ML23325A023

From kanterella
Jump to navigation Jump to search
Submittal of Integrated Initial License Training Examination Materials
ML23325A023
Person / Time
Site: Byron  Constellation icon.png
Issue date: 08/02/2023
From:
NRC/RGN-III/DORS/OB
To:
Constellation Energy Generation
Travis Iskierka-Boggs
Shared Package
22122A027 List:
References
BYRON 2023-0038
Download: ML23325A023 (1)


Text

Constellation.

August 2, 2023 L TR:

BYRON 2023-0038 File:

1D.101 John Giessner Regional Administrator - Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Byron Station, Units 1 and 2 Constellation Energy Generation, LLC (CEG)

Byron Station 4450 N German Church Road Byron, IL 61010-9794 www constellationenergy com Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials Byron Generating Station is submitting in support of the initial license exam scheduled for October 16 - 27, 2023, at Byron Generating Station.

This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations and Job Performance Measures. The Integrated Plant Operation Scenario Guides along with the Completed Operating Test Quality Checklist (Form 2.3-2) and Completed Events and Evolutions Checklist (Form 3.4-1) will be provided to the NRC by August 9, 2023.

These examination materials have been developed in accordance with NUREG-1021, Revision 12, "Operator Licensing Examination Standards for Power Reactors." Please note that reference materials are attached to each individual examination question or item.

Some modifications or adjustments to the examination material may be required due to procedural changes.

In accordance with NUREG-1021, Revision 12, Section ES-1.3, Examination Security, please ensure these materials are withheld from public disclosure until after the examinations are complete.

L TR: BYRON 2023-0038 August 2, 2023 Page 2 Should you have any questions concerning this letter, please contact Ms. Zoe Cox, Regulatory Assurance Manager, at (815) 406-2800. For questions concerning examination materials, please contact Mr. Barry Mingus at (815) 406-3185.

Respectfully, ff~

Harris Welt Site Vice President Byron Generating Station HW/BM/ZC/hh Enclosures cc:

Travis lskierka-Boggs, Chief Examiner, NRC Region Ill, with delivered enclosures April M. Nguyen, Chief Operations Branch NRC, without enclosures John Robbins, NRC Senior Resident Inspector, Byron Station, without enclosures

Enclosures:

Control Room systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached Completed Checklists:

1. Written Exam Quality Checklist (Form 2.3-4)
2. Record of Rejected K/A's (Form 4.1-1)

Examination Security Agreements (Form 1.3-1)

RO/SRO Composite Examination with references attached