2800. For questions concerning examination materials, please contact Mr. Barry Mingus, Senior Ops Training Instructor, at (815) 406-3103.

Respectfully, 1/-IV~

Harris Welt Site Vice President Byron Generating Station HW/BM/JA/hh Enclosures cc: Travis lskierka-Boggs - Chief Examiner, NRC Region Ill, with delivered enclosures April M. Nguyen, Chief - Operations Branch NRC, without enclosures John Robbins - NRC Senior Resident Inspector- Byron Station, without enclosures