ML23339A023

From kanterella
Jump to navigation Jump to search
Form 5.1-1 Post Examination Check Sheet (Byron 2023)
ML23339A023
Person / Time
Site: Byron  Constellation icon.png
Issue date: 11/13/2023
From: April Nguyen
NRC/RGN-III/DORS/OB
To:
Constellation Energy Generation
Travis Iskierka-Boggs
Shared Package
22122A031 List:
References
50-454/23-301, 50-455/23-301 50-454/OL-23, 50-455/OL-23
Download: ML23339A023 (1)


Text

Form 5.1-1 Post examination Check Sheet Post examination Check Sheet Facility: Byron Station Dates of Examination: October 16 - 20, 2023 Date Activity Description Complete

1. *Received post examination package from facility licensee and 11/06/2023 verified complete. (ES-4.4)
2. *Reviewed and incorporated any necessary facility and applicant N/A written examination comments. NRC grading of written examination completed. (ES-4.4)
3. *Reviewed and incorporated any necessary facility and applicant N/A operating test comments. NRC grading of operating test completed.

(ES-3.6)

4. *Completed NRC chief examiner review of operating test and written 11/06/2023 examination grading. (ES-3.6 and ES-4.4) 11/17/23
5. Completed licensing official review.
6. Mailed licenses, preliminary results, and pass letters. 11/20/23 11/13/23
7. Notified facility licensee of results.
8. Issued the examination report (refer to Operator Licensing Manual 11/27/2023 Chapter (OLMC) 510, Operator Licensing Examination Reports).
9. Returned reference material after final resolution of any informal N/A NRC staff reviews, hearing demands, or both.
10. Performed examination recordkeeping activities (refer to OLMC 520, 12/05/2023 Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.